Loading...
RES 1216I'Io.1RESOLUTIONNO. A RESOLUTION revising and extending the Comprehensive Street Program for an additional six (6)years. WHEREAS,pursuant to the requirements of RCW 35.77.010,the City of Camas did,by Resolution No.169,adopt a Comprehensive Street Program for the ensuing six (6)years,and WHEREAS,said law requires the City revise and extend said Comprehensive Street Program annually,and WHEREAS,pursuant to said law,the City Council of the City of Camas being the legislative body of said City did hold a public hearing on said revised Comprehensive Plan at 7:00 p.m.at the City Hall in Camas,Washington,on the 6th day of June,2011,and WHEREAS,there were no written or oral objections to the revised Comprehensive Plan as prepared by the City of Camas relative to the street program for the ensuing six (6)years within the City of Camas. NOW,THEREFORE,BE IT RESOLVED by the Council of the City of Camas that the Comprehensive Plan heretofore adopted and revised by the City Engineer for the City of Camas, as submitted to the City Council for the City of Camas,be and the same is hereby adopted and extended for an additional six (6)year period from the date thereof. BE IT FURTHER RESOLVED,that the City Clerk fde a copy of said revised Comprehensive Street Program for the ensuing six (6)years,together with a copy of this resolution,with the Secretary of Transportation of the State of Washington. PASSED by the Council and APPROVED by the Mayor Ms /6th day of June,2011. jfSIGNED: Mayor Av /3lcA^1 Clerk ATTEST: APPRQ s to form: / City Attorney Six Year Transportation Improvement Program From 2012 to 2017 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co.6/6/2011 Adoption Date:6/20/2011 Resolution No.:1216 Hearing Date: Amend Date:MPO/RTPO:RJCCityNo.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) (ASZB.Bridge No.Fund Source Information>»CD-O .2 E 003 CDU)T3c=(f )</>cC/5 OO 03 Federal Funding3C/5 0 R/WoSZ03OreCLRequired Date (MM/YY ) §°State Fund Code re Phase Start Federal Fund Code Federal Cost by Phase co 4tho Envir. Type State Funds Local Funds Total Funds ou_.0 ThruHZ>1st 2nd 3rdo 6thCL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1 /2012 1/1/2012 6/1/2012 STP(U) STP(U) 340 500 500160161SC01.59 RW 190 310 500 500SNW38thAve.Extension (west) Armstrong St.to SE 192nd Ave. from: New construction with bike lanes YesCN250020005002500W Gto:P T Totals 3150 3500 1000350 2000 500 PE 8/1/2012 1 /1/2013 6/1/2014 115 115 115162P04P.53 RW 225 225 225CNWBradyRd NW 16th to NW 25th from: Widening,bike lanes YesCN675675675G Tto: Totals 1015 1015 115 225 675 PE 1 /1 /2013 1/1/2014 6/1/2015 220 220 60 60 100173Pw04.54 RW 820820 270 550SNW38thAve NW Parker to SE Armstrong St. from: Widening ,bike lanes YesCN248024802480P Tto:C G Totals 3520 3520 60 330 3130 PE 1 /1 /2013 1/1 /2014 6/1 /2015 400 400 200 20016P404P.77 RW 400 400 400CNW38thAvenue NW Parker to NW Astor from: Widening,bike lanes YesCN230023002300G Tto: Totals 3100 3100 200 600 2300 v.5.7 -Supersedes previous editionsReportDate:May 13,2011 Page 1 Six Year Transportation Improvement Program From 2012 to 2017 Washington State Department of Transportation Agency:Carnas Co.No.:06 Co.Name:Clark Co.6/6/2011 Adoption Date:6/20/2011 Resolution No.:1216 Hearing Date: Amend Date:MPO /RTPO:RTCCityNo.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) if )SIB.Bridge No.Fund Source Informationd>TO 0>*(D i=-a O)Oc cn</>if )C oo TO Federal Funding3if)a>R /Wa.2 E -CTOOCLH=3 Required Date (MIWYY ) Q_Federal Fund Code State Fund Code Phase Start Federal Cost by Phase in 4thzo Envir. Type State Funds Local Funds Total Funds oLL 0 ThruH1st2nd3rd'o’ 6thCL 1 2 17345678910111213141516 18 19 20 21 ALL 1/1/2015 WSDOT 20000 20000 2000012504P2.25SR-14 West Camas Slough Bridge No from: Widen to 4 lanes,add median NOTE:PE phase began 1/2006 to: Totals 20000 20000 20000 CN 1 /1 /2015 700 700 700176P CE01P.83 CNWLeadbetterDr.,Ph.2 NW Lake Rd.to NW Parker St. from: Widening with bike lanes,sidewalk NOTES:PE phase began 1/2007 No05T Gto:W S Totals 700 700 700 CN 1 /1 /2012 180 180 30 30 30 9014732PooADAInventoryandTransitionPlan No from:Citywide to: Totals 180 30 30 30180 90 ALL 6/1/2015 200 200 200198Sc01.25 SNWMarylandStreet NW 19th to NW 24th from: New construction NoW Gto:P T Totals 200 200 200 v.5.7 -Supersedes previous editionsReportDate:May 13,2011 Page 2 Six Year Transportation Improvement Program From 2012 to 2017 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co. MPO/RTPO:RTC 6/6/2011 Adoption Date:6/20/2011 Resolution No.:1216 Hearing Date: Amend Date:City No.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) U)JZB.Bridge No.Fund Source Information<D03 CD .2 E O)T3C if )if)CO C oo 03 Federal Fundingzsin0 R/Wosz03_lore Q_Required Date (.WIM/YY ) c O re Phase Start Federal Fund Code Federal Cost by Phase State Fund Code c/>4tho Envir. Type State Funds Local Funds Total Funds 9OLL CD Thruh-Z)1st 2nd 3rd'o 6thDL 1 2 3 8 10 11 12 13 14 15 16 17 18 19 20 2145679 240ALL1/1 /2015 240 24000905P00.23NW23rdAve. NW Astor to NW Sierra from: Widening ,sidewalk Yes to: Totals 240 240 240 ALL 1/1/2016 270 2702700010W01P.13 SNWLarkspurSt. NW Lake Rd.to NW 60th from: New construction YesP Tto:C G Totals 270 270 270 PE 1 /1 /2014 1/1/2015 6/1 /2016 100 1001001711P04P.62 RW 100 100 100cNWAstorSt./NW 11th Ave. NW 16th Ave.to McIntosh Rd. from: Widening,bike lanes YesCN163016301630G Tto: Totals 1830 1830 100 1730 1/1/2017 6/1 /2017 200RW200 2001612S04P.51 CN 1800 1800 1800WNW18thAve.,eta! NW Astor to NW 16th,include NW Hood from: Widen curb,sidewalk YesP Tto:C Totals 2000 2000 2000 v.5.7 -Supersedes previous editionsReportDate:May 13,2011 Page 3 Six Year Transportation Improvement Program From 2012 to 2017 Washington State Department of Transportation Agency:Carnas Co.No.:06 Co.Name:Clark Co. MPO/RTPO:RTC 6/6/2011 Adoption Date:6/20/2011 Resolution No.:1216 Hearing Date: Amend Date:City No.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) </)-CB.Bridge No.Fund Source Information>»(D •iz -a O E=3 003 a)U)oc cn(AC/3 C oo 03 Federal Funding3C/3 0 R/WoJZ03lOCBCL>s Required Date (.MM/YY ) c O CL re Phase Start Federal Fund Code Federal Cost by Phase Statec/)4th13o Envir. Type State Funds Local Funds Total Funds oLL CD Fund ThruHD1st2nd3rdo'Code 6thQ_ 1 2 3 6 8 10 11 12 13 14 15 16 17 18 19 20 214579 PE 2001/1/2015 6/1/2016 6/1/2017 200 2001613P04P.26 RW 134 134 134GNW18thAve. NW Whitman St.to NW Brady Rd. from: New construction with bike lanes YesCN130013001300T Cto:W S Totals 200 1434 1634 1634 PE 501/1/2015 6/1/2017 50 501614W05P.75 CN 210 210 210SNW18thAvenue NW Whitman St.to West City Limits from: Widening ,bike lanes NoP Tto:C G Totals 260 260 260 PE 6/1/2015 6/1/2016 3/1 /2017 400 400 4000015C01p.42 RW 400 400 400SNW38thAve.Extension (east) NW Astor to NW Sierra from: New construction with bike lanes YesCN190019001900W Gto:P T Totals 2700 2700 2700 PE 1 /1/2014 6/1/2016 3/1/2017 300300300C171604P.36 RW 300 300 300SNE43rdAve.YesCN135013501350G Pfrom:SR-500 Widen to 3 lanes with bike lanes to:East City Limits T Totals 1950 1950 300 1650 v.5.7 -Supersedes previous editionsReportDate:May 13,2011 Page 4 Six Year Transportation Improvement Program From 2012 to 2017 Washington State Department of Transportation Agency:Camas Co.No.:06 Co.Name:Clark Co. MPO /RTPO:RTC 6/6/2011 Adoption Date:6/20/2011 Resolution No.:1216 Hearing Date: Amend Date:City No.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) tr )szB.Bridge No.Fund Source Informationa>CO a)>>0 iz -O O E O)~oc C/3C/3C/3 C oo 03 Federal Funding3C/3 0)R/Wo-C03oTO_Required Date (MM/YY ) c O .t;TO Phase Start Federal Fund Code Federal Cost by Phase State Fund Code co 4thZ3O Envir. Type State Funds Local Funds Total Funds o +5LL 0)Thruh-3 1st 2nd 3rd'o'6thCL 1 2 3 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21457 ALL 1 /1/2017 2890 2890 28900017S05P.5 PNW43rd/NW Astor -NW Sierra to NW 38th YesC Gfrom: Widening,bike lanes to:T Totals 2890 2890 2890 PE 1/1 /2017 5 5 50018C04P.75 GNWFriberq/Strunk St. NW Lake Rd.to NE Goodwin Rd. from: Widening,bike lanes YesP Tto: Totals 5 5 5 PE 1 /1 /2017 5 5 50019C01p.90 SNorthDwyerCreekMasterPlanStreet“6” NW Friberg St./Strunk to NW Larkspur St. from: New construction YesW Gto:P T Totals 5 5 5 ALL 1/1 /2017 19901990 1990C002004P.40 GNWPayneSt. NW Lake Rd.to NW Camas Meadows Dr. from: Widening YesP Tto: Totals 1990 1990 1990 v.5.7 -Supersedes previous editionsReportDate:May 13,2011 Page 5 Six Year Transportation Improvement Program From 2012 to 2017 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co. MPO/RTPO:RTC 6/6/2011 Adoption Date:6/20/2011 Resolution No.:1216 Hearing Date: Amend Date:City No.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) (/)szB.Bridge No.Fund Source Information<D03 0>?CD •=-Q u>oc CO(A0 c oo 03 Federal Funding130Q)R/WooE03_lOCO CL>i-=3 Required Date (MM/YY ) §°CL co Phase Start Federal Fund Code Federal Cost by Phase StateCO 4tho Envir. Type State Funds Local Funds Total Funds oLL 0 ^Fund ThruH31st2nd3rdoCode6thCL 21 3 5 6 8 9 10 11 12 13 14 15 16 17 18 19 20 2147 PE 1 /1/2017 5 5 5C002101P.64 SNorthDwyerCreekMasterPlanStreet“A” NW Lake Rd.to NW Camas Meadows Dr. from: New construction YesW Gto:P T Totals 5 5 5 PE 1 /1/2017 5 5 50022P04P1.2 GNWMcIntoshRd. NW Brady Rd.to NW 11th Ave. from: Widening,bike lanes YesC Tto: Totals 5 5 5 ALL 1 /1/2017 4400 4400 4400C002301P.70 SNE35th/38th Ave. NE 283rd Ave.to SE 15th St. from: New Construction YesW Gto:P T Totals 4400 4400 4400 PE 1/1/2017 5 5 50724C04P.59 SSE15thSt./Nourse Rd Yes W Gfrom:Camas High School Widen to 3 lanes with bike lanes to:NE 283rd Ave. P T Totals 55 5 v.5.7 -Supersedes previous editionsReportDate:May 13,2011 Page 6 Six Year Transportation Improvement Program From 2012 to 2017 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co.6/6/2011 Adoption Date:6 /20/2011 Resolution No.:1216 Hearing Date: Amend Date:MPO /RTPO:RTCCityNo.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) c/>szB.Bridge No.Fund Source Information003CD>»CD IZ -Q o>Oc C/D</>C/D C oo 03 Federal Funding3if)0 O R/W Required Date (MM/YY ) .2 E _c03OCOQ_>»i-Z3cOCL Federal Fund Code Federal Cost by Phase State Fund Code re Phase Start co 4th=3 O Envir. Type State Funds Local Funds Total Funds o '43LL (D Thru31st2nd3rd‘o' 6thQ_ 1 2 3 10 11 12 13 14 15 16 17456789 18 19 20 21 PE 6/1/2017 55 5002501P0.67A/E 18th St NE 192nd Ave to NE Goodwin Rd from: New construction to: Totals 5 5 5 PE 6/1 /2017 5 5 5172604P1.38NEGoodwinRd/28th St NE 18th St.to NE 232nd Ave. from: Widen to 5 lanes with bike lanes to: Totals 5 5 5 PE 6/1 /2017 5 5 5172704P0.50NE28thStreet NE 232nd Ave.to NE 242nd Ave. from: Widen to 5 lanes with bike lanes to: Totals 5 5 5 PE 6/1 /2017 5 5 5002801P0.20NWCamasMeadowsDr. NE 13th St.to NE 18th St. from: New Construction to: Totals 5 5 5 v.5.7 -Supersedes previous editionsReportDate:May 13,2011 Page 7 Six Year Transportation Improvement Program From 2012 to 2017 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co.6/6/2011 Adoption Date:6/20/2011 Resolution No.:1216 Hearing Date: Amend Date:MPO /RTPO:RTCCityNo.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) &JZB.Bridge No.Fund Source InformationC<D03 0 •c -o .2 E O _ o ^ O)Oc if )if )cif)oo 03 Federal Funding£if )Q>R/W Required Date (.MIWYY ) o -C03>Q.O re CL>%oCOQp re Phase Start Federal Fund Code Federal Cost by Phase Stateco 4tho=3 Envir. Type State Funds Local Funds Total Funds oLLE 0 Fund Thruh-Z>1 st 2nd 3rd'o'Code 6th0. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 6/1 /2017 5 5 5002901P0.41 NW Camas Meadows Drive NW Payne St.to NW 60th Ave. from: New construction to: Totals 5 5 5 PE 6/1/2017 5 5 5173004p0.97NE232ndAve. NE 28th St.to NE 9th St. from: Widen to 3 lanes with bike lanes to: Totals 5 5 5 PE 6/1 /2017 5 5 5003101P0.50NE9thSt. NE 232nd Ave.to NE 242nd Ave. from: New construction to: Totals 5 5 5 PE 6/1/2017 5 5 50832P041.21SECrownRd. SE 23rd St.to NE 3rd Ave. from: Widen to 3 lanes with bike lane to: Totals 5 5 5 v.5.7 -Supersedes previous editionsReportDate:May 13,2011 Page 8 Six Year Transportation Improvement Program From 2012 to 2017 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co.6/6/2011 Adoption Date:6/20/2011 Resolution No.:1216 Hearing Date: Amend Date:MPO /RTPO:RTCCityNo.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) &JCB.Bridge No.Fund Source Informationo030>>CD *c -Q O)T3C C/3(/)C/3 C oo 03 Federal Funding3C/3 Cl>R/W Required Date (MIWYY ) O.2 E -C03_lOre Q_i-Z31°±JCLre Phase Start Federal Fund Code Federal Cost by Phase State Fund Code </>4tho Envir. Type State Funds Local Funds Total Funds oLL 0 ThruH31st2nd3rd'o 6thCL 1 2 3 6 8 10 11 12 13 14 15 16 17 18 19 204579 21 PE 6/1/2017 5 5 5003304P0.70NE242ndAve. NE 28th St.to NE 14th St. from: Widen to 3 lanes with bike lane to: Totals 5 5 5 PE 6/1/2017 5 5 5003401P2.00NewNUGAEMArterial NE 14th St.to Nourse Rd. from: New construction to: Totals 5 5 5 PE 6/1/2017 5 5 5163504P1.08SR-500 (Everett St/Rd) NW Lake Rd.to SE 4th St. from: Widen to 3 lanes with bike lane to: Totals 5 5 5 ALL 1/1/2016 200 200 200143612p00NW6thAve. @ NW Norwood St. from: Traffic signal No to: Totals 200 200 200 v.5.7 -Supersedes previous editionsReportDate:May 13,2011 Page 9 Six Year Transportation Improvement Program From 2012 to 2017 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co.6/6/2011 Adoption Date:6/20/2011 Resolution No.:1216 Hearing Date: Amend Date:MPO/RTPO:RTCCityNo.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) V)JZB.Bridge No.Fund Source InformationCD030CD •JZ JO .2 E U)"Oc (/)(A cC/5 Oo CO Federal Funding3C/)CD R /Wo_c03OCOCL Required Date (MM/YY ) Federal Cost by Phase State Fund Code CO Phase Start Federal Fund Code c/)4tho Envir. Type State Funds Total Funds Local Funds ol_L 0 ThruID1st2nd3rd‘o' 6thCL 1 2 3 16456789101112131415 17 18 19 20 21 ALL 1 /1/2017 200 200 200163712P00NWPacificRimBlvd. @ NW Parker St. from: Traffic signal No to: Totals 200 200 200 ALL 1/1 /2017 267 267 267003812P00A/E Goodwin Rd. (a)NW Friberg St./Strunk or NW Camas Meadows from: Traffic signal No to: Totals 267 267 267 ALL 1/1/2017 267 267 267003912P00NWFribergStreet/Strunk @ North Dwyer Creek Master Plan Street “B” from: Traffic Signal No to: Totals 267 267 267 ALL 1/1/2017 267 267 267144012P00NWLakeRd. @ N Dwyer Crk Mstr Plan Str.“A ”or NW Payne St. from: Traffic signal No to: Totals 267 267267 v.5.7 -Supersedes previous editionsReportDate:May 13,2011 Page 10 Six Year Transportation Improvement Program From 2012 to 2017 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co.6/6/2011 Adoption Date:6/20/2011 Resolution No.:1216 Hearing Date: Amend Date:MPO /RTPO:RTCCityNo.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) tnszB.Bridge No.Fund Source Information>>0 .2 E CD05 CDO)Oc C/3C/3c/>c oo 05 Federal Funding3C/3 CD R/Wo-C05—IOre _>>Required Date (MM/YY ) §°.ti StaterePhase Start Federal Fund Code Federal Cost by Phase cn 4tho Envir. Type State Funds Local Funds Total Funds oLL CD Fund Thrui-3 1st 2nd 3rd‘o Code 6thCL 1 2 3 8 9 10 11 12 13 14 15 16 17 18 19 20 214567 6/1 /2017PE 50 50 50004112P0.00NewNUGAIntersectionStudies from: Traffic signals and roundabouts to: Totals 50 50 50 CN 1/1 /2012 600 60036003600600 180042P0007PooPavementTreatments(maintenance &preservation)No from: Overlays,surface treatments to: Totals 3600 3600 600 600 600 1800 ALL 1/1 /2014 10001000 250 7500043G03P00wReconstructs from:Citywide to: Totals 1000 1000 250 750 CDBGCN1/1 /2014 540 60 600 300 300004432PooSidewalkProjects No from: Sidewalk installation to: Totals 300 30054060600 v.5.7 -Supersedes previous editionsReportDate:May 13,2011 Page 11 Six Year Transportation Improvement Program From 2012 to 2017 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co.6/6/2011 Adoption Date:6/20/2011 Resolution No.:1216 Hearing Date: Amend Date:MPO /RTPO:RTCCityNo.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) (/>JCB.Bridge No.Fund Source Information>?aj •d -Q O £*1 Q)03 0U)-Oc C/3(/)ifi c oo CO Federal Funding3cna>O R/W Required Date (MIWYY ) _cCOoCL>*c o Phase Start Federal Fund Code Federal Cost by Phase State Fund Code (0to 4tho Envir. Type State Funds Local Funds Total Funds oLL 0 ThruD1st2nd3rd'o 6thCL 1 2 3 11 18 1945678910121314151617 20 21 CN 1 /1/2012 CDBG 810 90 900 300 300 300004532p00CurbRampProjects-ADA Compliance No from: Future curb ramp installations to: Totals 810 900 30090300300 CN 6/1 /2015 80 80 80004612p00NW38thAve.Lighted Crosswalk (Safety ) at Grass Valley Park from: Installation of lighted crosswalk at Grass Valley Park No to: Totals 80 8080 ALL 1 /1 /2014 200 200 50 150004732P00SharedPathImprovements Citywide from: No to: Totals 200 200 50 150 CN 1/1 /2014 200 200 50 150004812p00FutureSafetyProjects from: Future safety projects to: Totals 200 200 50 150 v.5.7 -Supersedes previous editionsReportDate:May 13,2011 Page 12 Six Year Transportation Improvement Program From 2012 to 2017 Washington State Department of Transportation CamasAgency: Co.No.:06 Co.Name:Clark Co.6/6/2011 Adoption Date:6/20/2011 Resolution No.:1216 Hearing Date: Amend Date:MPO/RTPO:RTCCityNo.:0145 Project Costs in Thousands of DollarsProjectIdentification A.PIN/Federal Aid No. C.Project Title D.Street/Road Name or Number E.Beginning MP or Road -Ending MP or Road F.Describe Work to be Done Federally Funded Projects OnlyExpenditureSchedule (Local Agency ) tr>szB.Bridge No.Fund Source Information005CD<D .2 E O)73c C/3V)c(/)oo 05 Federal Funding3</)0 R /Wosz03O0a.>Required Date (,MIWYY ) c O Federal Fund Code State Fund Code 0 Phase Start Federal Cost by Phase co 4th=3 O Envir. Type State Funds Local Funds Total Funds oLL CD ThruHD1st2nd3rd’o'6thCL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 CN 1 /1/2013 5 5 5004932p00 Storm Grate Replacements (Bike Improvements)No from: Storm grate replacements for bike lane improvements to: Totals 5 5 5 CN 1 /1 /2014 20 20 155005032p00FutureBikeRouteImprovements Citywide from: Future bike route improvements No to: Totals 20 15205 CN 1 /1 /2013 100 100 20 20 60005106P00StreetLighting Citywide from: Street lighting No to: Totals 100 100 20 20 60 ALL 1 /1/2017 BR 800 200 1000 1000025210P0A/E 3rd Ave.Washouga!River Bridge No from: Seismic rating ,scour critical,and footing rehabilitation to: Totals 800 200 1000 1000 Grand Totals for Camas 1,900 38,515 40,415 1,930 3030 3,980 31,475 v.5.7 -Supersedes previous editionsReportDate:May 13,2011 Page 13