Loading...
RES 15-003RESOLUTION NO.15-003 A RESOLUTION revising and extending the Comprehensive Street Program for an additional six (6)years. WHEREAS,pursuant to the requirements of RCW 35.77.010,the City of Camas did,by Resolution No.1298 adopt a Comprehensive Street Program (also known as a “Six-Year Transportation Improvement Program”)for the ensuing six (6)years,and WHEREAS,said law requires the City revise and extend said Comprehensive Street Program annually,and WHEREAS,pursuant to said law,the City Council of the City of Camas being the legislative body of said City did hold a public hearing on said revised Comprehensive Plan at 7:00 p.m.at the Camas Municipal Center in Camas,Washington,on the 1st day of June 2015 and the City Council received and considered public testimony relative to the Comprehensive Street Program,as proposed. NOW,THEREFORE,BE IT RESOLVED by the Council of the City of Camas that the Comprehensive Street Program heretofore adopted and revised by the City Engineer for the City of Camas,as submitted to the City Council for the City of Camas,be and the same is hereby adopted and extended for an additional six (6)year period from the date thereof. BE IT FURTHER RESOLVED,that the City Clerk file a copy of said revised Comprehensive Street Program for the ensuing six (6)years,together with a copy of this resolution,with the Secretary of Transportation of the State of Washington. PASSED by the Council and APPROVED by tha Mayor this 15th day of June 2015. n XSIGNED: Mayor Resolution No.15-003 Page 2 ATTEST: Clerk APPROVED as to form: City Attorney Report Date: 6/8/2015 Page 1 of 10 FROM:2016 TO:2021 Hearing Date:6/1/2014 Adoption Date:6/15/2014 Amend Date:Resolution No: 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 CN 3/1/2016 1850 1850 1850 NW 6th Avenue NW Norwood St. to NE Adams from:to: Includes Norwood Intersection Roundabout Totals 0 0 0 1850 1850 1850 0 0 0 RW 1/1/2016 800 800 800 NW Brady Road P CN 3/1/2021 OTHER 6000 6000 6000 NW 16th to NW 25th C from:to:G Widening, bike lanes T Totals 0 0 6000 800 6800 800 0 0 6000 PE 7/1/2017 OTHER 400 100 500 400 100 NW Camas Meadows Drive RW 7/1/2018 160 160 160 NW Payne St. to NW 60th Ave.CN 6/1/2019 OTHER 2200 600 2800 2800 from:to: New construction Totals 0 0 2600 860 3460 0 400 260 2800 PE 7/1/2017 OTHER 120 40 160 120 40 NW Larkspur Street W RW 7/1/2018 100 100 100 NW Lake Rd. to NW 60th S CN 6/1/2019 OTHER 170 640 810 810 from:to:P Widening, sidewalk T C G Totals 0 0 290 780 1070 0 120 140 810 ALL 1/1/2019 STP(U)1800 1710 3510 3510 NW 38th Avenue P NW Parker to Grass Valley Park C from:to:G Widening, bike lanes T Totals 0 1800 0 1710 3510 0 0 0 3510 ALL 1/1/2018 WSDOT 25000 25000 25000 SR-14 West Camas Slough Bridge from:to: Widen to 4 lanes NOTE: PE phase began 1/2006 Totals 0 0 25000 0 25000 0 0 0 25000 CE CE CE CE Federally Funded Projects Only Envir. Type R/W Required Project Identification A. Pin/Project No. B. STIP ID NO YES YES YES YES NO State Funds Local Funds Total Funds 1st F. Project Description D. Road Name or Number E. Begin & End Termini G. Structure ID Expenditure Schedule (Local Agency) 4th thru 6th Federal Fund Code Federal Funds 2nd 3rd Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy) Agency: City of Camas Functional ClassPriority NumberS 0.00Improvement Type(s)StatusTotal LengthUtility Codes3 14 1 24 Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC C. Project Title 00 4 P 0.13 16 5 P 0.45 16 2 P 0.63 00 3 P 0.41 03 15 03 03 12 6 P 2.2503 Washington State Department of Transportation Six Year Transportation Improvement Program Report Date: 6/8/2015 Page 2 of 10 FROM:2016 TO:2021 Hearing Date:6/1/2014 Adoption Date:6/15/2014 Amend Date:Resolution No: 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Federally Funded Projects Only Envir. Type R/W Required Project Identification A. Pin/Project No. B. STIP ID State Funds Local Funds Total Funds 1st F. Project Description D. Road Name or Number E. Begin & End Termini G. Structure ID Expenditure Schedule (Local Agency) 4th thru 6th Federal Fund Code Federal Funds 2nd 3rd Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy) Agency: City of Camas Functional ClassPriority NumberImprovement Type(s)StatusTotal LengthUtility Codes3 Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC C. Project Title ALL 1/1/2016 180 180 30 30 30 90 ADA Compliance from: Citywide to: (Ongoing) Totals 0 0 0 180 180 30 30 30 90 ALL 1/1/2017 520 520 520 NW 23rd Avenue Nw Astor to NW Sierra from:to: Widening, sidewalk Totals 0 0 0 520 520 0 520 0 0 ALL 1/1/2019 300 300 300 NW Pacific Rim Boulevard @ SE Payne Rd. from:to: Traffic signal Totals 0 0 0 300 300 0 0 0 300 ALL 1/1/2020 STP(U)6880 OTHER 7200 6000 20080 20080 NE Goodwin Road/28th Street NW Camas Meadows Dr. to NE 232nd Ave. from:to: Widen to 5 lanes with bike lanes west of Ingle Widen to 3 lanes with bike lanes east of Ingle Totals 0 6880 7200 6000 20080 0 0 0 20080 ALL 1/1/2017 1450 1450 1450 Bybee Road Realignment C SE 15th St. to SE 20th St.S from:to:W New construction G P T Totals 0 0 0 1450 1450 0 0 0 1450 CN 1/1/2017 60 60 60 NW Leadbetter Drive P NW Lake Rd. to NW Fremont St.C from:to:T Sidewalk G Notes: W S Totals 0 0 0 60 60 0 0 0 60 0.23 YES 16 9 P 00 17 10 P 1.72 24 15 00 8 04 P CE NO NO YES YES NO 14 7 P 0028 17 11 P 0.05 17 12 P 0.15 01 28 Report Date: 6/8/2015 Page 3 of 10 FROM:2016 TO:2021 Hearing Date:6/1/2014 Adoption Date:6/15/2014 Amend Date:Resolution No: 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Federally Funded Projects Only Envir. Type R/W Required Project Identification A. Pin/Project No. B. STIP ID State Funds Local Funds Total Funds 1st F. Project Description D. Road Name or Number E. Begin & End Termini G. Structure ID Expenditure Schedule (Local Agency) 4th thru 6th Federal Fund Code Federal Funds 2nd 3rd Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy) Agency: City of Camas Functional ClassPriority NumberImprovement Type(s)StatusTotal LengthUtility Codes3 Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC C. Project Title ALL 6/1/2020 3220 3220 3220 Lake Road NW Lacamas Lane to NE Everett from:to: Widening, sidewalk Totals 0 0 0 3220 3220 0 0 0 3220 PE 6/1/2020 415 415 415 New NUGA E/W Arterial NE 14th St. to Everett Rd. from:to: New construction Includes Critical Areas and Alignment Investigation Totals 0 0 0 415 415 0 0 0 415 PE 6/1/2020 210 210 210 NE 9th Street NE 232nd Ave. to NE 242nd Ave. from:to: New construction Includes Critical Areas and Alignment Investigation Totals 0 0 0 210 210 0 0 0 210 PE 6/1/2021 5 5 5 SR-500 (Everett St./Rd.) NW Lake Rd. to SE 4th St. from:to: Widen to 3 lanes with bike lane Totals 0 0 0 5 5 0 0 0 5 ALL 6/1/2021 270 270 270 NW Maryland Street C NW 19th to NW 24th S from:to:W New construction G P T Totals 0 0 0 270 270 0 0 0 270 PE 1/1/2018 115 115 115 NW Astor Street/NW 11th Avenue P RW 1/1/2019 115 115 115 NW 16th Ave. to McIntosh Rd.C CN 6/1/2020 1820 1820 1820 from:to:G Widening, bike lanes T Includes path on Forest Home Road from Forest Home Lane to Astor Street Totals 0 0 0 2050 2050 0 0 115 1935 16 16 15 P 1.08 YES YES1613P0.4503 19 17 01 P 17 18 03 P 0.62 0.25 00 14 15 P 2.00 NO 00 15 15 P 0.50 Report Date: 6/8/2015 Page 4 of 10 FROM:2016 TO:2021 Hearing Date:6/1/2014 Adoption Date:6/15/2014 Amend Date:Resolution No: 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Federally Funded Projects Only Envir. Type R/W Required Project Identification A. Pin/Project No. B. STIP ID State Funds Local Funds Total Funds 1st F. Project Description D. Road Name or Number E. Begin & End Termini G. Structure ID Expenditure Schedule (Local Agency) 4th thru 6th Federal Fund Code Federal Funds 2nd 3rd Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy) Agency: City of Camas Functional ClassPriority NumberImprovement Type(s)StatusTotal LengthUtility Codes3 Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC C. Project Title RW 1/1/2021 230 230 230 NW 18th Avenue, et al S CN 6/1/2021 2015 2015 2015 NW Astor to NW 16th, include NW Hood W from:to:P Widen curb, sidewalk T C Totals 0 0 0 2245 2245 0 0 0 2245 PE 1/1/2021 5 5 5 NW 18th Avenue P NW Whitman St. to NW Brady Rd.G from:to:T New construction with bike lanes C W S Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2021 5 5 5 NW 18th Avenue W NW Whitman St. to West City Limits S from:to:P Widening, bike lanes T C G Totals 0 0 0 5 5 0 0 0 5 ALL 1/1/2021 2110 2110 2110 NE 43rd Avenue C S from: SR-500 to: East City Limits G Widen to 3 lanes with bike lanes P T Totals 0 0 0 2110 2110 0 0 0 2110 PE 1/1/2021 5 5 5 NW 43rd/NW Astor - NW Sierra to NW 38th S P from:to:C Widening, bike lanes G T Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2021 5 5 5 North Dwyer Creek Master Plan Street "B"C NW Friberg St./Strunk to NW Larkspur St.S from:to:W New construction G P T Totals 0 0 0 5 5 0 0 0 5 16 19 03 P 0.51 YES YES 16 20 P 0.2601 00 23 03 P .50 17 22 P 0.36 16 21 P 0.4003 03 00 24 15 P 0.90 Report Date: 6/8/2015 Page 5 of 10 FROM:2016 TO:2021 Hearing Date:6/1/2014 Adoption Date:6/15/2014 Amend Date:Resolution No: 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Federally Funded Projects Only Envir. Type R/W Required Project Identification A. Pin/Project No. B. STIP ID State Funds Local Funds Total Funds 1st F. Project Description D. Road Name or Number E. Begin & End Termini G. Structure ID Expenditure Schedule (Local Agency) 4th thru 6th Federal Fund Code Federal Funds 2nd 3rd Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy) Agency: City of Camas Functional ClassPriority NumberImprovement Type(s)StatusTotal LengthUtility Codes3 Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC C. Project Title PE 1/1/2021 5 5 5 NW Payne Street C NW Lake Rd. to NW Camas Meadows Dr.G from:to:P Widening T Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2021 5 5 5 North Dwyer Creek Master Plan Street "A"C NW Lake Rd. to NW Camas Meadows Dr.S from:to:W New construction G P T Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2021 5 5 5 NW McIntosh Road P NW Brady Rd. to NW 11th Ave.G from:to:C Widening, bike lanes T Totals 0 0 0 5 5 0 0 0 5 ALL 1/1/2021 5870 5870 5870 NE Woodburn Drive C SE 283rd Ave. to SE 15th St.S from:to:W New construction G Includes 23rd St. realignment P T Totals 0 0 0 5870 5870 0 0 0 5870 PE 1/1/2021 5 5 5 SE 15th Street/Nourse Road C S from: Camas High School to: NE 283rd Ave.W Widen to 3 lanes with bike lanes G P T Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2021 5 5 5 NE 18th Street NE 192nd Ave. to NE Goodwin Rd. from:to: New construction (potential alternate alignment) Totals 0 0 0 5 5 0 0 0 5 00 25 03 P 0.40 00 26 15 P 0.64 00 27 15 P 1.2 00 28 01 P .70 YES 07 29 15 P 0.59 00 30 15 P 0.67 Report Date: 6/8/2015 Page 6 of 10 FROM:2016 TO:2021 Hearing Date:6/1/2014 Adoption Date:6/15/2014 Amend Date:Resolution No: 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Federally Funded Projects Only Envir. Type R/W Required Project Identification A. Pin/Project No. B. STIP ID State Funds Local Funds Total Funds 1st F. Project Description D. Road Name or Number E. Begin & End Termini G. Structure ID Expenditure Schedule (Local Agency) 4th thru 6th Federal Fund Code Federal Funds 2nd 3rd Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy) Agency: City of Camas Functional ClassPriority NumberImprovement Type(s)StatusTotal LengthUtility Codes3 Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC C. Project Title PE 1/1/2021 5 5 5 NE 28th Street NE 232nd Ave. to NE 242nd Ave. from:to: Widen to 3 lanes with bike lanes Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2021 5 5 5 NW Camas Meadows Drive NE 13th St. to NE 18th St. from:to: New construction (potential alternate alignment) Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2021 5 5 5 NE 232nd Avenue NE 28th to NE 9th St. from:to: Widen to 3 lanes with bike lanes Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2021 5 5 5 NE 242nd Avenue NE 28th St. to NE 14th St. from:to: Widen to 3 lanes with bike lane Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2021 5 5 5 NE Ingle Road Extension Goodwin to 232nd Ave from:to: New construction Totals 0 0 0 5 5 0 0 0 5 17 31 15 P 0.50 00 32 15 P 0.20 17 33 15 P 0.97 00 34 15 P 0.70 00 35 15 P 1.00 Report Date: 6/8/2015 Page 7 of 10 FROM:2016 TO:2021 Hearing Date:6/1/2014 Adoption Date:6/15/2014 Amend Date:Resolution No: 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Federally Funded Projects Only Envir. Type R/W Required Project Identification A. Pin/Project No. B. STIP ID State Funds Local Funds Total Funds 1st F. Project Description D. Road Name or Number E. Begin & End Termini G. Structure ID Expenditure Schedule (Local Agency) 4th thru 6th Federal Fund Code Federal Funds 2nd 3rd Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy) Agency: City of Camas Functional ClassPriority NumberImprovement Type(s)StatusTotal LengthUtility Codes3 Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC C. Project Title ALL 1/1/2021 300 300 300 NW Brady Road @ NW 16th Ave. from:to: Traffic signal Totals 0 0 0 300 300 0 0 0 300 ALL 1/1/2021 300 300 300 NW Lake Road @ NW Sierra St. from:to: Traffic signal Totals 0 0 0 300 300 0 0 0 300 ALL 1/1/2021 300 300 300 NE Goodwin Road @ NW Camas Meadows Drive from:to: Traffic signal Totals 0 0 0 300 300 0 0 0 300 PE 1/1/2021 5 5 5 NW Pacific Rim @ Parker Street from:to: Traffic signal Totals 0 0 0 5 5 0 0 0 5 PE 1/1/2021 5 5 5 SR-500 @ Leadbetter Road from:to: Access Control Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2021 5 5 5 SR-500 @ New E/W Arterial from:to: Traffic signal Totals 0 0 0 5 5 0 0 0 5 14 36 24 P 00 NO 16 37 24 P 00 NO 00 38 24 P 00 NO 16 39 15 P 00 16 40 15 P 00 16 41 15 P 00 Report Date: 6/8/2015 Page 8 of 10 FROM:2016 TO:2021 Hearing Date:6/1/2014 Adoption Date:6/15/2014 Amend Date:Resolution No: 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Federally Funded Projects Only Envir. Type R/W Required Project Identification A. Pin/Project No. B. STIP ID State Funds Local Funds Total Funds 1st F. Project Description D. Road Name or Number E. Begin & End Termini G. Structure ID Expenditure Schedule (Local Agency) 4th thru 6th Federal Fund Code Federal Funds 2nd 3rd Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy) Agency: City of Camas Functional ClassPriority NumberImprovement Type(s)StatusTotal LengthUtility Codes3 Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC C. Project Title PE 6/1/2021 5 5 5 NE 28th Street @ 242nd Avenue from:to: Traffic signal Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2021 5 5 5 NE Goodwin Road @ NE Ingle Rd. from:to: Traffic signal Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2021 5 5 5 SR-500 @ NE Lake Rd. from:to: Roundabout Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2021 5 5 5 SR-500 @ NE 14th Ave. from:to: Controlled Access Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2021 5 5 5 NE 232nd Avenue @ 9th Street from:to: Roundabout Totals 0 0 0 5 5 0 0 0 5 PE 6/1/2021 5 5 5 NE 232nd Avenue @ Ingle Extension from:to: Roundabout Totals 0 0 0 5 5 0 0 0 5 00 46 15 P 00 00 47 15 P 00 16 44 15 P 00 16 45 24 P 00 17 43 15 P 00 16 42 15 P 00 Report Date: 6/8/2015 Page 9 of 10 FROM:2016 TO:2021 Hearing Date:6/1/2014 Adoption Date:6/15/2014 Amend Date:Resolution No: 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Federally Funded Projects Only Envir. Type R/W Required Project Identification A. Pin/Project No. B. STIP ID State Funds Local Funds Total Funds 1st F. Project Description D. Road Name or Number E. Begin & End Termini G. Structure ID Expenditure Schedule (Local Agency) 4th thru 6th Federal Fund Code Federal Funds 2nd 3rd Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy) Agency: City of Camas Functional ClassPriority NumberImprovement Type(s)StatusTotal LengthUtility Codes3 Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC C. Project Title CN 6/1/2016 4200 4200 700 700 700 2100 Pavement Treatments (maintenance & preservation)P from:to: Overlays, surface treatments Totals 0 0 0 4200 4200 700 700 700 2100 ALL 1/1/2016 CDBG 250 1250 1500 250 250 250 750 Reconstructs G W from: Citywide to: Totals 0 250 0 1250 1500 250 250 250 750 CN 1/1/2017 CDBG 450 50 500 100 100 300 Sidewalk Projects from:to: Sidewalk installations Citywide Totals 0 450 0 50 500 0 100 100 300 CN 1/1/2016 90 90 15 15 15 45 Curb Ramp Projects from:to: Future curb ramp installations Totals 0 0 0 90 90 15 15 15 45 ALL 1/1/2018 200 200 50 150 Shared Path Improvements Citywide from:to: Totals 0 0 0 200 200 0 0 50 150 00 52 28 P 00 NO 00 50 28 P 00 NO 00 51 28 P 00 NO 00 48 47 P 00 NO 00 49 04 P 00 NO Report Date: 6/8/2015 Page 10 of 10 FROM:2016 TO:2021 Hearing Date:6/1/2014 Adoption Date:6/15/2014 Amend Date:Resolution No: 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Federally Funded Projects Only Envir. Type R/W Required Project Identification A. Pin/Project No. B. STIP ID State Funds Local Funds Total Funds 1st F. Project Description D. Road Name or Number E. Begin & End Termini G. Structure ID Expenditure Schedule (Local Agency) 4th thru 6th Federal Fund Code Federal Funds 2nd 3rd Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy) Agency: City of Camas Functional ClassPriority NumberImprovement Type(s)StatusTotal LengthUtility Codes3 Co. No.: 06 Co. Name: Clark Co. City No.: 0145 MPO/RTPO: RTC C. Project Title ALL 1/1/2017 250 250 50 50 150 Safety Projects from:to: Future safety projects Includes traffic revisions, NW Fargo Curve Safety Analysis Totals 0 0 0 250 250 0 50 50 150 CN 1/1/2016 20 20 20 Storm Grate Replacements (Bike Improvements) from:to: Storm grate replacements for bike lane improvements Totals 0 0 0 20 20 20 0 0 0 CN 1/1/2016 30 30 5 5 5 15 Future Bike Route Improvements Citywide from:to: Future bike route improvements Totals 0 0 0 30 30 5 5 5 15 CN 1/1/2016 120 120 20 20 20 20 Street Lighting Citywide from:to: Street Lighting Totals 0 0 0 120 120 20 20 20 20 ALL 1/1/2021 BR 800 200 1000 1000 NE 3rd Avenue Washougal River Bridge from:to: Seismic rating, scour critical, and footing rehabilitation Totals 0 800 0 200 1000 0 0 0 1000 02 57 14 P 00 NO 00 55 28 P 00 NO 00 56 21 P 00 NO 00 53 21 P 00 NO 00 54 38 P 00 NO City of Camas2016 – 2021Six Year Street Priorities301031331543252624526117212018272322162829143419328150429-343 Six Year Street Plan Map 2016-2021 FINAL13135912111 NW 6th Ave & Norwood Roundabout2 NW Brady Rd3 NW Camas Meadows Dr (East)4 NW Larkspur St5 NW 38th Ave (Ph 3)6 SR 14 - West Camas Slough Bridge7 ADA Compliance Citywide8 NW 23rd Ave9 Pacific Rim Blvd & Payne Rd Signal10 NE Goodwin Rd/28th St11 Bybee Rd12 NW Leadbetter Dr Phase 213 NW Lake Rd.14 New East/West Arterial15 NE 9th St16 SR 500 (Everett St/Rd)17 NW Maryland St18 NW Astor St.19 NW 16th Ave/Hood/18th Ave20 NW 18th Ave21 NW 18th Ave/Payne Rd22 NE 43rd Ave23 NW Astor St. /43rd Ave24 Street "B" (North Dwyer Creek Area)25 NW Payne St.26 Street "A" (North Dwyer Creek Area)27 NW McIntosh Rd28 NW Woodburn Dr.29 SE 15th St./Norse Rd30 NE 18th St31 NE 28th St32 NW Camas Meadows Dr (West)33 NE 232nd Ave34 NE 242nd Ave35 NW Ingle Rd Extension7 9. Appendices A. Six Year Form Instructions Heading Agency Enter name of the sponsoring agency. County No. Enter the assigned number (see LAG Appendix 21.44). City No. Enter the assigned number (see LAG Appendix 21.45). MPO/RTPO Enter the name of the associated MPO (if located within urbanized area) or RTPO (if located in a rural area). Hearing Date Enter the date of the public hearing. Adoption Date Enter the date this program was adopted by council or commission. Resolution No. Enter Legislative Authority resolution number (if applicable.) Amendment Date Enter the date this program was amended by council or commission. Column Number 1. Functional Classification. Enter the appropriate 2-digit code denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be one approved by FHWA.) Description 00- No Classification Rural (< 5000 pop.) Urban (> 5000 pop.) 01 - Interstate 11 - Interstate 02 - Principal Arterials 12 - Freeways & Expressways 06 - Minor Arterials 14 - Other Principal Arterials 07 - Major Collector 16 - Minor Arterial 08 - Minor Collector 17 - Collector 09 - Local Access 19 - Local Access 1. Priority Numbers. Enter local agency number identifying agency project priority (optional). 2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route Number; (e) Beginning and Ending Termini (milepost or street names); and (f) Describe the Work to be Completed. 4. Improvement Type Codes. Enter the appropriate federal code number. SEE APPENDIX A 5. Funding Status. Enter the funding status for the entire project or phase that describes the current status. S - Project is ‘selected’ by the appropriate selection body and funding has been secured by the lead agency. P - Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code “00” if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that need to be relocated or are impacted by the construction project. C - Cable TV G - Gas O - Other P - Power S - Sewer (other than agency-owned) T - Telephone W – Water 8. Project Phase. Select the appropriate phase code of the project. PE - Preliminary Engineering, including Design (or Planning) RW - Right of Way or land acquisition CN - Construction only (or transit planning or equipment purchase) ALL - All Phases: from Preliminary Engineering through Construction 9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. SEE APPENDIX C 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. SEE APPENDIX C 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto-calculation in the “STIP Too” program.) 16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (For Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this project. (This is “required” for Federally funded projects, but may be filled in for state or locally funded projects.) EIS - Environmental Impact Statement EA - Environmental Assessment CE - Categorical Exclusion 21. R/W Certification. Click Y if Right of Way acquisition is or will be required. If yes, enter R/W Certification Date, if known. (This is “required” for Federally funded projects APPENDIX A IMPROVEMENT TYPE CODES 01 New Construction Roadway 03 Reconstruction, Added Capacity 04 Reconstruction, No Added Capacity 05 4R Maintenance Resurfacing 06 4R Maintenance - Restoration & Rehabilitation 07 4R Maintenance - Relocation 08 Bridge, New Construction 10 Bridge Replacement, Added Capacity 11 Bridge Replacement, No Added Capacity 13 Bridge Rehabilitation, Added Capacity 14 Bridge Rehabilitation, No Added Capacity 15 Preliminary Engineering 16 Right of Way 17 Construction Engineering 18 Planning 19 Research 20 Environmental Only 21 Safety 22 Rail/Highway Crossing 23 Transit 24 Traffic Management/Engineering - HOV 25 Vehicle Weight Enforcement Program 26 Ferry Boats 27 Administration 28 Facilities for Pedestrians and Bicycles 29 Acquisition of Scenic Easements and Scenic or Historic Sites 30 Scenic or Historic Highway Programs 31 Landscaping and Other Scenic Beautification 32 Historic Preservation 33 Rehab & Operation of Historic Transp. Buildings, Structures, Facilities 34 Preservation of Abandoned Railway Corridors 35 Control and Removal of Outdoor Advertising 36 Archaeological Planning & Research 37 Mitigation of Water Pollution due to Highway Runoff 38 Safety and Education for Pedestrians/Bicyclists 39 Establishment of Transportation Museums 40 Special Bridge 41 Youth Conservation Service 42 Training 43 Utilities 44 Other 45 Debt Service 47 Systematic Preventive Maintenance APPENDIX C FEDERAL FUND CODES 5307 FTA Urbanized Area Formula Program 5309(Bus) FTA Bus and Bus Facilities 5309(FG) FTA Fixed Guideway Modernization 5309(NS) FTA New Starts 5310 FTA Elderly Persons and Persons with Disabilities 5311 FTA Rural Area Formula Grants 5316 FTA Job Access & Reverse Commute Program (JARC) 5317 FTA New Freedom Program FTA Discretionary Discretionary Programs such as Alternatives Analysis (5339) and TIGGER Program BIA Bureau of Indian Affairs BR Bridge Replacement/Rehabilitation Program CBI Coordinated Border Infrastructure CDBG Community Development Block Grant (Dept. of Commerce) CMAQ Congestion Mitigation and Air Quality DEMO Demonstration Projects (High Priority, Sect. 112, 115, 117, 125 and 129) Discretionary- FBD Ferry Boat Discretionary Discretionary- IMD Interstate Maintenance Discretionary Discretionary- ITS Intelligent Transportation Systems Discretionary- PLH Public Lands Highways (Federal Lands) Discretionary- SB Scenic Byways Discretionary- STP Surface Transportation Priorities Discretionary- TCSP Transportation, Community & System Preservation Program DOD Department of Defense FMSIB Freight Mobility Strategic Investment Board IM Interstate Maintenance IRR Indian Reservation Roads NHS National Highway System SRTS Safe Routes to Schools STP Surface Transportation Program (WSDOT Use Only) STP(E) Surface Trans. Program - Enhancements STP(L) Surface Trans. Program - Legislative Earmarks STP(S) Surface Trans. Program- Safety (Includes Highway) Safety Improvement Program, Hazard Elimination, Railway/Highway Crossing Program and 2010- 15 County Road Safety Program) STP(R) Surface Trans. Program - Rural Regionally Selected STP(U) Surface Trans. Program - Urban Regionally Selected STATE FUND CODES CRAB County Road Administration Board FMSIB Freight Mobility Strategic Investment Board PWTF Public Works Trust Fund SRTS Safe Routes to Schools TIB Transportation Improvement Board TPP Transportation Partnerships Program WSDOT WSDOT funds OTHER Any other state funds not listed