RES 18-005RESOLUTION NO. 18-005 A RESOLUTION revising and extending the Comprehensive Street Program for an additional six (6) years. WHEREAS, pursuant to the requirements of RCW 3 5.77. 0 10, the City of Camas did, by Resolution No. 17-006 adopt a Comprehensive Street Program for the ensuing six (6) years; and WIMREAS, said law requires the City revise and extend said Comprehensive Street Program annually; and WHEREAS, pursuant to said law, the City Council of the City of Camas being the legislative body of said City did hold a public hearing on said revised Comprehensive Plan at 7:00 p.m. at the Camas Municipal Center in Camas, Washington,, -on the 4th day of June,, 2017; and WHEREAS, there were no written or oral objections to the revised Comprehensive Plan as prepared by the City of Camas relative to the street program for the ensuingslx( 6) years within the City of Camas. NOW,, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF TIS CITY OF CAMAS AS FOLLOWS: 11 The Comprehensive Street Program heretofore adopted and revised by the City Engineer for the City of Camas, as submitted to the City Council for the City of Camas, be and the same is hereby adopted and extended for an additional six (6) year period from the date thereof. II The City Clerk shall file a copy of said revised Comprehensive Street Program for the ensuing six (6) years, together with a copy of this Resolution, with the Secretary of Transportation of the State of Washington. Resolution No. 18-005 Page 2 PASSED by the Council and APPROVE SIGNED ATTEST: APPROVED as to form: City Attorney by the r this 1 day of June N W&W I Clerk 20184F q�� City of Camas 2019-2024 Six Year Street Priorities 1 NW Brady Rd 2 NW Larkspur St 3 Lake Rd. & Everett St. Intersection Improvements 4 Washougal River Bridge 5 ADA Access Upgrades Citywid�5 6 NW 38th Ave (Ph 3) 7 NW 23rd Ave 8 NE Goodwin Rd/28th St J 9 NE Goodwin Road / Ingle Rd Signal 10 NW Leadbetter Dr Path 11 SR 14 - West Camas Slough Bridge 12 Bybee Rd 13 NW/NE 6th Ave Corridor Imp 14 NE 28th St & NE 232nd Ave Intersection Improvements 15 NW Lake Rd. 16 North Shore East/West Arterial 17 NE 9th St 18 SR 500 (Everett St/Rd) 19 NW Astor St. 20 NW 16th Ave/Hood/18th Ave 21 NW 18th Ave 22 NW 18th Ave/Payne Rd 23 NE 43rd Ave 24 NW Astor St. /43rd Ave 25 NW Brady Rd Ped & Bike Improvements 26 Street "B" (North Dwyer Creek Area) 27 NW Payne St. 28 Street "A" (North Dwyer Creek Area) 29 NW McIntosh Rd 30 NW Woodburn Dr. 31 SE 15th St./Norse Rd 32 NE 18th St (192nd to Goodwin) 33 NE 28th St 34 NW Camas Meadows Dr (West) 35 NE 232nd Ave 36 NE 242nd Ave 37 NW Ingle Rd Extension 38 NW Maryland St 39 NE Nevada St. 40 Lake Rd. & NW Sierra St. Signal 41 NE Goodwin / Camas Meadows Signal 42 NW Pacific Rim / Parker St. Signal 180503-440 Six Year Street Plan Map 2019-2024 FINAL CCitycyf �: auras WASHINGTON Washington State Department of Transportation Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC Six Year Transportation Improvement Program FROM: 2019 TO: 2024 Hearing Date: 6/4/2018 Adoption Date: 6/18/2018 Amend Date: Resolution No: 18-005 Report Date: 6/12/2018 Page I of 10 Project Identification Project Costs in Thousands of Dollars Federally Funded j A. Pin/Project No. B. STIP ID E o Expenditure Schedule (Local Agency) Projects Only Fund Source Information a z C. Project Title y > ;, a T w Phase Start S ';, :, .c D. Road Name or Number o m `" Federal Fund State Fund Envir. R/W .� E. Begin & End Termini a F- E F°- „ .o (yyyy) Code Federal Funds Code State Funds Local Funds Total Funds 1st 2nd 3rd 4th thin 6th Type Required w a F. Project Description G. Structure ID a. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 CN 7/1/2019 OTHER 6000 6000 5000 1000 NW Brady Road P NW 16th to NW 25th C 16 1 from: to: 03 S 0.63 G CE YES Widening, bike lanes T Totals 0 0 6000 0 6000 5000 1000 0 0 CN 8/1/2018 TIB 2510 713 3223 3223 NW Larkspur Street W NW Lake Rd. to 6200 Block S 16 2 from: to: 03 S 0.13 P CE YES Widening, sidewalk T C G Totals 0 0 2510 713 3223 3223 0 0 0 ALL 1/1/2019 OTHER 6965 6965 1340 5625 Lake Road &Everett Intersection improvements 16 3 from: to: 24 P 0.00 YES Totals 0 0 0 6965 6965 1340 5625 0 0 PE 7/1/2018 BR 441 69 510 510 NE 3rd Avenue Washougal River Bridge RW 3/1/2019 BR 60 10 70 CN 6/1/2020 BR 1410 1000 410 0� 4 from: to: 14 S 00 NO Seismic rating, scour critical, and footing rehabilitation Totals 0 1911 0 79 510 580 1000 410 0 ALL 1/1/2019 300 300 50 50 50 150 ADA Access Upgrades 14 5 from: Citywide to: 28 P 0.00 NO (Ongoing) Totals 0 0 0 300 300 50 50 50 150 ALL 1/1/2022 3940 3940 3940 NW 38th Avenue P NW Parker to Grass Valley Park C 16 6 from: to: 03 P 0.45 G CE YES Widening, bike lanes T Totals 0 0 0 3940 3940 0 0 0 3940 Report Date: 6/12/2018 Page I of 10 Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC FROM: 2019 TO: 2024 Hearing Date: 6/4/2018 Adoption Date: 6/18/2018 Amend Date: Resolution No: 18-005 Report Date: 6/12/2018 Page 2 of 10 Project Identification Project Costs in Thousands of Dollars Federally Funded jA. Pin/Project No. B. STIP ID E o Expenditure Schedule (Local Agency) Projects Only Fund Source Information z C. Project Title y a > , m a T w Phase Start S 'i5 :, 'c D. Road Name or Number > a F- `n :? Federal Fund State Fund Federal Funds State Funds Local Funds Total Funds Envir. R/W .� E. Begin & End Termini E F°- „ .o (yyyy) Code Code 1st 2nd 3rd 4th thin 6th Type Required w a F. Project Description G. Structure ID a. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ALL 1/1/2019 540 540 540 NW 23rd Avenue Nw Astor to NW Sierra 17 7 from: to: 04 P 0.23 YES Widening, sidewalk Totals 0 0 0 540 540 540 0 0 0 ALL 1/1/2024 STP(U) 6880 OTHER 7600 6380 20860 20860 NE Goodwin Road/28th Street NW Camas Meadows Dr. to NE 232nd Ave. 7 8 from: to: 15 P 1.72 CE YES Widen to 5 lanes with bike lanes west of Ingle Widen to 3 lanes with bike lanes east of Ingle Totals 0 6880 7600 6380 20860 0 0 0 20860 PE 6/1/2022 5 5 5 NE Goodwin Road @ NE Ingle Rd. 7 9 from: to: 15 P 00 Traffic signal Totals 0 0 0 5 5 0 0 0 5 CN 1/1/2021 62 62 62 NWLeadbetter Drive P NW Lake Rd. to NW Fremont St. C 17 10 from: to: 28 P 0.15 T NO Sidewalk G W S Totals 0 0 0 62 62 0 0 0 62 ALL 1/1/2024 WSDOT 25000 25000 2500 SR -14 West Camas Slough Bridge 12 11 from: to: 03 P 2.25 NO Widen to 4 lanes NOTE: PE phase began 1/2006 Totals 0 0 25000 0 25000 0 0 0 2500 ALL 1/1/2019 1630 1630 1630 Bybee Road Realignment C SE 15th St. to SE 20th St. S 17 12 from: to: 01 P 0.05 W YES New construction G P T Totals 0 0 0 1630 1630 1630 0 0 0 Report Date: 6/12/2018 Page 2 of 10 Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC FROM: 2019 TO: 2024 Hearing Date: 6/4/2018 Adoption Date: 6/18/2018 Amend Date: Resolution No: 18-005 Report Date: 6/12/2018 Page 3 of 10 Project Identification Project Costs in Thousands of Dollars Federally Funded jA. Pin/Project No. B. STIP ID E o Expenditure Schedule (Local Agency) Projects Only Fund Source Information a z C. Project Title y > m a T w Phase Start S 't :, 'c D. Road Name or Number , > F- `n :? - Federal Fund State Fund Federal Funds State Funds Local Funds Total Funds Envir. R/W .� E. Begin & End Termini a E F „ .o (yyyy) Code Code 1st 2nd 3rd 4th thio 6th Type Required w a F. Project Description G. Structure ID a. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ALL 1/1/2020 OTHER 1000 1000 1000 NW/NE 6th Avenue Corridor Improvements NW Norwood to NE Garfield 14 13 from: to: 24 P 1.70 NO Access and multimodal upgrades Totals 0 0 1000 0 1000 0 1000 0 0 ALL 6/1/2020 160 160 160 NE 28th Street & NE 232nd Avenue 17 14 from: to: 24 P 0.00 NO Intersection improvements Totals 0 0 0 160 160 0 160 0 0 ALL 6/1/2022 3475 3475 3475 Lake Road NW Lacamas Lane to NE Everett 16 15 from: to: 03 P 0.45 YES Widening, sidewalk Totals 0 0 0 3475 3475 0 0 0 3475 PE 6/1/2022 430 430 430 New North Shore E/W Arterial NE 14th St. to Everett Rd. 16 16 from: to: 15 P 2.00 New construction Includes Critical Areas and Alignment Investigation Totals 0 0 0 430 430 0 0 0 430 PE 6/1/2023 218 218 218 NE 9th Street NE 232nd Ave. to NE 242nd Ave. 00 17 from: to: 15 P 0.50 New construction Includes Critical Areas and Alignment Investigation Totals 0 0 0 218 218 0 0 0 218 PE 6/1/2024 5 5 5 SR -500 (Everett SURd) NW Lake Rd. to SE 4th St. I G 18 from: to: 15 P 1.08 Widen with bike lanes, sidewalks, illumination Totals 0 0 0 5 5 0 0 0 5 Report Date: 6/12/2018 Page 3 of 10 Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC FROM: 2019 TO: 2024 Hearing Date: 6/4/2018 Adoption Date: 6/18/2018 Amend Date: Resolution No: 18-005 Report Date: 6/12/2018 Page 4 of 10 Project Identification Project Costs in Thousands of Dollars Federally Funded jA. Pin/Project No. B. STIP ID E o Expenditure Schedule (Local Agency) Projects Only Fund Source Information a z C. Project Title y > m a T w Phase Start S 't :, 'c D. Road Name or Number , > a F- `n :? - „ (yyyy) Federal Fund State Fund Federal Funds State Funds Local Funds Total Funds Envir. R/W .� E. Begin & End Termini E F°- .o Code Code 1st 2nd 3rd 4th thin 6th Type Required w a F. Project Description G. Structure ID a. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2022 125 125 125 NWAstor StreebW11thAvenue P RW 1/1/2023 125 125 125 NW 16th Ave. to McIntosh Rd. C CN 6/1/2024 1965 1965 1965 17 19 from: to: 03 P 0.62 G YES Widening, bike lanes T Includes path on Forest Home Road from Forest Home Lane to Astor Street Totals 0 0 0 2215 2215 0 0 0 2215 PE 1/1/2022 5 5 5 NW 18th Avenue, et al S NW Astor to NW 16th, include NW Hood W 16 20 from: to: 03 P 0.51 P YES Widen curb, sidewalk T C Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2022 5 5 5 NW 18th Avenue P NW Whitman St. to NW Brady Rd. G 16 21 from: to: 01 P 0.26 T New construction with bike lanes C W S Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2023 5 5 5 NW 18th Avenue W NW Whitman St. to West City Limits S 16 22 from: to: 03 P 0.40 P Widening, bike lanes T C G Totals 0 0 0 5 5 0 0 0 5 ALL 1/1/2024 2110 2110 2110 NE 43rd Avenue C S 17 23 from: SR -500 to: East City Limits 03 P 0.36 G YES Widen to 3 lanes with bike lanes P T Totals 0 0 0 2110 2110 0 0 0 2110 PE 1/1/2024 5 5 5 NW 43rd/NW Astor - NW Sierra to NW 38th S P 16 24 from: to: 03 P .50 C Widening, bike lanes G T Totals 0 0 0 5 5 0 0 0 5 Report Date: 6/12/2018 Page 4 of 10 Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC FROM: 2019 TO: 2024 Hearing Date: 6/4/2018 Adoption Date: 6/18/2018 Amend Date: Resolution No: 18-005 Report Date: 6/12/2018 Page 5 of 10 Project Identification Project Costs in Thousands of Dollars Federally Funded jA. Pin/Project No. B. STIP ID E o Expenditure Schedule (Local Agency) Projects Only Fund Source Information a z C. Project Title y > p, m a T w Phase Start S 't :, 'c D. Road Name or Number > a F- `n :? - „ (yyyy) Federal Fund State Fund Federal Funds State Funds Local Funds Total Funds Envir. R/W .� E. Begin & End Termini E F°- .o Code Code 1st 2nd 3rd 4th thin 6th Type Required w a F. Project Description G. Structure ID a. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2024 5 5 5 Brady Road McIntosh to West City Limits 16 25 from: to: 04 P .50 Bike & Pedestrian Improvements Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2024 5 5 5 North Dwyer Creek Master Plan Street "B" C NW Friberg St./Strunk to NW Larkspur St. S 00 26 from: to: 15 P 0.90 W New construction G P T Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2024 5 5 5 NW Payne Street C NW Lake Rd. to NW Camas Meadows Dr. G 00 27 from: to: 03 P 0.40 P Widening T Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2024 5 5 5 North Dwyer Creek Master Plan Street "A C NW Lake Rd. to NW Camas Meadows Dr. S 00 28 from: to: 15 P 0.64 W New construction G P T Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2024 5 5 5 NW McIntosh Road P NW Brady Rd. to NW 11th Ave. G 17 29 from: to: 15 P 1.2 C Widening, bike lanes T Totals 0 0 0 5 5 0 0 0 5 ALL 1/1/2022 5870 5870 5870 NE Woodburn Drive C SE 283rd Ave. to SE 15th St. S 00 30 from: to: 01 P .70 W YES New construction G hicludes 23rd St. realignment P T Totals 0 0 0 5870 5870 0 0 0 5870 Report Date: 6/12/2018 Page 5 of 10 Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC FROM: 2019 TO: 2024 Hearing Date: 6/4/2018 Adoption Date: 6/18/2018 Amend Date: Resolution No: 18-005 Report Date: 6/12/2018 Page 6 of 10 Project Identification Project Costs in Thousands of Dollars Federally Funded jA. Pin/Project No. B. STIP ID E o Expenditure Schedule (Local Agency) Projects Only Fund Source Information a z C. Project Title y > m a T w Phase Start S 't :, 'c D. Road Name or Number , > F- `n :? - Federal Fund State Fund Federal Funds State Funds Local Funds Total Funds Envir. R/W .� E. Begin & End Termini a E F°- „ .o (yyyy) Code Code 1st 2nd 3rd 4th thin 6th Type Required w a F. Project Description G. Structure ID a. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2024 5 5 5 SE 15th Street/Nourse Road C S 07 31 from: Camas High School to: NE 283rd Ave. 15 P 0.59 W Widen to 3 lanes with bike lanes G P T Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2024 5 5 5 NE 18th Street NE 192nd Ave. to NE Goodwin Rd. 00 32 from: to: 15 P 0.67 New construction (potential alternate alignment) Totals 0 0 0 5 5 0 0 0 5 PE 1/1/20247 5 5 5 NE 28th Street NE 232nd Ave. to NE 242nd Ave. 17 33 from: to: 15 P 0.50 Widen to 3 lanes with bike lanes Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2024 5 5 5 NW Camas Meadows Drive NE 13th St. to NE 18th St. 16 34 from: to: 15 P 0.20 New construction (potential alternate alignment) Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2024 5 5 5 NE 232nd Avenue NE 28th to NE 9th St. 17 35 from: to: 15 P 0.97 Widen to 3 lanes with bike lanes Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2024 5 5 5 NE 242nd Avenue NE 28th St. to NE 9th St. 00 36 from: to: 15 P 0.70 Widen to 3 lanes with bike lane Totals 0 0 0 5 5 0 0 0 5 Report Date: 6/12/2018 Page 6 of 10 Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC FROM: 2019 TO: 2024 Hearing Date: 6/4/2018 Adoption Date: 6/18/2018 Amend Date: Resolution No: 18-005 Report Date: 6/12/2018 Page 7 of 10 Project Identification Project Costs in Thousands of Dollars Federally Funded jA. Pin/Project No. B. STIP ID E o Expenditure Schedule (Local Agency) Projects Only Fund Source Information a z C. Project Title y > m a T w Phase Start S 't :, 'c D. Road Name or Number , > a F- `n :? - „ (yyyy) Federal Fund State Fund Federal Funds State Funds Local Funds Total Funds Envir. R/W .� E. Begin & End Termini E F°- .o Code Code 1st 2nd 3rd 4th thin 6th Type Required w a F. Project Description G. Structure ID a. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 6/1/2024 5 5 5 NE Ingle Road Extension Goodwin to 232nd Ave 00 37 from: to: 15 P 1.00 New construction Totals 0 0 0 5 5 0 0 0 5 ALL 6/1/2024 280 280 280 NW Maryland Street C NW 19th to NW 24th S 19 38 from: to: 01 P 0.25 W NO New construction G P T Totals 0 0 0 280 280 0 0 0 280 ALL 6/1/2024 270 270 270 NE Nevada Street NE 3rd to NE 6th 19 39 from: to: 04 P 0.17 NO Reconstruct Totals 0 0 0 270 270 0 0 0 ALL 1/1/2022 340 340 340 NW Lake Road @ NW Sierra St. 16 40 from: to: 24 P 00 NO Traffic signal Totals 0 0 0 340 340 0 0 0 ALL 1/1/2024 340 340 340 NE Goodwin Road @ NW Camas Meadows Drive 00 41 from: to: 24 P 00 NO Traffic signal Totals 0 0 0 340 340 0 0 0 340 PE 1/1/2024 5 5 5 NW Pacific Rim @ Parker Street 16 42 from: to: 15 P 00 Traffic signal Totals 0 0 0 5 5 0 0 0 5 Report Date: 6/12/2018 Page 7 of 10 Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC FROM: 2019 TO: 2024 Hearing Date: 6/4/2018 Adoption Date: 6/18/2018 Amend Date: Resolution No: 18-005 Report Date: 6/12/2018 Page 8 of 10 Project Identification Project Costs in Thousands of Dollars Federally Funded jA. Pin/Project No. B. STIP ID E o Expenditure Schedule (Local Agency) Projects Only Fund Source Information a z C. Project Title y > m a T w Phase Start S 't :, 'c D. Road Name or Number , > a F- `n :? - „ (yyyy) Federal Fund State Fund Federal Funds State Funds Local Funds Total Funds Envir. R/W .� E. Begin & End Termini E F°- .o Code Code 1st 2nd 3rd 4th thin 6th Type Required w a F. Project Description G. Structure ID a. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2024 5 5 5 SR -500 @ Leadhetter Road 16 43 from: to: 15 P 00 Access Control Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2024 5 5 5 SR -500 @ New E/W Arterial 16 44 from: to: 15 P 00 Intersection improvements Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2024 5 5 5 NE 28th Street @ 242nd Avenue 16 45 from: to: 15 P 00 Intersection improvements Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2024 5 5 5 SR -500 @ NE 14th Ave. 16 46 from. to: 24 P 00 Controlled Access Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2024 5 5 5 NE 232nd Avenue @ Ingle Extension 00 47 from: to: 15 P 00 Roundabout Totals 0 0 0 5 5 0 0 0 5 CN 6/1/2019 4200 4200 700 700 700 2100 Pavement Treatments (maintenance &preservation) P 00 48 from: to: 47 P 00 NO Overlays, surface treatments Totals 0 0 0 4200 4200 700 700 700 2100 Report Date: 6/12/2018 Page 8 of 10 Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC FROM: 2019 TO: 2024 Hearing Date: 6/4/2018 Adoption Date: 6/18/2018 Amend Date: Resolution No: 18-005 Report Date: 6/12/2018 Page 9 of 10 Project Identification Project Costs in Thousands of Dollars Federally Funded jA. Pin/Project No. B. STIP ID E o Expenditure Schedule (Local Agency) Projects Only Fund Source Information a z C. Project Title N m ,may > a T w Phase Start S '� :, 'c D. Road Name or Number m `n Federal Fund State Fund Envir. R/W .� E. Begin & End Termini a H E F°- „ .o (yyyy) Code Federal Funds State Funds Code Local Funds Total Funds 1st 2nd 3rd 4th thin 6th Type Required w a F. Project Description G. Structure ID a. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ALL 1/1/2019 CDBG 250 1250 1500 250 250 250 750 Reconstructs G W 00 49 from: Citywide to: 04 P 00 NO Totals 0 250 0 1250 1500 250 250 250 750 ALL 1/1/2019 150 150 25 25 25 75 Sidewalk Projects 00 50 from: to: 28 P 00 NO Sidewalk installations Citywide Totals 0 0 0 150 150 25 25 25 75 ALL 1/1/2019 150 150 25 25 25 75 Curb Ramp Projects 00 51 from: to: 28 P 00 NO Future curb ramp installations Totals 0 0 0 150 150 25 25 25 75 ALL 1/1/2021 200 200 50 150 Shared Path Improvements Citywide 00 52 from: to: 28 P 00 NO Totals 0 0 0 200 200 0 0 50 150 ALL 1/1/2019 300 300 50 50 50 150 Safety Projects 00 53 from: to: 21 P 00 NO Future safety projects Includes traffic revisions, NW Fargo Curve Safety Analysis Totals 0 0 0 300 300 50 50 50 150 CN 1/1/2019 20 20 20 Storm Grate Replacements (Bike Improvements) 00 54 from. to. 38 P 00 NO Storm grate replacements for bike lane improvements Totals 0 0 0 20 20 20 0 0 0 Report Date: 6/12/2018 Page 9 of 10 9. Appendices A. Six Year Form Instructions Heading Agency Enter name of the sponsoring agency. County No. Enter the assigned number (see LAG Appendix 21.44). City No. Enter the assigned number (see LAG Appendix 21.45). MPO/RTPO Enter the name of the associated MPO (if located within urbanized area) or - Major Collector RTPO (if located in a rural area). Hearing Date Enter the date of the public hearing. Adoption Date Enter the date this program was adopted by council or commission. Resolution No. Enter Legislative Authority resolution number (if applicable.) Amendment Date Enter the date this program was amended by council or commission. Column Number 1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be one approved by FHWA.) Description 00- No Classification Rural (< 5000 pop.) 01 - Interstate 02 - Principal Arterials 06 - Minor Arterials 07 - Major Collector 08 - Minor Collector 09 - Local Access Urban (> 5000 pop.) 11 - Interstate 12 - Freeways & Expressways 14 - Other Principal Arterials 16 - Minor Arterial 17 - Collector 19 - Local Access 1. Priority Numbers. Enter local agency number identifying agency project priority (optional). 2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route Number; (e) Beginning and Ending Termini (milepost or street names); and (f) Describe the Work to be Completed. 4. Improvement Type Codes. Enter the appropriate federal code number. SEE APPENDIX A 5. Funding Status. Enter the funding status for the entire project or phase that describes the current status. S - Project is `selected' by the appropriate selection body and funding has been secured by the lead agency. P - Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that need to be relocated or are impacted by the construction project. C - Cable TV G - Gas O - Other P - Power S - Sewer (other than agency -owned) T - Telephone W — Water 8. Project Phase. Select the appropriate phase code of the project. PE - Preliminary Engineering, including Design (or Planning) RW - Right of Way or land acquisition CN - Construction only (or transit planning or equipment purchase) ALL - All Phases: from Preliminary Engineering through Construction 9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. SEE APPENDIX C 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. SEE APPENDIX C 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto -calculation in the "STIP Too" program.) 16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (For Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this project. (This is "required" for Federally funded projects, but may be filled in for state or locally funded projects.) EIS - Environmental Impact Statement EA - Environmental Assessment CE - Categorical Exclusion 21. RNV Certification. Click Y if Right of Way acquisition is or will be required. If yes, enter R/W Certification Date, if known. (This is "required" for Federally funded projects APPENDIX A IMPROVEMENT TYPE CODES 01 New Construction Roadway 03 Reconstruction, Added Capacity 04 Reconstruction, No Added Capacity 05 4R Maintenance Resurfacing 06 4R Maintenance - Restoration & Rehabilitation 07 4R Maintenance - Relocation 08 Bridge, New Construction 10 Bridge Replacement, Added Capacity 11 Bridge Replacement, No Added Capacity 13 Bridge Rehabilitation, Added Capacity 14 Bridge Rehabilitation, No Added Capacity 15 Preliminary Engineering 16 Right of Way 17 Construction Engineering 18 Planning 19 Research 20 Environmental Only 21 Safety 22 Rail/Highway Crossing 23 Transit 24 Traffic Management/Engineering - HOV 25 Vehicle Weight Enforcement Program 26 Ferry Boats 27 Administration 28 Facilities for Pedestrians and Bicycles 29 Acquisition of Scenic Easements and Scenic or Historic Sites 30 Scenic or Historic Highway Programs 31 Landscaping and Other Scenic Beautification 32 Historic Preservation 33 Rehab & Operation of Historic Transp. Buildings, Structures, Facilities 34 Preservation of Abandoned Railway Corridors 35 Control and Removal of Outdoor Advertising 36 Archaeological Planning & Research 37 Mitigation of Water Pollution due to Highway Runoff 38 Safety and Education for Pedestrians/Bicyclists 39 Establishment of Transportation Museums 40 Special Bridge 41 Youth Conservation Service 42 Training 43 Utilities 44 Other 45 Debt Service 47 Systematic Preventive Maintenance 5307 5309(Bus) 5309(FG) 5309(NS) 5310 5311 5316 5317 FTA Discretionary BIA BR CBI CDBG CMAQ DEMO Discretionary- FBD Discretionary- IMD Discretionary- ITS Discretionary- PLH Discretionary- SB Discretionary- STP APPENDIX C FEDERAL FUND CODES FTA Urbanized Area Formula Program FTA Bus and Bus Facilities FTA Fixed Guideway Modernization FTA New Starts FTA Elderly Persons and Persons with Disabilities FTA Rural Area Formula Grants FTA Job Access & Reverse Commute Program (JARC) FTA New Freedom Program Discretionary Programs such as Alternatives Analysis (5339) and TIGGER Program Bureau of Indian Affairs Bridge Replacement/Rehabilitation Program Coordinated Border Infrastructure Community Development Block Grant (Dept. of Commerce) Congestion Mitigation and Air Quality Demonstration Projects (High Priority, Sect. 112, 115, 117, 125 and 129) Ferry Boat Discretionary Interstate Maintenance Discretionary Intelligent Transportation Systems Public Lands Highways (Federal Lands) Scenic Byways Surface Transportation Priorities Discretionary- TCSP Transportation, Community & System Preservation Program DOD Department of Defense FMSIB Freight Mobility Strategic Investment Board IM Interstate Maintenance IRR Indian Reservation Roads NHS National Highway System SRTS Safe Routes to Schools STP Surface Transportation Program (WSDOT Use Only) STP(E) Surface Trans. Program - Enhancements STP(L) Surface Trans. Program - Legislative Earmarks STP(S) Surface Trans. Program- Safety (Includes Highway) Safety Improvement Program, Hazard Elimination, Railway/Highway Crossing Program and 2010- 15 County Road Safety Program) STP(R) Surface Trans. Program - Rural Regionally Selected STP(U) Surface Trans. Program - Urban Regionally Selected STATE FUND CODES CRAB County Road Administration Board FMSIB Freight Mobility Strategic Investment Board PWTF Public Works Trust Fund SRTS Safe Routes to Schools TIB Transportation Improvement Board TPP Transportation Partnerships Program WSDOT WSDOT funds OTHER Any other state funds not listed