RES 20-006RESOLUTION NO. 20-006
A RESOLUTION revising and extending the Comprehensive Street
Program for an additional six (6) years.
WHEREAS, pursuant to the requirements ofRCW 35.77.010, the City of Camas did, by
Resolution No. 19-008 adopt a Comprehensive Street Program for the ensuing six (6) years; and
WHEREAS, said law requires the City revise and extend said Comprehensive Street Program
annually; and
WHEREAS, pursuant to said law, the City Council of the City of Camas being the legislative
body of said City did hold a public hearing on said revised Comprehensive Plan at 7:00 p.m. at the
Special Camas City Council Meeting held on the 1st day of June, 2020; and
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAMAS
AS FOLLOWS:
The Comprehensive Street Program heretofore adopted and revised by the City Engineer for
the City of Camas, as submitted to the City Council for the City of Camas, be and the same is hereby
adopted and extended for an additional six (6) year period from the date thereof.
II
The City Clerk shall file a copy of said revised Comprehensive Street Program for the
ensuing six (6) years, together with a copy of this Resolution, with the Secretary of Transportation of
the State of Washington.
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
Resolution No. 20-006
Page 2
PAS SED by the Council and APPROVED
APPROVED as to form :
City Attorney
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
Report Date: 6/16/2020 Page 1 of 9
FROM:2021 TO:2026
Hearing Date:6/1/2020 Adoption Date:6/15/2020
Amend Date:Resolution No:20-006
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
ALL 6/1/2022 22000 1000 2000 19000
SR-500 (Everett St./Rd.)
NW Lake Rd. to SE 4th St.
from:to:
Widen with bike lanes, sidewalks, illumination,
bridge replacement
Totals 0 0 0 0 22000 0 1000 2000 19000
ALL 6/1/2023 15650 2000 13650
New North Shore E/W Arterial
NE 14th St. to Everett Rd.
from:to:
New construction
Includes Critical Areas and Alignment Investigation
Totals 0 0 0 0 15650 0 0 2000 13650
ALL 1/1/2021 300 50 50 50 150
ADA Access Upgrades
from: Citywide to:
(Ongoing)
Totals 0 0 0 0 300 50 50 50 150
RW 2/1/2022 STBG 478 335 813 600 213
NW 38th Avenue CN 4/1/2024 3400 3400
NW Parker to Grass Valley Park
from:to:
Widening, bike lanes, pedestrian access
Totals 0 478 0 335 4213 0 600 213 3400
ALL 1/1/2021 365 365
NE Goodwin Road
@ NE Ingle Rd.
from:to:
Traffic signal
Totals 0 0 0 0 365 365 0 0 0
ALL 6/1/2021 73 73
NW Brady Road
@ NW Grand Ridge Dr.
from:to:
Intersection safety improvement
Includes left turn lane, illumination, and sight
distance enhancement
Totals 0 0 0 0 73 73 0 0 0
6 21 P 0.10
00
4 03 P
14 0.00328P
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd3rd
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)
3
Co. No.: 06 Co. Name: Clark Co.
City No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
E. Begin & End Termini
G. Structure ID
Project Identification
A. Pin/Project No.
Federal Fund
Code Federal Funds
Agency: City of Camas
Functional ClassPriority NumberImprovement Type(s)StatusB. STIP ID
16
Washington State Department of Transportation Six Year Transportation Improvement Program
Total LengthUtility CodesP
16
1.08
16 2 01 P 2.00
16 1 03 P
0.45 CE YES
17 5 15
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
Report Date: 6/16/2020 Page 2 of 9
FROM:2021 TO:2026
Hearing Date:6/1/2020 Adoption Date:6/15/2020
Amend Date:Resolution No:20-006
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd3rd
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)
3
Co. No.: 06 Co. Name: Clark Co.
City No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
E. Begin & End Termini
G. Structure ID
Project Identification
A. Pin/Project No.
Federal Fund
Code Federal Funds
Agency: City of Camas
Functional ClassPriority NumberImprovement Type(s)StatusB. STIP ID
Total LengthUtility CodesPE 6/1/2024 218 218
NE 9th Street
NE 232nd Ave. to NE 242nd Ave.
from:to:
New construction
Includes Critical Areas and Alignment Investigation
Totals 0 0 0 0 218 0 0 0 218
ALL 6/1/2023 3475 3475
Lake Road
NW Lacamas Lane to NE Everett
from:to:
Widening, sidewalk
Totals 0 0 0 0 3475 0 0 3475 0
ALL 1/1/2023 350 350
NW Lake Road
@ NW Sierra St.
from:to:
Traffic signal
Totals 0 0 0 0 350 0 0 350
ALL 1/1/2023 250 50 200
NW 18th Ave., et al. Path
NW Astor to NW 16th, include NW Hood
from:to:
Pedestrian Path
Totals 0 0 0 0 250 0 0 50
ALL 20860 20860
NE Goodwin Road/28th Street
NW Camas Meadows Dr. to NE 232nd Ave.
from:to:
Widen to 5 lanes with bike lanes, sidewalk west of Ingle
Widen to 3 lanes with bike lanes, sidewalk east of Ingle
Totals 0 0 0 0 20860 0 0 0 20860
ALL 1/1/2024 11900 11900
Crown Road
from: SE 23rd St. to NE 3rd Ave.
Multimodal, turn lanes and intersection improvements
Totals 0 0 0 0 11900 0 0 0 11900
24 P 00
15
1.3
17 11 P 1.7215
16 10 28 P 0.40
P
0.50
0.45168P03
16 12
00 7
16 9
04
P
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
Report Date: 6/16/2020 Page 3 of 9
FROM:2021 TO:2026
Hearing Date:6/1/2020 Adoption Date:6/15/2020
Amend Date:Resolution No:20-006
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd3rd
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)
3
Co. No.: 06 Co. Name: Clark Co.
City No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
E. Begin & End Termini
G. Structure ID
Project Identification
A. Pin/Project No.
Federal Fund
Code Federal Funds
Agency: City of Camas
Functional ClassPriority NumberImprovement Type(s)StatusB. STIP ID
Total LengthUtility CodesALL 1/1/2025 WSDOT 35000 35000 35000
SR-14 West Camas Slough Bridge
from:to:
Widen to 4 lanes
NOTE: PE phase began 1/2006
Totals 0 0 35000 0 35000 0 0 0 35000
ALL 1/1/2023 1690 1690
Bybee Road Realignment
SE 15th St. to SE 20th St.
from:to:
New construction
Totals 0 0 0 0 1690 0 1690 0
ALL 1/1/2023 1000 1000
NW/NE 6th Avenue Corridor Improvements
NW Norwood to NE Garfield
from:to:
Access and multimodal upgrades
Totals 0 0 0 0 1000 0 0 1000 0
PE 1/1/2026 5 5
North Dwyer Creek Master Plan Street "B"
NW Friberg St./Strunk to NW Larkspur St.
from:to:
New construction
Totals 0 0 0 0 5 0 0 0 5
PE 1/1/2026 5 5
NW Payne Street
NW Lake Rd. to NW Camas Meadows Dr.
from:to:
Widening, bike lanes, sidewalk
Totals 0 0 0 0 5 0 0 0 5
ALL 1/1/2024 540 540
NW 23rd Avenue
Nw Astor to NW Sierra
from:to:
Widening, sidewalk
Totals 0 0 0 0 540 0 0 0 540
00 16 15 P 0.90
00 17 03 P 0.40
03 P 2.25
1.70
01
P24
12 13
04
17 14
14 15
17 18
P 0.05
P 0.23
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
Report Date: 6/16/2020 Page 4 of 9
FROM:2021 TO:2026
Hearing Date:6/1/2020 Adoption Date:6/15/2020
Amend Date:Resolution No:20-006
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd3rd
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)
3
Co. No.: 06 Co. Name: Clark Co.
City No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
E. Begin & End Termini
G. Structure ID
Project Identification
A. Pin/Project No.
Federal Fund
Code Federal Funds
Agency: City of Camas
Functional ClassPriority NumberImprovement Type(s)StatusB. STIP ID
Total LengthUtility CodesCN 1/1/2024 64 64
NW Leadbetter Drive
NW Lake Rd. to NW Fremont St.
from:to:
Sidewalk
Totals 0 0 0 0 64 0 0 0 64
ALL 6/1/2024 165 165
NE 28th Street & NE 232nd Avenue
from:to:
Intersection improvements
Totals 0 0 0 0 165 0 0 0 165
PE 1/1/2025 5 5
Brady Road
McIntosh to West City Limits
from:to:
Bike & Pedestrian Improvements
Totals 0 0 0 0 5 0 0 0 5
PE 1/1/2024 130 130
NW Astor Street/NW 11th Avenue RW 1/1/2025 130 130
NW 16th Ave. to McIntosh Rd.CN 6/1/2026 2040 2040
from:to:
Widening, bike lanes, sidewalk
Totals 0 0 0 0 2300 0 0 0 2300
PE 1/1/2024 5 5
NW 18th Avenue, et al
NW Astor to NW 16th, include NW Hood
from:to:
Widen curb, sidewalk
Totals 0 0 0 0 5 0 0 0 5
PE 1/1/2024 5 5
NW 18th Avenue
NW Whitman St. to NW Brady Rd.
from:to:
New construction with bike lanes
Totals 0 0 0 0 5 0 0 0 5
17
P
28
20 0.0017
01
17 22 03
23 03
16
16
16 24
21
19 P 0.15
0.26
P 0.62
P 0.51
24 P
.5004P
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
Report Date: 6/16/2020 Page 5 of 9
FROM:2021 TO:2026
Hearing Date:6/1/2020 Adoption Date:6/15/2020
Amend Date:Resolution No:20-006
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd3rd
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)
3
Co. No.: 06 Co. Name: Clark Co.
City No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
E. Begin & End Termini
G. Structure ID
Project Identification
A. Pin/Project No.
Federal Fund
Code Federal Funds
Agency: City of Camas
Functional ClassPriority NumberImprovement Type(s)StatusB. STIP ID
Total LengthUtility CodesPE 1/1/2025 5 5
NW 18th Avenue
NW Whitman St. to West City Limits
from:to:
Widening, bike lanes
Totals 0 0 0 0 5 0 0 0 5
ALL 1/1/2026 2190 2190
NE 43rd Avenue
from: SR-500 to: East City Limits
Widen to 3 lanes with bike lanes, sidewalk
Totals 0 0 0 0 2190 0 0 0 2190
PE 1/1/2026 5 5
NW 43rd/NW Astor - NW Sierra to NW 38th
from:to:
Widening, bike lanes, sidewalk
Totals 0 0 0 0 5 0 0 0 5
PE 6/1/2025 5 5
NE 232nd Avenue
NE 28th to NE 9th St.
from:to:
Widen to 3 lanes with bike lanes, sidewalk
Totals 0 0 0 0 5 0 0 0 5
PE 1/1/2026 5 5
North Dwyer Creek Master Plan Street "A"
NW Lake Rd. to NW Camas Meadows Dr.
from:to:
New construction
Totals 0 0 0 0 5 0 0 0 5
PE 1/1/2026 5 5
NW McIntosh Road
NW Brady Rd. to NW 11th Ave.
from:to:
Widening, bike lanes, sidewalk
Totals 0 0 0 0 5 0 0 0 5
1.2
17 28 15
P
16 27 03 P .50
17 26 P 0.36
16 25 P 0.4003
03
0.97
29
30 15 P
P
0.641500
17
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
Report Date: 6/16/2020 Page 6 of 9
FROM:2021 TO:2026
Hearing Date:6/1/2020 Adoption Date:6/15/2020
Amend Date:Resolution No:20-006
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd3rd
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)
3
Co. No.: 06 Co. Name: Clark Co.
City No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
E. Begin & End Termini
G. Structure ID
Project Identification
A. Pin/Project No.
Federal Fund
Code Federal Funds
Agency: City of Camas
Functional ClassPriority NumberImprovement Type(s)StatusB. STIP ID
Total LengthUtility CodesALL 1/1/2026 6100 6100
NE Woodburn Drive
SE 283rd Ave. to SE 15th St.
from:to:
New construction
Includes 23rd St. realignment
Totals 0 0 0 0 6100 0 0 0 6100
PE 1/1/2026 5 5
SE 15th Street/Nourse Road
from: Camas High School to: NE 283rd Ave.
Widen to 3 lanes with bike lanes, sidewalk
Totals 0 0 0 0 5 0 0 0 5
PE 1/1/2026 5 5
NE 18th Street
NE 192nd Ave. to NE Goodwin Rd.
from:to:
New construction
(potential alternate alignment)
Totals 0 0 0 0 5 0 0 0 5
PE 1/1/2026 5 5
NE 28th Street
NE 232nd Ave. to NE 242nd Ave.
from:to:
Widen to 3 lanes with bike lanes
Totals 0 0 0 0 5 0 0 0 5
PE 1/1/2026 5 5
NW Camas Meadows Drive
NE 13th St. to NE 18th St.
from:to:
New construction
(potential alternate alignment)
Totals 0 0 0 0 5 0 0 0 5
PE 6/1/2026 5 5
NE 242nd Avenue
NE 28th St. to NE 9th St.
from:to:
Widen to 3 lanes with bike lanes, sidewalk
Totals 0 0 0 0 5 0 0 0 5
00 31 01
07 32 15
00
34
36
17
16
00
15 P 0.50
P .70
P 0.59
0.70P
15 0.67
35 15 P 0.20
33
15
P
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
Report Date: 6/16/2020 Page 7 of 9
FROM:2021 TO:2026
Hearing Date:6/1/2020 Adoption Date:6/15/2020
Amend Date:Resolution No:20-006
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd3rd
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)
3
Co. No.: 06 Co. Name: Clark Co.
City No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
E. Begin & End Termini
G. Structure ID
Project Identification
A. Pin/Project No.
Federal Fund
Code Federal Funds
Agency: City of Camas
Functional ClassPriority NumberImprovement Type(s)StatusB. STIP ID
Total LengthUtility CodesPE 6/1/2026 5 5
NE Ingle Road Extension
Goodwin to 232nd Ave
from:to:
New construction
Totals 0 0 0 0 5 0 0 0 5
ALL 6/1/2026 280 280
NW Maryland Street
NW 19th to NW 24th
from:to:
New construction
Totals 0 0 0 0 280 0 0 0 280
ALL 6/1/2026 280 280
NE Nevada Street
NE 3rd to NE 6th
from:to:
Reconstruct
Totals 0 0 0 0 280 0 0 0
ALL 1/1/2026 350 350
NE Goodwin Road @ NW Camas Meadows Drive
from:to:
Traffic signal
Totals 0 0 0 0 350 0 0 0 350
PE 1/1/2026 5 5
NW Pacific Rim @ Parker Street
from:to:
Traffic signal
Totals 0 0 0 0 5 0 0 0 5
PE 1/1/2026 5 5
SR-500 @ Leadbetter Road
from:to:
Access Control
Totals 0 0 0 0 5 0 0 0 5
00 40 24
19 39
37
42 15 P 00
16 41 15 P
16
38 01
00
P 00
P 0.17
P 0.25
04
15 P 1.00
19
00
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
Report Date: 6/16/2020 Page 8 of 9
FROM:2021 TO:2026
Hearing Date:6/1/2020 Adoption Date:6/15/2020
Amend Date:Resolution No:20-006
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd3rd
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)
3
Co. No.: 06 Co. Name: Clark Co.
City No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
E. Begin & End Termini
G. Structure ID
Project Identification
A. Pin/Project No.
Federal Fund
Code Federal Funds
Agency: City of Camas
Functional ClassPriority NumberImprovement Type(s)StatusB. STIP ID
Total LengthUtility CodesPE 6/1/2026 5 5
SR-500 @ New E/W Arterial
from:to:
Intersection improvements
Totals 0 0 0 0 5 0 0 0 5
15 P 00 PE 6/1/2026 5 5
NE 28th Street @ 242nd Avenue
from:to:
Intersection improvements
Totals 0 0 0 0 5 0 0 0 5
24 P 00 PE 6/1/2026 5 5
SR-500
@ NE 14th Ave.
from:to:
Controlled Access
Totals 0 0 0 0 5 0 0 0 5
PE 6/1/2026 5 5
NE 232nd Avenue @ Ingle Extension
from:to:
Roundabout
Totals 0 0 0 0 5 0 0 0 5
CN 6/1/2021 4200 700 700 700 2100
Pavement Treatments (maintenance & preservation)
from:to:
Overlays, surface treatments
Totals 0 0 0 0 4200 700 700 700 2100
ALL 1/1/2021 CDBG 250 1500 250 250 250 750
Reconstructs
from: Citywide to:
Totals 0 250 0 0 1500 250 250 250 750
00 48 04 P 00
00004747P
00 46 15 P 00
16 44
16 45
43 15 P 0016
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
Report Date: 6/16/2020 Page 9 of 9
FROM:2021 TO:2026
Hearing Date:6/1/2020 Adoption Date:6/15/2020
Amend Date:Resolution No:20-006
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd3rd
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)
3
Co. No.: 06 Co. Name: Clark Co.
City No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
E. Begin & End Termini
G. Structure ID
Project Identification
A. Pin/Project No.
Federal Fund
Code Federal Funds
Agency: City of Camas
Functional ClassPriority NumberImprovement Type(s)StatusB. STIP ID
Total LengthUtility CodesALL 1/1/2021 150 25 25 25 75
Sidewalk Projects
from:to:
Sidewalk installations Citywide, including curb ramps
Totals 0 0 0 0 150 25 25 25 75
28 P 00 ALL 1/1/2023 200 50 150
Shared Path Improvements
Citywide
from:to:
Totals 0 0 0 0 200 0 0 50 150
ALL 1/1/2021 300 50 50 50 150
Safety Projects
from:to:
Future safety projects
Includes traffic revisions, NW Fargo Curve Safety
Analysis
Totals 0 0 0 0 300 50 50 50 150
0 50
00 51 21 P 00
00 49 28 P 00
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
1 SR 500 (Everett St/Rd)2 North Shore East/West Arterial3 ADA Access Upgrades Citywide4 NW 38th Ave (Ph 3)5 NE Goodwin Road / Ingle Rd Signal6 NW Brady Rd at NW Grand Ridge Dr. Intersection Imp.7 NE 9th St8 NW Lake Rd.9 Lake Rd. & NW Sierra St. Signal10 16th Ave/ Hood / 18th Ave Path11 NE Goodwin Rd/28th St12 SE Crown Rd13 SR 14 - West Camas Slough Bridge14 Bybee Rd15 NW/NE 6th Ave Corridor Imp16 Street "B" (North Dwyer Creek Area)17 NW Payne St.18 NW 23rd Ave19 NW Leadbetter Dr Path20 NE 28th St & NE 232nd Ave Intersection Imp.21 NW Brady Rd Ped & Bike Improvements22 NW Astor St.23 NW 16th Ave/Hood/18th Ave24 NW 18th Ave25 NW 18th Ave/Payne Rd26 NE 43rd Ave27 NW Astor St. /43rd Ave28 NE 232nd Ave29 Street "A" (North Dwyer Creek Area)30 NW McIntosh Rd31 NW Woodburn Dr.32 SE 15th St./Norse Rd33 NE 18th St (192nd to Goodwin)34 NE 28th St35 NW Camas Meadows Dr (West)36 NE 242nd Ave37 NE Ingle Rd Extension38 NW Maryland St39 NE Nevada St.40 NE Goodwin / Camas Meadows Signal41 NW Pacific Rim / Parker St. SignalCity of Camas2021 – 2026Six Year Street Priorities2020JE Six Year Street Plan Map 2021‐2026 D5‐A3938281322313230418242127253317163435126719142036815237291134041512923106DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
Appendices
Six Year Form Coding Instructions
Heading
Agency Enter name of the sponsoring agency.
County No. Enter the assigned number (see LAG Appendix 21.44).
City No. Enter the assigned number (see LAG Appendix 21.45).
MPO/RTPO Enter the name of the associated MPO (if located within urbanized area) or
RTPO (if located in a rural area).
Hearing Date Enter the date of the public hearing.
Adoption Date Enter the date this program was adopted by council or commission.
Resolution No. Enter Legislative Authority resolution number (if applicable.)
Amendment Date Enter the date this program was amended by council or commission.
Column Number
1. Functional Classification. Enter the appropriate 2-digit code denoting the Federal
Functional Classification. (Note: The Federal Functional Classification must be one
approved by FHWA.)
Description
00- No Classification
Rural (< 5000 pop.) Urban (> 5000 pop.)
01 - Interstate 11 - Interstate
02 - Principal Arterials 12 - Freeways & Expressways
06 - Minor Arterials 14 - Other Principal Arterials
07 - Major Collector 16 - Minor Arterial
08 - Minor Collector 17 - Collector
09 - Local Access 19 - Local Access
1. Priority Numbers. Enter local agency number identifying agency project priority
(optional).
2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b)
Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route
Number;
(e) Beginning and Ending Termini (milepost or street names); and (f) Describe the Work
to be Completed.
4. Improvement Type Codes. Enter the appropriate federal code number.
SEE APPENDIX A
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
5. Funding Status. Enter the funding status for the entire project or phase that
describes the current status.
S - Project is ‘selected’ by the appropriate selection body and funding has been
secured by the lead agency.
P - Project is subject to selection by an agency other than the lead and is
listed for planning purposes. (Funding has not been determined.)
6. Total Length. Enter project length to the nearest hundredth (or code “00” if not
applicable).
7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that need to
be relocated or are impacted by the construction project.
C - Cable TV G - Gas
O - Other P - Power
S - Sewer (other than agency-owned) T - Telephone
W – Water
8. Project Phase. Select the appropriate phase code of the project.
PE - Preliminary Engineering, including Design (or Planning)
RW - Right of Way or land acquisition
CN - Construction only (or transit planning or equipment purchase)
ALL - All Phases: from Preliminary Engineering through Construction
9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the
selected phase of the project is actually expected to start.
10. Federal Fund Code. Enter the Federal Fund code from the table.
SEE APPENDIX C
11. Federal Funds. Enter the total federal cost (in thousands) of the phase
regardless of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed state funds
to be used on this project.
SEE APPENDIX C
13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase
regardless of when the funds will be spent.
14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase
regardless of when the funds will be spent.
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto-calculation in the
“STIP Too” program.)
16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the
estimated expenditures (in thousands) of dollars by year. (For Local Agency use.)
20. Environmental Data Type. Enter the type of environmental assessment that will be
required for this project. (This is “required” for Federally funded projects, but may be
filled in for state or locally funded projects.)
EIS - Environmental Impact Statement
EA - Environmental Assessment
CE - Categorical Exclusion
21. R/W Certification. Click Y if Right of Way acquisition is or will be required. If yes,
enter R/W
Certification Date, if known. (This is “required” for Federally funded projects
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
APPENDIX A
IMPROVEMENT TYPE CODES
01 New Construction Roadway
03 Reconstruction, Added Capacity
04 Reconstruction, No Added Capacity
05 4R Maintenance Resurfacing
06 4R Maintenance - Restoration & Rehabilitation
07 4R Maintenance - Relocation
08 Bridge, New Construction
10 Bridge Replacement, Added Capacity
11 Bridge Replacement, No Added Capacity
13 Bridge Rehabilitation, Added Capacity
14 Bridge Rehabilitation, No Added Capacity
15 Preliminary Engineering
16 Right of Way
17 Construction Engineering
18 Planning
19 Research
20 Environmental Only
21 Safety
22 Rail/Highway Crossing
23 Transit
24 Traffic Management/Engineering - HOV
25 Vehicle Weight Enforcement Program
26 Ferry Boats
27 Administration
28 Facilities for Pedestrians and Bicycles
29 Acquisition of Scenic Easements and Scenic or Historic Sites
30 Scenic or Historic Highway Programs
31 Landscaping and Other Scenic Beautification
32 Historic Preservation
33 Rehab & Operation of Historic Transp. Buildings, Structures, Facilities
34 Preservation of Abandoned Railway Corridors
35 Control and Removal of Outdoor Advertising
36 Archaeological Planning & Research
37 Mitigation of Water Pollution due to Highway Runoff
38 Safety and Education for Pedestrians/Bicyclists
39 Establishment of Transportation Museums
40 Special Bridge
41 Youth Conservation Service
42 Training
43 Utilities
44 Other
45 Debt Service
47 Systematic Preventive Maintenance
APPENDIX B
Void
DocuSign Envelope ID: 31DFD05B-F610-4EDB-86B1-6DC28771E651
APPENDIX C
FEDERAL FUND CODES
5307 FTA Urbanized Area Formula Program
5309(Bus) FTA Bus and Bus Facilities
5309(FG) FTA Fixed Guideway Modernization
5309(NS) FTA New Starts
5310 FTA Elderly Persons and Persons with Disabilities
5311 FTA Rural Area Formula Grants
5316 FTA Job Access & Reverse Commute Program (JARC)
5317 FTA New Freedom Program
FTA Discretionary Discretionary Programs such as Alternatives Analysis (5339) and
TIGER Program
BIA Bureau of Indian Affairs
BR Bridge Replacement/Rehabilitation Program
CBI Coordinated Border Infrastructure
CDBG Community Development Block Grant (Dept. of Commerce)
CMAQ Congestion Mitigation and Air Quality
DEMO Demonstration Projects (High Priority, Sect. 112, 115, 117, 125 and 129)
Discretionary- FBD Ferry Boat Discretionary
Discretionary- IMD Interstate Maintenance Discretionary
Discretionary- ITS Intelligent Transportation Systems
Discretionary- PLH Public Lands Highways (Federal Lands)
Discretionary- SB Scenic Byways
Discretionary- STP Surface Transportation Priorities
Discretionary- TCSP Transportation, Community & System Preservation Program
DOD Department of Defense
FMSIB Freight Mobility Strategic Investment Board
IM Interstate Maintenance
IRR Indian Reservation Roads
NHS National Highway System
SRTS Safe Routes to Schools
STBG Surface Transportation Block Grant
STP Surface Transportation Program (WSDOT Use Only)
STP(E) Surface Trans. Program - Enhancements
STP(L) Surface Trans. Program - Legislative Earmarks
STP(S) Surface Trans. Program- Safety (Includes Highway) Safety Improvement
Program, Hazard Elimination, Railway/Highway Crossing Program and 2010-
15 County Road Safety Program)
STP(R) Surface Trans. Program - Rural Regionally Selected
STP(U) Surface Trans. Program - Urban Regionally Selected
STATE FUND CODES
CRAB County Road Administration Board
CW Connecting Washington
FMSIB Freight Mobility Strategic Investment Board
PWTF Public Works Trust Fund
SRTS Safe Routes to Schools
TIB Transportation Improvement Board
TPP Transportation Partnerships Program
WSDOT WSDOT funds
OTHER Any other state funds not listed