Loading...
RES 1272I£RRESOLUTIONNO. A RESOLUTION revising and extending the Comprehensive Street Program for an additional six (6)years. WHEREAS,pursuant to the requirements of RCW 35.77 .010,the City of Camas did ,by Resolution No.1242 adopt a Comprehensive Street Program for the ensuing six (6)years,and said law requires the City revise and extend saidWHEREAS, Comprehensive Street Program annually,and WHEREAS ,pursuant to said law,the City Council of the City of Camas being the legislative body of said City did hold a public hearing on said revised Comprehensive Plan at 7:00 p.m .at the Camas Municipal Center in Camas, Washington,on the 3 ld day of June 2013,and WHEREAS,there were no written or oral objections to the revised Comprehensive Plan as prepared by the City of Camas relative to the street program for the ensuing six (6)years within the City of Camas. NOW,THEREFORE,BE IT RESOLVED by the Council of the City of Camas heretofore adopted and revised by the City Engineer for the City of Camas,as submitted to the City Council for the City of Camas,be and the same is hereby adopted and extended for an additional six (6)year period from the date thereof. BE IT FURTHER RESOLVED,that the City Clerk file a copy of said revised Comprehensive Street Program for the ensuing six (6)years,together with a copy of this resolution,with the Secretary of Transportation of the State of Washington. PASSED by the Council and APPROVED (#y the Mayor this 17th day of June 2013.dSIGNED: Mayor ATTEST: Clerk VED as to form :APP City Attorney Six Year Transportation Improvement Program From 2014 to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co. MPO/RTPO:RTC Hearing Date: Amend Date:City No.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) toB.Bridge No.£Fund Source Information<u<0 <DQ)o>T3ow.2 wT5J2i° C/5Wc•C -Q o TO Federal Funding305OEo R/W-Cre'P =5 CL>.Required Date (MM/YY) 0-2 re Phase Start State Fund Code Federal Fund Code Federal Cost by Phase to 4tho Envir. Type Local Funds State Funds Total Funds oLL .2 Thruh-D 2nd 3rd1sto 6thCL 1 2 3 4 6 19 205789101315161718 21111214 CN 1/1/2014 1/1/2014 OTHER PWTF 2450 2450 245016103SC.83 CN 1000 10001000GNWFriberqSt.&Goodwin Rd. NW Lake Rd.to Camas Meadows Dr. from: Widening,bike lanes,signal upgrade PE obligated in 2012 R/W in 2013 YesP Tto: Totals 3450 34503450 CN 3/1/2014 STP(U)1100 Ti 0 34701720650 3470162W03S.55 SNW38thAve SE Armstrong St.to NW Parker from: Widening,bike lanes PE &R/W in 2013 YesP Tto:C G Totals 1720 650 3470 34701,100 1750CN3/1/2014 PWTF 1750 175014324P00NW6thAve. NW Norwood St.to NE Adams from: Norwood traffic signal and re-surfacing No to: Totals 1750 1750 1750 1/1/2015 6/1/2015 6/1/2016 270 270PE27016403PP.45 600 600RW600CNW38thAvenue NW Parker to Grass Valley Park from: Widening,bike lanes Yes2370CN23702370G Tto: Totals 870 237032403240 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 1 Six Year Transportation Improvement Program From _2014 ^ to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department of Transportation CamasAgency: Co.No.:06 City No.:0145 Co.Name:Clark Co. MPO/RTPO:RJC Hearing Date: Amend Date: Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) V)£B.Bridge No.Fund Source Information>?a3 £! 0)03 a)cn •o.2 t/3 o -2cO CO(0 c o 03 Federal Funding3QJ R/Wo2EszCLRequired Date (MM/YY) 3 Phase Start Federal Fund Code Federal Cost by Phase State Fund Code co 4th"o53 Envir. Type State Funds Local Funds Total Funds oLL CD ThruH=3 3rd1st2nd'oi—6thCL 1 2 3 214567171819208910111213141516 200001/1/2017ALL WSDOT 20000 2000012503P2.25SR-14 West Camas Slough Bridge No from: Widen to 4 lanes NOTE:PE phase began 1/2006 to: Totals 200002000020000 1/1/2015 1/1/2016 6/1/2017 175PE175175166PP03.53 225RW225225CNWBradyRd NW 16th to NW 25th from: Widening,bike lanes Yes1295CN12951295G Tto: Totals 225 129516951695175 5 151/1/2014 30 5 5PE30147P£6 00ADACompliance No from:Citywide to: Totals 155305530 1385ALL6/1/2015 1385 1385178C01P.05 SBybeeRoadRealignment SE 15th St.toSE 20th St. from: New construction Yesw Gto:P T Totals 138513851385 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 2 Six Year Transportation Improvement Program From 2014 to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department of Transportation CamasAgency: Co.No.:06 City No.:0145 Co.Name:Clark Co. MPO/RTPO:RTC Hearing Date: Amend Date: Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency )£wB.Bridge No.Fund Source Information>>o><uCO CDO)TJ O 05.2 w s ° tntnco Federal Funding3aj R/WooEJZ3CL&Required Date (MM/YY) 3 StatePhase Start Federal Fund Code Federal Cost by Phase CO 4tho Envir. TypeLocal Funds State Funds Total Funds ""PoLL .2 Fund ThruHZ>1st 2nd 3rdCode 6thCL 1 2 19 20161718 213456111213141578910 301/1/2016CN 30 30559 CE17PP.83 CNWLeadbetterDr.,Ph.2 NW Lake Rd.to NW Parker St. from: Widening with bike lanes,sidewalk NOTES:PE phase began 1/2007 NoT Gto:W S Totals 303030 500ALL1/1/2017 500 500001004P.23NW23rdAve. NW Astor to NW Sierra from: Widening,sidewalk Yes to: Totals 500500500 30003000ALL6/1/2018 30001611P03.45LakeRd NW Lacamas Ln to NE Everett from: Widening,sidewalk Yes to: Totals 300030003000 420ALL1/1/2017 4204200012w03P.13 SNWLarkspurSt. NW Lake Rd.to NW 60th from: Widening,sidewalk YesP Tto:C G Totals 420420420 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 3 Six Year Transportation Improvement Program From 2014 to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co.Hearing Date: Amend Date:MPO/RTPO:RTCCityNo.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) inB.Bridge No.£Fund Source Information>-a3•C -Q .2 E 0)03 CD03O.2 wt>iSs° inV)c o 03 Federal Funding3Cl)R/WosinCL3*Required Date (jMM/YY) 3 Phase Start Federal Fund Code Federal Cost by Phase State Fund Code 4thCO Envir. Type State Funds Local Funds Total Funds o 'L3LL CD Thrut-=3 2nd 3rd1sto’6tho. 1 2 3 6 18 20 2145789101213141617191115 6/1/2018 250ALL2502501913PC01.25 SNWMarylandStreet NW 19th to NW 24th from: New construction NoW Gto:P T Totals 250250250 1/1/2016 1/1/2017 6/1/2018 PE 105 10510514P17P03.62 105RW105105CNWAstorSt./NW 11th Ave. NW 16th Ave.to McIntosh Rd. from: Widening,bike lanes Includes path on Forest Home Road From Forest Home Lane to Astor Street Yes1690CN16901690G Tto: Totals 105 179519001900 2101/1/2019 6/1/2019 RW 210 210S1615P03.51 1870CN18701870WNW18thAve.,et al NW Astor to NW 16th,include NW Hood from: Widen curb,sidewalk YesP Tto:C To als 208020802080 1/1/2019 2080ALL2080208016P1601P.26 GNW18thAve. NW Whitman St.to NW Brady Rd. from: New construction with bike lanes YesT Cto:W S Totals 208020802080 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 4 Six Year Transportation Improvement Program From 2014 to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co. MPO/RTPO:RTC Hearing Date: Amend Date:City No.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) (AB.Bridge No.£Fund Source Information0>CO Q)a) C -Q U)TJ O «*.2 woJS W5V)c o CO Federal Funding0)R/W2EoszCL£Required Date (.MM/YY) 8 Phase Start Federal Fund Code Federal Cost by Phase State Fund Code w 4thT>Envir. Type State Funds Local Funds Total Funds LL o CP .0)Thru1st2nd3rdo6thQ_ 1 2 3 4 19 20 2156781011121416171891315 1600ALL1/1/2019 1600 16001617W03P.40 SNW18thAvenue NW Whitman St.to West City Limits from: Widening,bike lanes NoP Tto:C G Totals 160016001600 2800ALL1/1/2019 2800 28000018C01P.42 SNW38thAve.Extension (east ) NW Astor to NW Sierra from: New construction with bike lanes Yesw Gto:P T Totals 280028002800 ALL 1/1/2019 2030203020301719C03P.36 SNE43rdAve.YesG Pfrom:SR-500 Widen to 3 lanes with bike lanes to:East City Limits T Totals 203020302030 1875ALL1/1/2019 1875 18752000PS03.5 PNW43rd/NW Astor -NW Sierra to NW 38th YesC Gfrom: Widening,bike lanes to:T Totals 187518751875 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 5 Six Year Transportation Improvement Program From 2014 to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co. MPO/RTPO:RTC Hearing Date: Amend Date:City No.:0145 Project Identification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Project Costs in Thousands of Dollars Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) wB.Bridge No.£Fund Source Information>r cu•JZ X2 .2 E o <DCDT3nw.2 to o IS2O totoco(13 Federal Funding3o R/Wosz3CL>»Required Date (MM/YY) _ro Phase Start Federal Fund Code eo Federal Cost by Phase State Fund Code 4th=3 O Envir. Type State Funds Local Funds Total Funds u_o X).2 ThruZ)3rd1st2ndo 6thCL 1 2 3 4 5 6 7 19 20 2189101112131415161718 1/1/2019PE 5550021PCIS.90 SNorthDwyerCreekMasterPlanStreet"B” NW Friberg St./Strunk to NW Larkspur St. from: New construction Yesw Gto:P T Totals 5 55 ALL 1/1/2019 207020702070002203cP.40 GNWPayneSt. NW Lake Rd.to NW Camas Meadows Dr. from: Widening YesP Tto: Totals 207020702070 PE 1/1/2019 5550023PC.6415 SNorthDwyerCreekMasterPlanStreet"A” NW Lake Rd.to NW Camas Meadows Dr. from: New construction Yesw Gto:P T Totals 5 55 PE 1/1 /2019 5550024PP1.2I S GNWMcIntoshRd. NW Brady Rd.to NW 11th Ave. from: Widening,bike lanes YesC Tto: Totals 555 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 6 Six Year Transportation Improvement Program From 2014 to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department of Transportation CamasAgency: Co.No.:06 City No.:0145 Co.Name:Clark Co. MPO/RTPO:RTC Hearing Date: Amend Date: Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency )£mB.Bridge No.Fund Source InformationCL>•c -Q O E£2 <u <DU)T3 O W.2 wIS§° to(0 c o ro Federal Funding3QJ R/wonD-Required Date (MM/YY) 3 Phase Start Federal Fund Code Federal Cost by Phase State Fund Code c/>4th—Envir. Type Local Funds State Funds Total Funds o •X3UL .2 Thru33rd2nd1stS'6thCL 1 2 3 4 18 19 20 21568910131415177111216 1/1/2019 5650ALL565056500025CP01.70 SNEWoodburnDr SE 283rd Ave.to SE 15th St. from: New Construction Includes 23rd St.realignment Yesw Gto:P T Totals 565056505650 PE 1/1/2019 5550726PCIB.59SE15thSt./Nourse Rd.S Yes W Gfrom:Camas High School Widen to 3 lanes with bike lanes to:NE 283rd Ave. P T Totals 5 55 PE 6/1/2019 5550027pIB0.67NE18thSt. NE 192nd Ave to NE Goodwin Rd from: New construction to: Totals 555 5PE6/1/2019 5 52817PIS.46NEGoodwinRd/28th St. NW Camas Meadows Dr.to NE 232nd Ave. from: Widen to 5 lanes with bike lanes to: Totals 555 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 7 Six Year Transportation Improvement Program From 2014 to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department of Transportation CamasAgency: Co.No.:Q 6 City No.:0145 Co.Name:Clark Co. MPO/RTPO:RTC Hearing Date: Amend Date: Project Identification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Project Costs in Thousands of Dollars Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) B.Bridge No.in3 Fund Source Informationcoaj>»CD-c -Q .2 E 0)O)o .2 w o J25° in10coCO Federal Funding3a)R/WoJZ_jTO CL>.Required Date (MM/YY) 3 Phase Start Federal Fund Code Federal Cost by Phase State<n 4th"o Envir. Type State Funds Local Funds Total Funds 4=LL O .2 Fund Thruv-3 2nd 3rd1stoCode 6thCL 1 2 3 4 5 6 21891013141617181920111215 PE 6/1/2019 5 5 51729PIS0.50NE28thStreet NE 232nd Ave.to NE 242nd Ave. from: Widen to 5 ianes with bike lanes to: Totals 5 5 5 PE 6/1/2019 5550030PIS0.20NWCamasMeadowsDr. NE 13th St.to NE 18th St. from: New Construction to: Totals 555 PE 6/1/2019 5550031P/5 0.41NWCamasMeadowsDrive NW Payne St.to NW 60th Ave. from: New construction to: Totals 555 PE 6/1/2019 5551732Pis0.97NE232ndAve. NE 28th St.to NE 9th St. from: Widen to 3 lanes with bike lanes to: Totals 555 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 8 Six Year Transportation Improvement ProgramWashingtonStateDepartmentofTransportation From 2014 to 2019CamasAgency: Co.No.:06 Co.Name:Clark Co. MPO/RTPO:RTC Adoption Date:6/17/2013 Resolution No.:1272 6/3/2013HearingDate: Amend Date:City No.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) If)$B.Bridge No.Fund Source Information>>0 05OJ <DO)TJ O w.9 Wo*i° -1=inU)c o to Federal FundingaQJ R/W Required Date (MM/YY ) o.2 E£1 x:CL&Phase Start Federal Fund Code Federal Cost by Phase State Fund Code w 4tho Envir. Type State Funds Local Funds Total Funds*3OLL .9 Thruh-"D 3rd2nd1sto 6thCL 1 19 20 2123171845678101112131415169 6/1/2019 5PE550033PIS0.50NE9thSt. NE 232nd Ave.to NE 242nd Ave. from: New construction to: Totals 555 5PE6/1/2019 5 50034p/5 0.70NE242ndAve. NE 28th St.to NE 14th St. from: Widen to 3 lanes with bike lane to: Totals 555 5PE6/1/2019 550035Pi s 2.00NewNUGAEA/VArterial NE 14th St.to Nourse Rd. from: New construction to: Totals 555 5PE6/1/2019 551636P/5 1.08SR-500 (Everett St/Rd) NW Lake Rd.to SE 4th St. from: Widen to 3 lanes with bike lane to: Totals 555 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 9 Six Year Transportation Improvement Program From 2014 to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department off Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co. MPO/RTPO:RTC Hearing Date: Amend Date:City No.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) </)B.Bridge No.S Fund Source Informationa>0)>>a) .9 E O)-Onw.2 wt>J2co ininco Federal Funding30)R/WoszTOCLRequired Date (iMM/YY) ro Phase Start Federal Fund Code Federal Cost by Phase State Fund Code CO 4th-'D •w Envir. Type State Funds Local Funds Total Funds Li-.2 Thrui-2nd 3rd1stoi—6thQ_ 1 2 3 20456816171819 2179101112131415 PE 6/1/2019 5550037PIS1.00NEIngleRdExtension Goodwin to 232nd Ave from: New construction to: Totals 555 PE 1/1/2016 6/1/2016 505050163824P00220CN220220NWPacificRimBlvd. @ SE Payne Rd. from: Traffic signal No to: Totals 270270270 ALL 1/1/2018 2702702701439P2400NWBradyRoad @ NW 16th Ave. from: Traffic signal No to: Totals 270270270 270ALL1/1/2018 270 2704016P2400NWLakeRoad @ NW Sierra St. from: Traffic Signal to: Totals 270270270 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 10 Six Year Transportation Improvement Program From 2014 to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department of Transportation CamasAgency: Co.No.:06 City No.:0145 Co.Name:Clark Co. MPO/RTPO:RJC Hearing Date: Amend Date: Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending UP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) inB.Bridge No.5 Fund Source Information0)CO 0CD O £ o>TJ.2 woJS toincoCO Federal Funding3o R/W Required Date {MM/YY } o -C5a3 Federal Fund Code Federal Cost by Phase State Fund Code Phase Start 4thCOo Envir. TypeTotal Funds State Funds Local Funds o '4=U_ .2 ThruH-Z)3rd1st2ndo1—6thQ. 1 19 20 2121834101314151617567891112 2701/1/2019ALL 270 2700041P2400NEGoodwinRd@NWCamasMeadowsDr No from: Traffic signal to: Totals 270270270 5PE1/1/2019 551642P00ISNWPacificRim(5)Parker St from: Traffic Signal to: T otals 555 51/1/2019 5PE51643P/6 00SR-500 @ Leadbetter Rd from: Access Control to: Totals 555 5PE1/1/2019 5 51644pIS00SR-500 @A/ew EAVArterial from: Traffic Signal to: Totals 555 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 11 Six Year Transportation Improvement Program From 2014 to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department of Transportation CamasAgency: Co.No.:06 City No.:0145 Co.Name:Clark Co. MPO/RTPO:RTC Hearing Date: Amend Date: Project Identification A.PIN/Federa!Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Project Costs in Thousands of Dollars Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) if)B.Bridge No.£Fund Source Information150)>><D .2 E 0D>oo1/5.2 w15JS§u totococo2 Federal Funding03 RANosz20.2*Required Date {MM/YY) 2 Phase Start Federal Fund Code State Fund Code CO Federal Cost by Phase 4tho Envir. TypeLocal Funds State Funds Total Funds LL o 43 .0 ThruH=3 3rd1st2ndol—6thQ. 1 2 3 4 5 6 7 8 19 20 219101112131415161718 PE 1/1/2019 5551645P/5 00NE28thSt@242ndAve from: Traffic Signal to: T otals 555 PE 1/1/2019 5551746PIS00NEGoodwinRoad @ NE Ingle Rd. from: Traffic Signal No to: Totals 555 1/1/2019PE 5551647PI S 0.00SR-500 @ NE Lake Rd. from: Roundabout Yes to: Totals 555 ALL 1/1/2019 5050501648P2400SR-500 @ NE 14th Ave. from: Controlled access No to: Totals 505050 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 12 Six Year Transportation Improvement Program From 2014 to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co. MPO/RTPO:RTC Hearing Date: Amend Date:City No.:0145 Project Identification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Project Costs in Thousands of Dollars Federally Funded Projects OnlyExpenditureSchedule {Local Agency )B.Bridge No.£</)Fund Source Information>r <Dc-Q.2 E ro o CDCDu O W.2 v)13 JS1° toIf)c o ro Federal Fundingaa)R/WoszTOCL>.Required Date (.MM/YY) STO Phase Start Federal Fund Code CO Federal Cost by Phase State Fund Code 4tho Envir. Type Local Funds Total Funds State Funds u_o *3 <D ThruHZ>2nd1st 3rdS'6thCL 1 2 3 4 5 6 9 18 20 2178101113141516171912 1/1/2019PE 5550049P00isNE232ndAve@9thSt from: Roundabout to: T otals 555 PE 1/1/2019 5 550050p00ISNE232ndAve(5)Inqle Extension from: Roundabout to: Totals 555 CN 1/1/2014 2100700700420042007000051Pp4700PavementTreatments(maintenance &preservation )No from: Overlays,surface treatments to: Totals 700 210042004200700700 ALL 1/1/2016 250 750100010000052G04P00wReconstructs from:Citywide to: Totals 75010001000250 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 13 Six Year Transportation Improvement Program From ^014^to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co. MPO/RTPO:RTC Hearing Date: Amend Date:City No.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency )B.Bridge No.£CD Fund Source Information>>Q;a;0CD-o O W.Q CD o JS5° •c -9 CDCDEOCO Federal Funding3CD R/W Required Date (.MM/YY) o E o Jc3Q.&TO Phase Start Federal Fund Code Federal Cost by Phase State Fund Code c/>4ths Envir. TypeState Funds Total Funds Local Funds oLL .0 ThruH=3 3rd1st2ndS' 6thCL 1 2 3 4 5 6 9 20 217810111213161718191415 CN 1/1/2015 CDBG 100 300450505001000053pPS00SidewalkProjects No from: Sidewalk installation to: Totals 30045010010050500 CN 1/1/2015 1515 457575as0054P00CurbRampProjects No from: Future curb ramp installations to: Totals 15 15 457575 ALL 1/1/2014 STP(E)250 250 250*81655 P CE.30NW18thSharedPath SE 201st to Beech St from: No to: Totals 250 250 250 ALL 1/1/2016 50 15020020056oop00SharedPathImprovements Citywide from: No to: Totals 50 150200200 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 14 Six Year Transportation Improvement Program From 2014 to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co. MPO/RTPO:RTC Hearing Date: Amend Date:City No.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency )£U)B.Bridge No.Fund Source InformationCL) .2 E (DCD CDO)-Oo10.2 iooJ2cO wwcocu Federal Funding30)R/Wo-C5Q-Required Date (MM/YY) Phase Start Federal Fund Code Federal Cost by Phase State Fund Code C/3 4thi Envir. TypeSlate Funds Local Funds Total Funds oLL 0)Thru3rd2nd1sto'6thCL 1 2 3 18 19 20 214567811121314151617910 50 150CN1/1/2016 200200005721P00SafetyProjects from: Future safety projects to: Totals 50 150200200 CN 1/1/2015 5550058P0036StormGrateReplacements(Bike Improvements)No from: Storm grate replacements for bike lane improvements to: Totals 5 55 5 15CN1/1/2016 20200059P£6 00FutureBikeRouteImprovements Citywide from: Future bike route improvements No to: Totals 1552020 2020 60CN1/1/2015 100 1000060P21ooStreetLiqhtinq Citywide from: Street lighting No to: Totals 20 6020100100 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 15 Six Year Transportation Improvement Program From 2014 to 2019 6/3/2013 Adoption Date:6/17/2013 Resolution No.:1272 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co, MPO/RTPO:RJC Hearing Date: Amend Date:City No.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) V)B.Bridge No.£Fund Source Information>*CD •c -Qo£ CL 2 Q)TO TOO)"O.2 to O J S§° wv>c o TO Federal Funding5a)R/WosziSQ_&Required Date (MM/YY) JS Phase Start Federal Fund Code Federal Cost by Phase State Fund Code 4thCOTO Envir. TypeLocal Funds Total Funds State Funds S3oLU .TO ThruHD3rd2nd1sto6thCL 1 2 2131618192045678111213141517910 10001/1/2019ALL BR 800 200 10000261P140NE3rdAve.Washouqal River Bridge No from: Seismic rating,scour critical,and footing rehabilitation to: Totals 10002001000800 Grand Totals for Camas 6,920 40,380 49,100 9,625 1890 4,165 33,4201,800 v.5.7 -Supersedes previous editionsReportDate:May 14,2012 Page 16 9 .Appendices A .Six Year Form Instructions Heading Agency County No. City No, MPO/RTPO Enter name of the sponsoring agency. Enter the assigned number (see LAG Appendix 21.44). Enter the assigned number (see LAG Appendix 21.45). Enter the name of the associated MPO (if located within urbanized area)or RTPO (if located in a rural area). Enter the date of the public hearing. Enter the date this program was adopted by council or commission. Enter Legislative Authority resolution number (if applicable.) Enter the date this program was amended by council or commission. Hearing Date Adoption Date Resolution No. Amendment Date Column Number 1 .Functional Classification .Enter the appropriate 2-digit code denoting the Federal Functional Classification.{Note:The Federal Functional Classification must be one approved by FHWA.) Description 00-No Classification Rural (<5000 pop.) 01 -Interstate 02 -Principal Arterials 06 -Minor Arterials 07 -Major Collector 08 -Minor Collector 09 -Local Access Urban (>5000 pop.) 11 -Interstate 12 -Freeways &Expressways 14 -Other Principal Arterials 16 -Minor Arterial 17 -Collector 19 -Local Access 1.Priority Numbers.Enter local agency number identifying agency project priority (optional). 2.Project Identification.Enter (a)Federal Aid Number if previously assigned;(b) Bridge Number;(c)Project Title;(d)Street/Road Name or Number/Federal Route Number; (e)Beginning and Ending Termini (milepost or street names);and (f)Describe the Work to be Completed. 4.Improvement Type Codes.Enter the appropriate federal code number. SEE APPENDIX A 5.Funding Status.Enter the funding status for the entire project or phase that describes the current status. S -Project is ‘selected’by the appropriate selection body and funding has been secured by the lead agency. P -Project is subject to selection by an agency other than the lead and is listed for planning purposes.(Funding has not been determined.) 6.Total Length.Enter project length to the nearest hundredth (or code “00”if not applicable ). 7 .Utility Code(s).Enter the appropriate code letter(s)for the utilities that need to be relocated or are impacted by the construction project. G -Gas P -Power S -Sewer (other than agency-owned)T -Telephone W -Water C -Cable TV O -Other 8.Project Phase .Select the appropriate phase code of the project. PE -Preliminary Engineering,including Design (or Planning) RW -Right of Way or land acquisition CN -Construction only (or transit planning or equipment purchase ) ALL -All Phases:from Preliminary Engineering through Construction 9.Phase Start Date.Enter the month/day/year in MM/DD/YY format that the selected phase of the project is actually expected to start. 10.Federal Fund Code.Enter the Federal Fund code from the table. SEE APPENDIX C 11 .Federal Funds.Enter the total federal cost (in thousands )of the phase regardless of when the funds will be spent. 12 .State Fund Code.Enter the appropriate code for any of the listed state funds to be used on this project. SEE APPENDIX C 13.State Funds.Enter all funds from the State Agencies (in thousands)of the phase regardless of when the funds will be spent. 14 .Local Funds.Enter all the funds from Local Agencies (in thousands)of the phase regardless of when the funds will be spent. 15.Total Funds.Enter the sum of columns 10,12,and 14.(Auto-calculation in the “STIP Too”program.) 16-19.Expenditure Schedule -(1st,2nd,3rd,4th thru 6th years).Enter the estimated expenditures (in thousands )of dollars by year .(For Local Agency use.) 20.Environmental Data Type.Enter the type of environmental assessment that will be required for this project.(This is “required”for Federally funded projects ,but may be filled in for state or locally funded projects.) EIS -Environmental Impact Statement EA -Environmental Assessment CE -Categorical Exclusion 21.R /W Certification.Click Y if Right of Way acquisition is or will be required.If yes, enter R /W Certification Date,if known.(This is “required”for Federally funded projects APPENDIX A IMPROVEMENT TYPE CODES 01 New Construction Roadway Reconstruction,Added Capacity Reconstruction,No Added Capacity 4R Maintenance Resurfacing 4R Maintenance -Restoration &Rehabilitation 4R Maintenance -Relocation Bridge,New Construction Bridge Replacement,Added Capacity Bridge Replacement,No Added Capacity Bridge Rehabilitation,Added Capacity Bridge Rehabilitation,No Added Capacity Preliminary Engineering Right of Way Construction Engineering Planning Research Environmental Only Safety Rail/Highway Crossing Transit Traffic Management/Engineering -HOV Vehicle Weight Enforcement Program Ferry Boats Administration Facilities for Pedestrians and Bicycles Acquisition of Scenic Easements and Scenic or Historic Sites Scenic or Historic Highway Programs Landscaping and Other Scenic Beautification Historic Preservation Rehab &Operation of Historic Transp.Buildings,Structures,Facilities Preservation of Abandoned Railway Corridors Control and Removal of Outdoor Advertising Archaeological Planning &Research Mitigation of Water Pollution due to Highway Runoff Safety and Education for Pedestrians/Bicyclists Establishment of Transportation Museums Special Bridge Youth Conservation Service Training Utilities Other Debt Service Systematic Preventive Maintenance 03 04 05 06 07 08 10 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 47 APPENDIX C FEDERAL FUND CODES FTA Urbanized Area Formula Program FTA Bus and Bus Facilities FTA Fixed Guideway Modernization FTA New Starts FTA Elderly Persons and Persons with Disabilities FTA Rural Area Formula Grants FTA Job Access &Reverse Commute Program (JARC) FTA New Freedom Program Discretionary Programs such as Alternatives Analysis (5339)and TIGGER Program Bureau of Indian Affairs Bridge Replacement/Rehabilitation Program Coordinated Border Infrastructure Community Development Block Grant (Dept,of Commerce) Congestion Mitigation and Air Quality Demonstration Projects (High Priority,Sect.112,115,117,125 and 129) Ferry Boat Discretionary Interstate Maintenance Discretionary Intelligent Transportation Systems Public Lands Highways (Federal Lands) Scenic Byways Surface Transportation Priorities Transportation,Community &System Preservation Program Department of Defense Freight Mobility Strategic Investment Board Interstate Maintenance Indian Reservation Roads National Highway System Safe Routes to Schools Surface Transportation Program (WSDOT Use Only) Surface Trans.Program -Enhancements Surface Trans.Program -Legislative Earmarks Surface Trans.Program-Safety (Includes Highway)Safety Improvement Program,Hazard Elimination,Railway/Highway Crossing Program and 2010-15 County Road Safety Program) Surface Trans.Program -Rural Regionally Selected Surface Trans.Program -Urban Regionally Selected 5307 5309(Bus) 5309(FG) 5309(NS) 5310 5311 5316 5317 FTA Discretionary BIA BR CBI CDBG CMAQ DEMO Discretionary-FBD Discretionary-IMD Discretionary-ITS Discretionary-PLH Discretionary-SB Discretionary-STP Discretionary-TCSP DOD FMSIB IM IRR NHS SRTS STP STP(E) STP(L) STP(S) STP(R) STP(U) STATE FUND CODES CRAB FMSIB PWTF SRTS-TIB County Road Administration Board Freight Mobility Strategic Investment Board Public Works Trust Fund Safe Routes to Schools Transportation Improvement Board Transportation Partnerships Program WSDOT funds Any other state funds not listed TPP WSDOT OTHER