In Entirety - Biofilter Intent LetterPLAUCHE&CARR
LLP
Pacific Northwest Office �_ Gulf Coast Office
7218 3rd Ave., Suite 2000 — 1110 S River Rd., Suite 200
Seattle, WA 98101-3235 Baton Rouge, LA 70802
T
EL: (206) 588-4188 TEL: (225) 256-4028
AN: (206) 588-4255 FAX: (206) 588-4255
www.plauchecarr.com
August 12, 2021
Via Certified Mail
Managing Agent Donald Trost, President
Lacamas Shores Homeowners Association Lacamas Shores Homeowners Association
12503 SE Mill Plain Blvd., Suite 260
2421 NW Lacamas Drive
Vancouver, WA 986844008
Lacamas Shores Homeowners Association
P.O. BOX 751
Camas, WA 98607
Ellen Burton, Mayor
Office of the Mayor
City Hall
616 NE 4th Avenue
Camas, WA 98607
Camas, WA 98607
Registered Agent
Lacamas Shores Homeowners Association
12503 SE Mill Plain Blvd., Suite 260
Vancouver, WA 986844008
Re: Notice of Intent to File Suit under the Clean Water Act
Dear Lacamas Shores Homeowners Association and City of Camas,
This letter provides the Lacamas Shores Homeowners Association ("HOA") and the City
of Camas ("City") with sixty days' notice that Steven D. Bang intends to file a citizen lawsuit
against the HOA and City under Section 505 of the Clean Water Act, 33 U.S.C. § 1365, for the
Clean Water Act violations alleged in this letter. Plauche & Carr LLP represents Steven D. Bang
in this matter and any response to this notice of intent to sue should be directed to us at the
address below.
I. CLEAN WATER ACT VIOLATIONS
Congress enacted the Clean Water Act to "restore and maintain the chemical, physical,
and biological integrity of the Nation's waters." 33 U.S.C. § 1251(a). Section 301 of the Clean
Water Act implements that objective by prohibiting the discharge of any pollutant except as in
compliance with sections 1312, 1316, 1317, 1328, 1342, and 1344 of the Act. 33 U.S.C. §
1311(a). Accordingly, Section 301 of the Clean Water Act is violated when a person (1)
Lacamas Shores Homeowners Association
City of Camas -2-
August 12, 2021
discharges a pollutant (2) into navigable waters (3) from a point source (4) without a discharge
permit. Comm. to Save Mokelumne River v. E. Bay Mun. Util. Dist., 13 F.3d 305, 309 (9th Cir.
1993).
The HOA and City have violated and are violating 33 U.S.C. § 1311 and 33 U.S.C. §
1342 by discharging pollutants from the Lacamas Shores biofilter treatment facility ("Biofilter"),
located on Clark County Tax Lot 84839000, into Lacamas Lake and its adjoining wetlands
without a discharge permit. These violations have occurred since at least September 23, 2020 and
are ongoing.I
A. The Biofilter
The Biofilter was developed pursuant to a combined shoreline substantial development
permit and conditional use permit ("Shoreline Permit") for the Lacamas Shores residential
development in Camas, Washington. In June 1988, the City of Camas originally granted the
Shoreline Permit to Vanport Manufacturing, Inc., authorizing a new residential development
along the southwest shore of Lacamas Lake under the Shoreline Management Act of 1971,
chapter 90.58 RCW. A major concern during the permitting and environmental review process
for the Lacamas Shores development related to water quality impacts associated with erosion and
stormwater runoff, in particular phosphorus loading into the lake.
Because of the topography of the property, it was infeasible to develop sedimentation
ponds for the runoff Instead, stormwater was designed to be routed through french drains, or
"bubblers," and discharged into an existing, natural wetland adjoining Lacamas Lake. The
wetlands would then treat the inflowing stormwater before it enters Lacamas Lake. Attachment 1
at 8, 15-16. As stated in the project's draft environmental impact statement ("DEIS") the
biological consulting firm Shapiro & Associates, experienced in wetland boundary delineation,
was retained to identify and flag the wetland boundary on the site as it was deemed "necessary to
determine a definitive wetland boundary prior to developing the site plan." Id. at 34, Figure 6,
Appendix B. Shapiro and Associates' delineation included forested, scrub/shrub, and emergent
wetlands. Id. Conditions attached to the original Shoreline Permit stated the existing forested
wetlands adjacent to the shoreline should be retained intact as a functioning natural wetland,
required the forested wetlands to be separately delineated from the surrounding wetland areas,
and required the developer to implement a wetlands biofilter monitoring program. Another
condition required that an area below the 20046ot elevation adjoining the wetland area must be
held in reserve for future wetland/detention area, should monitoring demonstrate such a need.
The original Shoreline Permit was appealed to the Washington State Shorelines Hearings
Board ("SHB") by Citizens to Save Lacamas Lake. In response to a mutual request by the
parties, including the City and the Washington State Department of Ecology, the SHB entered an
' As discussed below, this is the date that samples were taken demonstrating Clean Water Act violations were
occurring. Given the Biofilter had fallen into disrepair prior to this date, and earlier water quality samples indicated
the Biofilter was previously discharging pollutants, the violations likely started far in advance of September 23,
2020.
Lacamas Shores Homeowners Association
City of Camas
-3-
August 12, 2021
agreed order remanding the Shoreline Permit to the City for reissuance with the following
instructions, among others:
4. The Developer agrees to commit a portion of the property now reserved for potential
wetland use to be developed immediately as part of the man-made wetlands created as
part of the biofilter storm drainage system on the project. This additional property is
depicted as the "newly -created wetlands" on the site plan attached as Exhibit A. These
newly -created wetlands and all other wetlands and land reserved for potential future
wetlands shall continue to be governed by the conditions and monitoring program set
forth in the existing permit conditions.
5. In consideration for the additional acreage contributed to the man-made wetlands, the
Developer shall have the right to reconfigure the lots in the existing site plan to obtain up
to 218 residential lots in the development.
6. The water quality monitoring and contingency program contained within the existing
permit conditions shall continue for the longer of five years commencing the date of the
reissuance of the Substantial Development Permit and Conditional Use Permit or until
such time that 75% of the lots depicted as "lots within the biofilter drainage" on Exhibit
A are developed.
Attachment 2.
Exhibit A of the SHB's order contains a figure depicting the naturally -occurring wetlands
along with the "newly created wetlands" required to be developed in Condition 4 of the SHB's
order. The naturally -occurring wetlands in Exhibit A are noted as being defined by Shapiro &
Associates and coincide with the wetlands delineated by Shapiro & Associates in the DEIS. The
naturally occurring wetlands are directly adjacent to Lacamas Lake, and the "newly created
wetlands" are located landward and in between the naturally occurring wetlands and the
Lacamas Shores development.
The revised Shoreline Permit was subsequently issued consistent with the SHB's agreed
order of remand. Attachment 3. Monitoring occurred for the next five years as required by the
Shoreline Permit, and the results were reported in a fifth -year monitoring report and a July 1993
Water Environment & Technology article. The report notes that the first two years of the study
focused on obtaining baseline information, and the third through fifth years were used to assess
the effectiveness of the Biofilter. The report states primary parameters (total phosphorus, soluble
phosphorus, and nitrate+nitrite-nitrogen) and total suspended solids measured at the outflows
were typically less than the inflowing concentrations, indicating that the wetlands were effective
at removing nutrients and solids from stormwater runoff.
After 1993, an adjacent but separate Swale/pond system was added to accommodate re-
routed stormwater from another 38.0 acres of HOA properties southeast of the Swale.
B. Biofilter Maintenance Failure and Resulting Discharge Violations
Lacamas Shores Homeowners Association
City of Camas
-4-
August 12, 2021
Responsibility for maintaining the Biofilter was initially vested in the developer, but a
condition of the Shoreline Permit transferred that responsibility to the HOA, stating as follows:
Creation of a homeowners association which will be responsible for monitoring and
maintaining the storm drainage system when the developer's responsibility has
been completed. These water quality safeguards will be imposed either through a
homeowners association charter or deed restriction before conveying title to
Lacamas Shores lot buyers.
Attachment 3, Condition 12.
Numerous authorities confirm that maintenance for a stormwater treatment facility
requires the regular removal of vegetation. For example, the Environmental Protection Agency
("EPA") warns as follows:
Without proper maintenance, excess pollutants in ponds and wetlands may actually
become sources of water quality issues such as poor water color/clarity/odor, low
dissolved oxygen leading to plant die off, and prevalence of algal blooms. When
these stormwater BMPs are "flushed" during a large rain event, the excess nutrients
causing these problems may be transferred to the receiving waterbody.
EPA Stormwater Wet Pond and Wetland Management Guidebook at 5.
Vegetation management is a critical maintenance activity. Grasses are recognized as a
common and effective choice for vegetation, and regular cutting and trimming grasses will "help
prevent diseases, pests, and the intrusion of weeds." Id. at 12. Wetland plants promote biological
uptake of pollutants, and may require harvesting (i.e., removal from the wetland area on a routine
basis and applying it in an upland location) "before winter die -off to prevent nutrients from
reentering the water column and being flushed downstream." Id. at 12 n.3. The Washington State
Department of Ecology's stormwater treatment manual similarly recognizes that stormwater
treatment wetlands are used to capture pollutants in a managed environment so that they will not
each natural wetlands and other ecologically important habitats, and vegetation must
occasionally be harvested. Department of Ecology 2019 SWMMWW at 902.
Additionally, the City developed specific guidelines for maintaining the Biofilter and
storm water systems, trails, and open space for the Lacamas Shores development. The storm
water system section states "[s]ince decomposing vegetation can release pollutants captured in
the wet pond, especially nutrients, it may be necessary to harvest dead vegetation annually prior
to the wet season. Otherwise, the decaying vegetation can export pollutants out of the pond and
also can cause nuisance conditions to occur." City of Camas, Lacamas Shores Homeowners
Association Interim Trail, Open Space, Wetland and Storm Drainage Maintenance Manual, at 1-
1. Recent guidance from the City for maintaining stormwater facilities includes
recommendations to mow grasses, control weeds, and remove blackberries and unplanned tree
seedlings at the bottom and on side slopes. If routine maintenance is not conducted, more
extensive activities may need to be undertaken, including removing established trees. City of
Camas, Storm, water Facility Maintenance Tips, 2018. See also Clark County Stormwater Manual
Lacamas Shores Homeowners Association
City of Camas -5- August 12, 2021
2015, Book 4, at 67 (stating that stormwater treatment wetlands perform well to remove
sediment, metals, and pollutants that bind to humic or organic acids, and vegetation in treatment
wetlands must occasionally be harvested).
Unfortunately, while the Biofilter was initially properly maintained and effectively
removed nutrients and solids from stormwater runoff, as documented in the fifth -year monitoring
report discussed above, it subsequently fell into disrepair. Specifically, the "filter" component of
the biofilter—namely, the grasses and aquatic plants that sequester pollutants—has not been
maintained because the HOA has not conducted the required management and harvesting of
vegetation. High -filtering, tightly knit, and easily removable grasses have been crowded out by
tree shadow, which prevents vegetation and contaminant removal. Leaves and dead plants in the
Biofilter litter the ground every year, discharging pollutants including phosphates and nitrogen
into the natural forested wetlands and Lacamas Lake.
Alarmed by the deteriorating state of the Biofilter and concomitant impacts to the water
quality of Lake Lacamas and its naturally -occurring, adjacent forested wetlands, the HOA
notified the City Administrator in 2016 that it intended to maintain the Biofilter, including
removing vegetation. The Administrator responded that all wetlands in the area were regulated
by the City, including those wetlands that were on previously -dry land. The Administrator
further stated as follows:
If clearing of the wetland area commences without permits and approvals from the
City of Camas, or any other required jurisdiction then full code enforcement
proceedings can and will take place including possible criminal charges for
knowingly and willfully working without approvals.
Wetland are regulated by the City of Camas, Washington State Department of
Ecology, and the US Army Corps of Engineers ...Simply clear cutting trees and
vegetation is not an option. As we discussed, removal of blackberries and other
invasive species is allowed, but heavy equipment cannot enter the wetland area to
remove blackberries, as they will damage the wetlands vegetation.
Attachment 4 at 2. The Washington State Department of Ecology also issued a letter support
ing
the City's position that most vegetation within the Biofilter's wetlands cannot be removed or
harvested absent a new permit and that a permit likely would not be issued or approved by
Ecology.
The HOA did not subsequently submit an application to maintain the Biofilter, nor did it
proceed with maintenance activities. Meanwhile, the Biofilter continued deteriorating. In 2018, a
wastewater expert collected water samples at the inlets and outlets of the Biofilter and had them
tested for chemical oxygen demand. These tests demonstrated that the outlets of the Biofilter had
lower water quality compared to the inlets. Attachment 5 at 5-6.2 In December 2019 and May
2020, the City tested the stormwater runoff from the Biofilter, selecting two locations
downstream of the Biofilter's two outlets for sampling. These tests demonstrated water exiting
z See also Appendix H to Att
achment 5, at:
https://lacamasshoresbiofilter.org/uploads/1 /2/2/5/122588755/appendix_h_2018_cod.pdf
Lacamas Shores Homeowners Association
City of Camas -6-
August 12, 2021
the Biofilter had elevated and noncompliant levels of phosphorus, total suspended solids, and
dissolved inorganic chemicals.' Id. at 5-7.4
In 2020, concerned citizens, including a retired botanist and university professor,
investigated water quality conditions of the water that was discharged from the Biofilter into the
naturally -occurring forested wetlands adjacent to Lacamas Lake. They analyzed whether the
Biofilter was meeting the compliance standards established in the Shoreline Permit, comparing
water quality parameters at the Biofilter's inlets to the same parameters at the outlets. The
abstract of their report summarizes their analysis and results as follows:
In 2020, Lacamas Lake tested positive for harmful algae toxins 26 out of 29 times
between April and October. The harmful algae blooms occurred along the
southwest shoreline of Lacamas Lake, three-quarters of which is bordered by the
Lacamas Shores neighborhood. Stormwater samples taken September 2020 in the
Biofilter and the adjacent shoreline wetlands were tested for the three water quality
parameters shown to be of concern in recent tests. Those three parameters are total
phosphorus µg/L ("TP"), total suspended solids µg/L ("TSS") and conductivity
uS/cm. The results indicated that the water coming into the Biofilter had better
water quality values than the water discharged. The Biofilter was unable to slow
the flow of water coming through the drainage system. Under fast flowing/high-
volume conditions, the results for TP, TSS and conductivity at the outlets were
elevated above inlet conditions. Those elevated concentrations put the stormwater
outlets well over the compliance levels for those water quality parameters. By
comparing the 1990 results with current results, we see that inlet/incoming
concentrations are little changed; the efficiency of the Biofilter today is degraded.
Attachment 5 at 1.
Samples were collected on September 23, 2020 of water flowing into the Biofilter and
then discharging into Lacamas Lake via two outlets. The samples were delivered to Columbia
Laboratories for analysis and testing according to the three parameters that were non-compliant
in testing from 2019 and earlier in 2020: TP, TSS, and dissolved inorganic chemicals. Id. at 7.
Sample results are provided in Figure 3 of the report, showing higher levels for the three
parameters in the outlets (L 1, L2, S2, and S4) compared to the inlets (B 1 and B2).
s Dissolved inorganic chemicals are measured by conductivity.
a One sampling location had severely high total phosphorus and total suspended sediment levels for the December,
2019 test, and conductivity was extremely high for both locations in the May 2020 test. Total phosphorus was higher
in all tests (over 68 micrograms/L) than the EPA standard (50). See also Appendices I and J to Attachment 5, at:
https://Iacamasshoresbiofilter.ora/unloads/l/2/2/5/122588755/v9lO4l9 I final 01 13 2020 1804.ndf and
https://lacamasshoresbiofilter.org/uploads/ 1 /2/2/5/ 122588755/vde0400_ I _final _06_ 11
_2020_0947.pdf
Lacamas Shores Homeowners Association
City of Camas -7- August 12, 2021
Table 3. Sample Information and Results (listed chronologically)
Channel coming out of the
lakeside (N) of west bridge
COMPLIANCE POINT
Channel downstream of S2 be-
fore reaching the Lake -
City sample location for
Dec 2019 and May 2020
Channel before entering east
bridgefi (S) COMPLIANCE POINT
'Indicates that the reading is higher than any reading taken at that location, including since 1988.
Id. at 11. As further discussed and demonstrated in the report, this contrasts with earlier analyses
of the Biofilter from the 1990s, where the water quality had fewer pollutants at the Biofilter's
outlets compared to its inlets. Id. at 14.
These results demonstrate that the HOA's lack of maintenance of the Biofilter, caused at
least in part by the City's prohibition of the HOA's legal obligation to conduct that maintenance,
has transformed the Biofilter from a system that removes pollutants into a system that actually
adds pollutants—including phosphorus, suspended solids, and dissolved inorganic chemicals—to
Lacamas Lake and the naturally occurring forested wetlands that abut it. As such, the Biofilter is
further degrading a system that is already stressed, and it is likely contributing to human health
concerns associated with Lacamas Lake and impairing the beneficial uses of this important
resource. Indeed, in 2020, public health officials were forced to pose danger signs at public
access points to Lacamas Lake and advise against recreational use of the lake after water samples
revealed cyanotoxins above the threshold levels recommended by the Washington Department of
Lacamas Shores Homeowners Association
City of Camas -8- August 12, 2021
Health.s Health officials were forced to issue warnings of elevated cyanotoxins again in August
2021, recommending the public not swim or water ski in the lake, drink lake water, or allow
animals to contact the water.6 Blooms of cyanobacteria, also known as blue-green algae, can
pose a significant health risk if the cyanobacteria or toxins are ingested, inhaled or come into
contact with skin. Algae blooms are frequently caused by excess nutrients, including phosphorus
and other biological materials, that are loaded into the aquatic environment from anthropogenic
sources.
As detailed in the following paragraphs, these discharges of pollutants are ongoing,
illegal, and in violation of Sections 301(a) and 402 of the Clean Water Act, because they
constitute (1) discharges of pollutants (2) into navigable waters (3) from a point source (4)
without a discharge permit. Comm. to Save Mokelumne River, 13 F.3d at 309.
"Discharge of a pollutant" is defined as " (A) any addition of any pollutant to navigable
waters from any point source, (B) any addition of any pollutant to the waters of the contiguous
zone or the ocean from any point source other than a vessel or other floating craft." 33 U.S.C. §
1362(12). "Pollutant" is defined as "dredged spoil, solid waste, incinerator residue, sewage,
garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive materials,
heat, wrecked or discarded equipment, rock, sand, cellar dirt and industrial, municipal, and
agricultural waste discharged into water." 33 U.S.C. § 1362(6). As set forth above, the Biofilter
is adding, and hence discharging, pollutants in the form of biological materials and chemical
wastes, including phosphorus, suspended solids, and dissolved inorganic chemicals, into the
naturally occurring wetlands adjacent to the Biofilter, and then into Lacamas Lake. These
discharges are occurring at the Biofilter's two outfalls.? Lacamas Lake and the adjoining natural
wetlands are navigable waters. 33 U.S.C. § 1362(7); 40 C.F.R. §120.2. These discharges are
occurring through two outlets that are artificially designed, each of which is a point source. 33
U.S.C. § 1362(14) (defining "point source" as "any discernible, confined and discrete
conveyance, including but not limited to any pipe, ditch, channel, tunnel, conduit, well, discrete
fissure, container, rolling stock, concentrated animal feeding operation, or vessel or other
floating craft, from which pollutants are or may be discharged").
These discharges are not authorized by a NPDES or other type of approval listed in
Section 301(a), nor are they exempt from permitting requirements. Importantly, while some
discharges that are composed entirely of stormwater need not obtain a NPDES permit pursuant to
33 U.S.C. § 1342(p), this exception does not apply here. Even if all of the water that entered the
Biofilter's wetlands were composed entirely of stormwater, the Biofilter treatment facility is
adding pollutants to this water. As described above, these pollutants are being added because the
Biofilter has fallen into disrepair through lack of maintenance, causing phosphorus and other
pollutants to enter into the water at the Biofilter. These pollutants are not "storm water," which is
defined as "storm water runoff, snow melt runoff, and surface runoff and drainage." 40 C.F.R. §
s https://www.clarkcountytoday.com/community_news/dark-county-public-health-closes-Lacamas-lake-and-round-
lake-due-to-elevated-toxin-levels/
6 https://www.clarkcountytoday.com/news/public-health-issues-warning-for-lacamas-round-lakes-due-to-elevated-
toxin-levels/
The specific location of the outfalls are described and illustrated in Attachment 5 and Appendices A -C to that
attachment.
Lacamas Shores Homeowners Association
City of Camas -9- August 12, 2021
122.26(b)(13). Accordingly, the water that is polluted by the Biofilter's wetlands and discharged
through its outlets is not "composed entirely of stormwater." Residents Against Indus. Landfill
Expansion v. Diversified Sys., Inc., 804 F. Supp. 1036, 1038 (E.D. Tenn. 1992) (33 C.F.R. §
1342(p) does not apply where two ponds store stormwater that contains pollutants from a
landfill). Cf. Wisconsin Res. Prot. Council, Ctr. for Biological Diversity v. Flambeau Min. Co.,
903 F. Supp. 2d 690, 712 (W.D. Wis. 2012) (even if water entering a biofilter does not have
elevated levels of pollutants, a discharge violation occurs when there is evidence that the biofilter
itself is adding pollutants).
Both the HOA and the City are liable for the unlawful pollutant discharges. Section 301
broadly prohibits the unauthorized discharge of a pollutant by any person. 33 U.S.C. § 1311(a).
Any person may be liable under Section 301(a), even if they do not actually cause a discharge,
provided that they possess sufficient control over the facility and knowledge of the alleged
violations. Puget Soundkeeper All. v. Cruise Terminals ofAm., LLC, 216 F. Supp. 3d 1198, 1223
W.D. Wash. 2015). The HOA owns the property on which the Biofilter is located, Clark County
Fax Lot 84839000, and it is responsible for monitoring and maintaining the storm drainage
system under the Shoreline Permit. Attachment 3, Condition 12. The City is also liable by
exercising sufficient control over the Biofilter. Specifically, the City has directed the HOA to not
conduct routine maintenance of the Biofilter without obtaining new permits, stated that it would
not be able to obtain permits for routine maintenance activities (e.g., cutting trees and vegetation)
and threatened "full code enforcement proceedings can and will take place including possible
criminal charges for knowingly and willfully working without approvals." Attachment 4 at 2.
Accordingly, the City has exercised direct control over maintenance of the Biofilter and, along
with the HOA, is liable under Section 301(a).
Further, the HOA and the City have been on notice of these violations for years. As
discussed above, the HOA was concerned about the failing Biofilter in 2016 and approached the
City about the need to maintain the Biofilter to protect the water quality of Lacamas Lake. The
City indicated additional permits would be needed to maintain the Biofilter, but the HOA did not
pursue such permits or conduct the maintenance. Attachment 4 at 2.8 The Biofilter continued to
deteriorate, and in 2018 a wastewater expert collected water samples demonstrating water quality
was lower downstream of the Biofilter's outlets compared to its inlets. Attachment 5 at 5-6. Also
in 2018, the HOA's environmental consultant notified the HOA that the bubbler systems leading
to the Biofilter appeared to be failing such that untreated stormwater was being discharged
Erectly to the lake in violation of permit conditions. Attachment 6. In response to these
numerous concerns, the City conducted tests in 2019 and 2020, which confirmed the Biofilter
appeared to be failing and adding pollutants to Lacamas Lake. Supra at 5; Attachment 5 at 5-7.
During this period, the wastewater expert who conducted the 2018 tests provided comments to
the City Council, stating that the Biofilter was adding pollutants to the lake, in violation of
permit conditions, and endangering public health and safety. Attachment 7. Despite this notice
and knowledge about the Biofilter's pollutant discharges, the HOA and the City have failed to
cease these illegal discharges or seek a Clean Water Act permit to authorize them.
$ Given the Biofilter was required to be developed as a condition of the Shoreline Permit and is a permitted
treatment facility, additional permits are not required to conduct routine maintenance. Camas Municipal Code
16.S1.100.A.3; CMC 16.53.O10.C.2.b; Camas Shoreline Master Program ("SMP") Section 1.9.5; SMP
Chapter 7, Definition #190.
Lacamas Shores Homeowners Association
City of Camas 40- August 12, 2021
Finally, while the Department of Ecology issued a letter supporting the City's position
that the Biofilter should not be maintained, this does not absolve the HOA or the City from these
Clean Water Act violations. The Clean Water Act is a strict liability statute, and Ecology's
position that the Biofilter need not be maintained to prevent these violations is not a defense to
the HOA's and the City's liability. Ass'n to Protect Hammersley, Eld, & Totten Inlets v. Taylor
Res., Inc., 299 F.3d 1007, 1015 (9th Cir. 2002) (Ecology's position that a NPDES permit is not
needed for an alleged discharge violation is not a defense, and Ecology is not a necessary party
to a citizen suit). See also Olympic Forest Coal. v. Coast Seafoods Co., 884 F.3d 901, 909 (9th
Cir. 2018) (holding that a NPDES permit is required for operation of a hatchery despite
Ecology's earlier determination that a permit is not required); Wisconsin Res. Prot. Council, Ctr.
for Biological Diversity, 903 F. Supp. 2d at 707-710 (NPDES permitting agency is not an
indispensable party).
II. PARTY GIVING NOTICE
The name, address, and contact information for the party giving notice is:
Steven D. Bang
2701 NW Lacamas Dr.
Camas, WA 98607
Email: stevendbanana.comcast.net
Phone: (360) 991-5196
III. COUNSEL FOR STEVEN D. BANG
Steven D. Bang is represented by:
Samuel W. (Billy) Plauche
Jesse DeNike
Plauche & Carr LLP
1218 3rd Avenue, Suite 2000
Seattle, WA 98101
Email: billykplauchecarr.com
iesse a.nlauchecarr.com
Phone: (206) 5884
188
IV. INTENT TO SUE AT CONCLUSION OF 60 -DAY NOTICE PERIOD
The violations described in this notice of intent to sue are ongoing and violate Sections
301(a) and 402 of the Clean Water Act. Steven D. Bang intends to file a lawsuit against the HOA
and the City of Camas pursuant to 33 U.S.C. § 1365 at the conclusion of the 60 -day notice
period. Steven D. Bang intends to sue for all of the above-described violations, including the
discharge of phosphorus, suspended solids, and dissolved inorganic chemicals from both of the
Biofilter's outfalls, along with any and all other pollutants from the Biofilter into the naturally
occurring shoreline wetlands and/or Lacamas Lake. Steven D. Bang also intends to sue for any
Lacamas Shores Homeowners Association
City of Camas -11-
August 12, 2021
and all other violations yet to be discovered or committed after the date of this notice. Each
violation subjects the violator to a penalty of up to $54,460 per day. Violations of different
parameters at the same outfall are counted separately, and violations of the same parameter at
different outfalls are counted separately. Steven D. Bang will also seek injunctive relief to
prevent further violations and such other relief as permitted by law, including but not limited to
recovery of Steven D. Bang's attorney fees.
Steven D. Bang is willing to discuss settlement and remedies for the violations described
in this letter during the 60 -day notice period. If you are interested in discussing settlement, please
contact our office within 14 days of receiving this letter to initiate discussions. Steven D. Bang
does not intend to delay the filing of a complaint even if discussions are ongoing when the 60 -
day notice period ends.
Respectfully,
Samuel W. (Billy) Plauche
Jesse DeNike
cc: Michael S. Regan, Administrator, U.S. Environmental Protection Agency
Michelle Pirzadeh, Acting Region 10 Administrator, U.S. Environmental Protection
Agency
Laura Watson, Director, Washington State Department of Ecology
CERTIFICATE OF SERVICE
I hereby certify that on August 12th, 2021, I caused a true and correct copy of the
foregoing Notice of Intent to File Suit under the Clean Water Act to be served upon the parties
herein by U.S. Postal Service, postage prepaid, via certified mail, return receipt requested:
DATED: August 12th, 2021.
s/Sarah Fauntleroy
Sarah Fauntleroy, Legal Assistant
Donald Trost, President
Lacamas Shores Homeowners Association
2421 NW Lacamas Drive
Camas, WA 98607
Managing Agent
Lacamas Shores Homeowners Association
12503 SE Mill Plain Blvd., Suite 260
Vancouver, WA 986844008
Registered Agent
Lacamas Shores Homeowners Association
12503 SE Mill Plain Blvd., Suite 260
Vancouver, WA 986844008
Ellen Burton, Mayor
Office of the Mayor
City Hall
616 NE 4th Avenue
Camas, WA 98607
Lacamas Shores Homeowners Association
P.O. Box 751
Camas, WA 98607
Michael S. Regan, Administrator
U.S. Environmental Protection Agency
1200 Pennsylvania Ave., N.W., Mail Code 1101A
Washington, D.C. 20460
Michelle Pirzadeh, Acting Region 10 Administrator
U.S. Environmental Protection Agency
1200 Sixth Ave, Suite 155
Seattle, WA 98101
Laura Watson, Director
Washington State Department of Ecology
P.O. Box 47600
Olympia, WA 98504-7600
Attachment 1
Draft Environmental Impact Statement
(LacamasShores)
1"�ove�nber,1987
Prepared for the City of Camas, Washington
Submitted by The White Company
DRAFT
rNVIEtONMENTAL IMPACT STATEMENT
Progosed Residential Development between Lake iioad and
I,acamas Lake in Cantas, Washington
September, 1987
Lead Agency:
City of
Camas
Prepared By:
The White Company
101 E. 8th street
Vancouver, Washington 98660
(206) 696-1338
CONTENTS
FACTSHEET ....................................................... i
REFERENCETO PRIOR EIS {FOREWORD} ................................ iii
SUMMARY.......................................................... 1
DESCRIPTIONOF PROPOSAL .......................................... 7
EXISTING CONDITIONS, IMPACTS OF THE PROPOSAL, AND MITIGATIVE
MEASURES..........................................................
Introduction.........:......................................... 13
Elements of Environmental Impact Requiring Further Analysis..
Erosion/Storm Run-oFf Control .............................. 14
Public Access to Lacamas Lakes 6 * 4 0 w 0 a 9 a 0 0 9 4 0 0 4 * 0 * 8 * 0 a* & 6 a a 9
21
Flood Plain Consideratinns................................. 28
Wetlandlintermittent .Streams ............................... 39
Slope Stability ............................................ 37
Traffic Impacts ............................................ 90
ALTERNATTVES...................................................... 50
APPENDICES........................................................
Draft EIS Distribution List ................................
WetlandAnalysis ...........................................
Geotechnical Study ........................................•
FACT SHEET
pR4pONENT: Tom Shiplez
c/o Vanport Manufacturing, Inc.
P006 Box 97
Boring, Oregon 97009
NATURE OF Development of a 261 -unit single family
PROPOSAL: subdivision and a 550 -bed congregate care center/
120 -bed nursing home on selected portions of 174
acres of land.
LOCATION OF The project site lies k�etween Lake Road on the
PROJECT: south and Lacamas Lake on the north in Camas,
Washington. The 174 -acre parcel runs northwest
and southeast from an approximate midpoint: of
S.E. 237th Ave.
LEAD AGENCY: City of Camas, Washington
RESPONSIBLE Mel Avery
OFFICIAL TO DirectoY of Public Works
WHOM COMMENTS City of Camas
MAY BE SENT: City Hall
Camas, Washington 98607
PFtEpAi2ED BY • The White Company
101 East 8th Street
Suite 140
Vancouver, Washington 98660
In association with
MacKay a Sposito, Civil Engineers
110 East 17th Street
Vancouver, Washington 98660
PRINCIPAL Dorothy Anderson, The White Company
AUTHORS: Dick Sposito, Mackay & Sposito
John D. White, The Wh1te Company
i
REQUTRLD
I, ICENSESIAPPROVALS/
PERMITS:
LOCATION OF
BACKGROUND
INFORMATIONO
COST OF COPIES:
PUBLIC HEARINGS:
DATE OF ISSUE:
DEADLINE EOR
COMMEN'PS
City of Camas
Shorelines Conditional
Use
Shorelines Substantial
Subdivision Approval
Grading Permits
Building Permits
Conditional Use Under
Zoning
Permit
Development permit
Ordinance
t���hng�n Ste, a Department of 'Ecaloax
Shorelines Management Permit
ashingtorM Department of Wi��.i e
Hydraulics Permit
Section 404 Permit
City of Camas
Intergovernmental Resource Center
The White Company
December 17, 1987
November 16, 1987
December 15, 1987
ii
DESGRIr a %W (lF PROPQSAL
Pre�i£_rt lTistory
Tn 1982, Mr. Tom Shipley. proposed and received annexation of his
property to the City of Camas. Mr. Shipler's property was annexed
tion, whose
jointly with the properties of Crown-Zellerbach Corpoxa
holdings were, at that time, contiguous to the city limits, and with
Mr. Ruben Bafus who owned property adjacent to Mr. Shipler. The total
amount of property annexed as a result of the 1982 proposal consisted
of 853 acres in area and was situated one mile northwest of the city
limits.
The EIS submitted in 1982 to meet the SEPA xequirernertts for the
annexation proposal was based upon a conceptual plan for the
development of Mx. Shipler's property. The conceptual plan included a
site analysis of the physical elements, a general layout, and an
analysis of potential traffic circulation patterns and impact:;. This
proposed site plan was designed to include 1,140 dwelling units on a
total 270 acre tract (4.2 units -acre), much more extensive than what is
proposed under the current plan.
'Phe original development design has since been refined to reduce the
adverse environmental impacts. Modifications to the original
conceptual plan which are more environmentally sound include:
(a)
Reduction in the average density of the single family
•- page 7
residential development from 4.1 units -acre to 2.8 units -acre.
(b) Reduction in traffic generation/circulation problems due to the
reduction in density and to the replacement of 26 acres
designated as a medium density subdivision with a 550 bed
congregate care center and 120 -bed nursing home.
{c) Engineering designs have been modified to address the erasion
and run-off issues in a source -specific manner, and to enhance
the naturai functions of ttte wetland on the property, allowing
it to Function in a manner similar to biological filtration
system.
(d) Designation of 38.5 acres of the pro3ect site as open space, to
include a 16 -acre city park, a 6.5�acre natural wetland, and a
pedestrian trail along the shoreline of the entire property.
The sub�ect proposal is known as the "I�acamas Shares".
The sponsor of this action is Mr. Tom Shlplez.
The pro3ect site is located in 5E Clark County, Washington, within the
city limits of Camas, Washington, between S.E. Lake Road and the
- page 8 -
Impacts:
The soils are characterized as fine-grained, and, in those areas of
steep topography, can present an erosion potential during development.
Because of the site's proximity to Lacamas Lake, the fine-grained soils
and some steep slopes, careful planning and a thoughtful execution of
the planning is necessary if development of the site is to occur
without degradation of the Lake's water quality.
Mitigating Measures:
'Phe following Storm Drainage and Erosian Control Plan is a guide to the
location and size of storm drainage improvements, and measures
recommended to control erosion on the Shipley property. 'These measures
include methods far controlling erosion during the construction of site
improvernents, during building construction, and on a long term basis
after construction has been completed.
The proposed storm drainage systern fox the 5hipler property was
designed to minimize outfall locations along Lacamas Lake, Runoff
flaw
rates for each outfall location were then determined using the HEC -1
Flood Hydrograph Package developed by the U.S. Army Corps of Engineers
Hydrologic Engineering Center. (See
Table 2).
Sedimentation ponds to settle sediments transported by storm water were
determined to be unfeasible for the 5hipler property. 13ecduse of the
- page 15 -
topography of the property, six storm outfalls to Lacamas Lake are
required. Each of these would require a sedimentation pond. The
ground slope at most of the outfall locations is too steep to construct
a sedimentation pond. If ponds were located in more favorable terrain,
a significant percentage of the property couldn't discharge storm
runoff into the sedimentation ponds, and could only discharge directly
into Lacamas Lake. For this reason, and for reasons of safety,
maintenance, and necessarily large pond volumes required, sedimentation
ponds are unfeasible and athex measures are required.
Two types of outfalls are proposed £or the storm system discharging
into Lacamas Lake. The first outfall will be located in existing
wetland areas adjacent to the lake. This type of outfall consists of
several hundred feet of perforated pipe in a shallow drain rock trench
parallel to the contours in the wetlands (
See detail C). This outfall
acts as a bubbler and releases water
at velocities considerably less
than the eroding velocities of the soils in th
e area. This outfall
also recharges the wetlands area with a supply of water. The second
type of
outfall is a bubbler structure constructed below the water
surface of Lacamas Lake. This bubbler structure will be constructed in
areas where the terrain adjacent to the lake is steep and impractical
for the perforated pipe outfall (See detail F). Releasing runoff
through bubbler structures under the water surface will eliminate the
erosion caused by water leaving an outfall and traveling overland to
the lake.
- page 16 -
Existing Conditions:
fihe topographic nature of the project site is characterized by a series
of benches separated by areas of steep slope. The lower bench, which
Lies immediately adjacent to the shoreline in the central portion of
the project site, maintains the hydrology, vegetation, and soils of a
palustrine forested wetland, as defined by the U.S. fish and Wildlife
Service.
The proponent wished to design a proposal which would avoid
construction or fill of any kind in this wetland. It was therefore
necessary to determine a definitive wetland boundary prior to
developing the site plan. The biological consulting firm of Shapiro &
Associates, experienced in wetland boundary delineation, was retained
to identify and flag the wetland
boundary lees Appendix B).
'Phe mayor partian of the wetland is below the elevation level of 190
feet, and is characterized as a mixed forested/shrub swamp with some
marsh habitat (Shapiro & Associates). Wetland soils and vegetation have
developed in this areas as a result of seeps and streams flowing off
the upland slopes, rather than fluctuations in the lake level..
A number of intermittent streams feed the portion of the wetland
adJ
acent to the lake. These streams originate at the base of a steep
- page 34 -
Appendix
WETLAND DELINEATION OF
SHIPLER pROPERTY ON LACAHAS LAKE
IN
CAMAS, WASHINGTON
prepared by
Hann E. Boole'
Shapiro an8 Associates, Inc.
September 28, 1987
INTRODUCTION AND SITE DESCRIPTION
A wetland delineation study was conducted for property located on the
northwest shoreline of Lacamas Lake in Camas, Washington.The study wetland
entailed a site visit to identify wetland habitat types9
boundary as defined by the Corps of Engineers for their Section 404 Program.
Wetland habitat types were identified based on vegetation communities,
general soil characteristics and hydrology. Due to abrupt changes in
vegetation, soils and/or topography, there is a rather distinctive character
of the wetlands on the site. As a result, a detailed study described by the
Corps as the "Triple Parameter Approach", was not conducted. This report
provides a description of the wetlands and uplands habitats identified on
the site. Following the field work, the wetland delineation was located on
a detailed site survey by the firm of MacKay and Sposito.
The Shipler property is a 179 -acre parcel located adjacent to Lacamas
Lake, and varying in elevation from approximately 180 feet above sea level
at the lake shore to about 350 feet at its highest point. The site consists
of a series of terraces or benches separated by areas of steep slopes.
Several seeps and small stream channels flow off these slopes and across the
benches. On the steep slopes these seeps and stream channels are narrow
(usually
theebenches,5feet in often it spdreadsand
intowell
wide�and�mucheJessWhre the
flows
defined
a
channel.
WETLAND HABITATS
The major portion -
narrow bench immediately adjacent to the lake shore, and can be
characterized as a mixed forested/shrub swamp with some marsh habitat.
Based on the US Fish and Wildlife Service classification of wetlands
(Cowardin et. al., 1979) the following three wetland types were identified:
- Palustrine, forested broad-leaved deciduous
Palustrine, scrub/shrub
Palustrine, emergent, persistent5 4F
Most of this wetland is found at an elevation below 190 feet, and
as hough actually
fedfbitis within the numeroushe I seepscandtstreamseflowing offeOfmthe steep
is actua y Y
slopes.
A second bench is located between 190 to 200 feet in elevation. As
comes
noted above, the flow channel broadens as it reaches the bench,
and wide and ill-defined. Due to the broad dispersion of flow through these
areas they support wetland and riparian communities up to several hundred
feet in width. The wetland communities on this bench would be classified
as;
- Palustrine scrub/shrub
- Palustrine emergent.
The communities are similar to those identified on the previous page,
but lack the associated forest component. The communities occurring on the
subject property are described below.
Palustrine forested. The forested swamp adjacent to the lake shore is
dominated by Oregon asfi (Fraxinus latifolia), with a shrub understory of
red -osier dogwood (Cornus stolonifera) and salmonberry (Kobus s ectabilis).
Some willow (Salix spp.),vine maple (Acer circinatum), a+ n� red a der A nus
rubra) are also present. Due to the dense overstory of forest and shrub,
there is little groundcover, however, where it is present it consists of
small patches of slough sedge (Carex obnupta)•
Palustrine scrub/shrub* the shrub swamp portion of this wetland is
very similar in character, although there is no Oregon ash component.
Rather the community is dominated by red -osier dogwood, salmonberry and
willow. Slough sedge and lady -fern (Athyrium filix-femina) ofen are present
in the understory.
Palustrine emergent. Where the wetland is characterized arsh it is
as m
dominated by slough sedge, lady -fern, and patches of Pacific water -parsley
(Oenanthe sarmentosa). Skunk cabbage L ssi_cchh_i_tuumm americanum) also was
noted. in these areas the soils are extremely mucky and often show evidence
of standing water.
At an elevation of about 200 feet, three distinct streams flow off, or
seep out of the base of the steep slope. The shrub swamp wetlands
associated with these areas are similar to those described above.
Generally, these areas are generally characterized by willows, red -osier
dogwoods and occasional scattered Oregon ash. The emergent marsh along
these streams consists of different communities than along the lake shore.
Reed canarygrass (Phalaris arundinacea) and soft rush (Juncus effusus) are
common groundcover species•aid(Typha latifoliaj ani sma - rusted
bulrush (Scir us macrocarpus) are locally dominant, and in some places form
monotypic s an s.
UPLAND HABITATS
Uplands adjacent to the shrub swamp are characterized as mixed forest,
with Oregon ash, Western red cedar (Thuja Licata), red alder, Douglas fir
(Pseudotsu a menziesii) and big -leaf maple Acer macro h llum) dominating
t e overstory. A though oceanspray (Holodiscus discolor and wild rose (Rosa
sp.) may be found in the understory, IIIIIT is most y ominated by blackberries
(Rubus discolor and R. laciniatus).
On the upper bench, the upland habitats are dominated by grasslands,
with orchard grass (pact lus glomerata), fescue (Festuca spp.) and thistles
(Cirsium sp) being the most common species. Bracken fern (Pteridium
aqui Unum) and Pacific dewberry (Rubusursinus) also are present.
In conclusion, wetlands on the site are characterized as a mixture of
forested and shrub swamp and emergent marsh. Most of the wetland habitats
appear to be supported not by the lake, but seepage and perennial streams
flowing from the higher portions of the property. None the less, all of
these wetlands are most probably under the jurisdiction of the Corps of
Engineers Section 404 process. ..
Attachment 2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
BEFORE TE3E SHORELINE HEARINGS BOARD
IN THE STATE OF WASHINGTON
CITIZENS TO SAVE; LACAMAS LAKE,
Appellants,
v.
CITY OF CAMAS, VANPORT
MANUFACTURING,
Respondents.
CITIZENS TO SAVE LACAMAS LAKE,
Appellants,
v.
STATE OF WASHINGTON,
DEPARTMENT OF ECOLOGY,
Respondents,
No. SHE3 88-33
AGREED ORDER OF REMAND
COMES NOW the parties t.o the above action and enter into this
Agreed Order of Remand under which it is mutually agreed that the
Substantial Development Permit {City of Camas Permit No. 2 -87} -and
Shoreline Conditional Use Permit {Camas Permit No. 590-14-7806}
shall be remanded to the City of Camas to be reissued with the
following instructions:
1. Provided that the necessary permits are issued, Vanport
Manufacturing, Inc. (the "Developer")
, agrees to complete by
January 1, 1990, the
construction of the public pedestrian trail
Located
over the entire length of the project's shoreline, including
the portion on the city park property donated by the Developer, all
AGREED ORDER OF REMAND Z
SHB 88-33
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
as depicted as the "public Pedestrian trail" in the site plan
attached hereto and made a part hereof as Exhibit A. If permitting
problems arise, the Developer agrees to gently pursue obtaining
said permits.
2. The Developer agrees to provide a letter of credit to the
City of Camas to assure completion of the public pedestrian trail.
Such financial assurance shall be in an amount agreed upon by the
City of Camas and the Developer, and may be in the form of a
decreasing term and revolving letter of credit based upon the portion
of the trail yet to be completed.
3. The Developer agrees to dedicate in fee to the City of Camas,
should they accept it, a 300 -fact conservancy zone along the
shoreline of the development, excepting that portion of the con-
servancy zone which enters the wetland ar the private access areas.
This property is designated in Exhibit A as the "conservancy zone."
The homeowner's
association formed in the development shall continue
to maintain the public pedestrian trail in perpetuity except that
portion of the trail located in the city park.
4. The Developer agrees to commit a portion of the property
now reserved for
potential wetland use to be developed immediately
as part of the man-made_ wetlands created as part of the biofilter
storm drainage system on the project. This additional property is
depicted as the "newly -created wetlands" on the site plan attached
as Exhibit A. These newly -created wetlands and all other wetlands
and land reserved for potential future wetlands shall continue to be
AGREED ORDER OF REMAND 2
SHB S$-33
L
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
governed by the conditions and monitoring program set forth in the
existing permit conditions.
5. In consideration for the additional acreage contributed to
the man-made wetlands, the Developer shall have the right to recon-
figure the lots in the existing site plan to obtain up to 21.8
residential. lots in the development.
6. The water quality monitoring and contingency program
contained within the existing permit conditions shall continue for
the Longer of five years commencing the date of the reissuance of
the Substantial Development Permit and Conditional Use Permit or
untF
l such time that 75� of the lots depicted as "Lots within
biofilter drainage" o.n Exhibit A are developed.
7. The Developer and homeowner's association shall allow the
members of the public to access the public trail through the private
access designated as the "private access/permitted public access"
in Exhibit A. The public shall be allowed access through this
private access so long as such use does not contribute to such
increased traffic, parking, congestion, vandalism or other nuisance
that contributes an unreasonable- interference with the quiet enjoyment
of the homeowners residing in the development. Any signatory to
this Order shall
have the right to petition the City of Camas to
present evidence Haat the public access is contributing to the
disruption of the quiet enjoyment of the homeowners. Upon a finding
by the City that the public access has contributed to an unreasonable
AGREED ORDER OF REMAND 3
SHB 8$-33
1
2
3
4
5
s
7
s
9
10
11
12
13
14
15
I6
17
18
19
20
21
22
23
24
25
26
27
f
disruption of quiet enjoyment, the homeowner's association sha11
have the right to restrict further access to the public as deemed
appropriate by the City of Camas ar the Department of Ecology.
Should any party to this Order be dissatisfied with the decision of
the City of Camas, that party may petition the Department of Ecology,
whose decision shall be final. In no event sha11 this private
access be accessible to members of the public before dawn or after
a��k.
$. The Developer, the Department of Ecology, and the appellants
shall. agree on a mutual press release which shall contain. the factual
circumstances surrounding the settlement and dismissal of this matter.
WHEREFORE, .by agreement of all the parties, IT YS ORDERED
that this matter be remanded to the City of Camas and that the City
shall reissue the Substantial Development Permit and Conditional Use
Permit cited above as modified by the foregoing, the entry hereto
establishes th.e approval by the Department of Ecology of the Con-
ditional Use Permit as modified. The reissuance by the City of Gamas
will result in permits within the scope and intent of the application
and will not require further public hearings as the remand follows
solely from this Order.
As a xesult of this Order appellants agree that the appeal of
this matter and all rights pertaining to it are dismissed with
prejudice.
AGREED ORDER OF REMAND 4
SHB 88--33
1
2
3
4
5
6
7
6
9
10
11
12
13
14
15
1.6
17
16
19
20
21
22
23
24
25
26
27
DONE at Lacey, Washington, this lYbe.day of September, 1988,
SHORELINES HEARINGS BOARD
Administrative Appeals Judge
.Presented by:
HELLER, EHRMAN, WHITE & McAULTFFE
Bir �-4--� C.. LA �----
.ilu.an
.e..-O . Moods
Attox'ney fon Def .dant .
Vanp)ort /M nufa g ing
J :: n Karpi s i
Attd n"6v for C.i- zens to Save Lacamas Lake
R ex nape
Atfs�r Ty �r City of CamasBy
A11 n T. Miller
Attorney for Department of Ecology
AGREED ORDER OF REMAND - 5
Attachment 3
SHORELINE MANAGEMENT ACT OF 1971
PERMIT FOR SHORELINE MANAGEMENT SUBSTANTIAL DEVELOPMENT,
CONDITIONAL USE, OR VARIANCE
Application No _ C- 27 R7 Resubmittal
Administering Agency CTTY OF CAMAS
Date Received S,L4!1,IRR -
ApQroved ,� Denied
Date
Type of Action (s)
�^ Substantial Development Permit
x Conditional Use Permit
Variance Permit
Pursuant to chapter 94.58 RCW, a permit is hereby granted/denied
to:
Vanport Manuf acturinq, Inc. P.O. Box 97, Boring, Or. 97009
!� to undertake the following development:
Lakeshore Development
upon the following property:
_,Southwest Shore of Lacamas Lake
within _
associate
wetlands.
and/or its
The project �" �6�/not be within shorelines of state—wide
significance .(RCW 94.58.030}_ The project will be located within
a Consevancy designation. The following master
program provisions are applicable to this development:
Development pursuant to this permit shall be undertaken pursuant
to the following terms and conditions:
`1 This permit is granted pursuant to the Shoreline `lanagement Act
_ / of 1971 and nothing in this permit shall excuse the applicant
from compliance with any other federal, state or local statutes,
L
ordinances or regulations applicable to this project, but not
inconsistent with the Shoreline Management Act (chapter 98.58
RCW) .
This permit may be rescinded pursuant to RCW 96.58.146(8) in the
event the permittee fails to comply with the terms or conditions
hereof.
CONSTRUCTION PURSUANT TO THIS PERMIT WILL NOT BEGIN OR IS NOT
AUTHORIZED UNTIL THIRTY DAYS FROM THE DATE OF FILING, AS DEFINED
IN RCW 96.58.140 (6) AND WAC 173-19-696, OR UNTIL ALL REVIEW
PROCEEDING INITIATED WITHIN THIRTY DAYS FROM THE DATE OF SUCH
FILING HAVE TERMINATED; EXCEPT AS PROVIDED IN RCW
96.58.140 (5) (a} (b) (c) .
6/15/88 �
Date Signature of uthor' ed Local Government Officia
THIS SECTION FOR DEPARTMENT USE ONLY IN REGARD TO A COND;TIONAL
USE OR VARIANCE PERMIT.
Date received by the department
\ Approved Denied
-- .This conditional use/variance permit is approved/denied by the
department pursuant to chapter 90.58 RCW.
Development shall be undertaken pursuan,t.to the following
additional terms and conditions:. y
..�.�
Date
Signature of Authozized Department Official
(Statutory Authority: RCW 96.58.206_ 78-07-011 (Order DE 78-7),
S 173-14-126, filed 6/14/78; Order DE 76=17, S 173-14=126,_filed
7/27/76; Order DE 75-22, S 173-14-126, filed 10/16j75; Order 71-
18, S 173-14-120, filed 12/16/71.)
WS�30:SHORLINE.PMT
EXHIBIT "B"
to
Vanport Manufacturing Shorelines Permit
ADDITIONAL CONDITIONS
The following are imposed -,as additional conditions to the
Substantial Development Permit (City�of Camas - Permmit No. 2-87)
and the Shoreline Conditional Use Permit (Camas Permit No. 590-14-7806)
issued to Vanport Manufacturing. Said conditions result from an
Agreed Order of Remand issued by the Shore Iine..Hearings Board in
Cause No. SHB 88-33.
1. Provided that the necessary permits are issued, Vanport
Manufacturing, Inc. (the "Develop(jr"), shall complete by January
1, 1990, the construction of the public pedestrian trail located
over the entire length of the project's shoreline, including the
portion of the trail on the City park property donated by the
Developer, all as depicted as the "public pedestrian trail" in
the site plan attached hereto and made a part hereof as Exhibit "A".
If permitting problems arise, Developer shall diligently pursue
obtaining such permits.
2. `1'he Developer shall provide a letter of credit to the
City of Camas to assure completion of the public pedestrian trail.
Such financial assurance shall be in'an amount agreed upon by the
City of Camas and the Developer, and may be in the form of a
decreasing term and revolving letter of credit based upon the
portion of the trail yet to be completed.
3. Developer shall dedicate in fee to the City of Camas,
should the City accept it, a.100 foot..cbnservancy__zone along the
shoreline of the development, excepting that portion of the
conservancy zone which enters the wetland or the private access
areas. This property is designated in Exhibit "A" as the
"conservancy_ zone." The homeowner's association formed in the
development shall continue to maintain the public pedestrian trail
in perpetuity, except that portion of the trail located in the
city park.
- 4. The Developer shall commit a portion of the property now
reserved for potential wetland use to be developed immediately
as part of the man-made wetlands created as part of the biofilter
storm drainage system on the project. This additional property
is.depicted as the "newly created wetlands" on the site plan
attached as Exhibit "A". These newly created wetlands and all
other wetlands and land reserved for potential future wetlands
shall continue to be governed by the conditions and monitoring
program set forth in the existing permit conditions.
5: The Developer shall have the right to reconfigure the
lots in the existing site plan to obtain up to X18 residential
lots in the development.
6. The water quality monitoring and contingency program
contained within the existing permit conditions shall continue for
the longer of five (5) years commencing with the date of the
reissuance of the Substantial Development Permit and the Conditional
1)se i� nn Co% -n rn Yf ay.� _ ) i -,'I fts _ ♦i6
the Iucs acpicL :i a . " %ocs u,th.in biofilter dra;_nage" ou L;xht:.bit `A"
are (•cvo..or;ar
i . 'ine Developer uad homeoan?i's association sna. ;_ a ` lou
the meiauccs of t:1e public to access the pu;)
lie trail through the
privat` access c�asi��nated as the "private acces:>��ermitted �;ub.ic
access" In B:aliuit "A". the ni!hI4.c shall be allowed access through
Exhibit "B' - Additional Conditions
Paye 2
this private access so long as such use does not contribute to
such increased traffic, parking, congestion, vandalism or other
nuisance that contributes to an unreasonable interference with__
the quiet enjoyment of the homeowners residin.g.,.in_the develop-
meet. Any signatory--to'-the--Agreed"Order of Remand issued in
Shorelines Hearing Board, Cause No. SHB 88-33 shall have the
right to petition the C-ity of Camas to present evidence that
the public access is contributing to the disruption of the
quiet enjoyment of the homeowners. Upon a finding by the City
that the public access has contributed to an unreasonable dis-
ruption of quiet enjoyment, the homeowner's association shall
have the right to restrict further access to the public as
deemed appropriate by the City of Camas or the Department.of
Ecology. Should any party to the aforedescribed Agreed Order
of Remand be dissatisfied with the decision of the City of Camas,
that party may petition the Department of Ecology, whose decision
shall be final. In no event shall the private access be accessible
to members of the public before dawn or after dusk.
PERMIT CONDITIONS
LAKE SHORE
SHORELINE PERMIT
vanport Manufacturing Inc., developer of the Lacamas Shores
Development, proposes that.the Conditional Use Permit and
Substantial Development Permit for the project be approved with
the conditions set forth below.
I. The developer shall implement the wetlands blofllter -
monitoring program set forth 'in the April 1988 Addendum to
the project Environmental Impact Statement, as amended and
expanded by the May 23, 1988 letter from Dorothy Anderson -to
Nora Jewett, Department of Ecology and the May 25, 1988
letter from Scientific Resources Inc. to Nora Jewett;
2. The developer shall be responsible for. constzucting the
public access trail over the entire length of the property's
shoreline, Including the portion on City park propertyv
3. A11 permits necessary for constructing the parking area and
driveway on the City Park adjacent to the development shall
be obtained by the City of Camas; If the permits hecessary
for constructing the parking area at the City park property
are not forthcoming, alternate parking arrangements shall.be
determined between the city, developer, and Department of
Ecology,
9. Interior access= -
-to the shoreline trail will be provided to
thC residents of LacamaLOP Shores by t)ae addition of up to
flve (5) private access easements;
5. The existing forested wetlands adjacent to the shoreline
should be retained intact as a functioning natural wetland.
The site plan shall delineate this wetland as separate from
the surrounding wetland area.
6. The vegetative surveys described in the monitoring
plan
shall use -permanent transects through the wetlands;
7. Manipulation of'the emergent, wetlands adjacent to and
upslope of the forested wetlands will be allowed should
future monitoring show such a need. Any such wetland
manipulation would require a separate shoreline permit.
Manipulation techniques could involve:
o Replanting�the upper wetland;
o Partial Ellling of drainage conduits between the upper
wetland and the lower forested wetland to slow drainage
Into the lake and Increase retention time;
o Designing the pedestrian trail to function as a berm
between the upper wetland and the lower forested
wetland.
o The developer shall have the option of utilizing an
n
approved sedimentation pond for stor411 treatment if
It is more cost effective than an "expanded" biofilter.
e. The area below the 200—foot elevation adjoining the wetland
area shall be held in reserve for future wetland/detention
area, should the monitoring program demonstrate such a need.
The portion of this reserve area occupied by a road and five
lots shall be designated as the final phase of the.
residential development and shall not be considered for
approval for one year subsequent to Issuance of the
Conditional Use Permit. No construction in this phase shall
occur until monitoring data indicates that the portion of
the reserve area designed for homes will not be needed fox
use as a contingency. ,
9. The following monitoring and contingency criteria developed
by Stan Geiger shall be instigated upon shorelines permit
approval.
a. Set no trigger criteria during the first year but
develop water quality background data as a basis for
negotiating such levels.
11.
b. During the first year, discuss appropriate use of the
background data to produce maximum contaminant levels.
most likely, these will have to use concentration
values (mg l). Develop the "formula" to convert
concentrations into implementation trigger. This will
be done In conJunction with Ecology.
c._ Implement the trigger criteria at the end of the first
year.
The first year of sampling for the monitoring plan shall
include phosphorus sampling in relatively undisturbed small
streams entering the lake;
Creation of a homeowners association which will be
responsible for monitoring and maintaining the storm
drainage system when the developer's responsibility has been
completed. These water quality safeguards will be imposed
either through a homeowners association charter or deed
restriction before c`csnveying title to Lacamas Shores lot
buyers.
13. The portion of the pedestrian trail which traverses
the wetland will be the last portion of the trail to
be constructed. This provision.allows the wetlands
area to be monitored over a longer period of time
and insures that the appropriate contingencies can
be implemented without obstruction. The trail front-
ing the development will therefore not.be complete
until 1995.
14. The developer shall provide reasonable financial
assurance to insure completion of the access trail
fronting the development and not traversing the
wetland area. Such financial assurance shall be in
an amount to be agreed upon by the City and the
developer, and may be in the form of a decreasing
term and revolving letter of credit based upon the
proportion of the trail yet to be completed.
ff Mioijoma
From: Peter Capell <PCapell@cityofcamas.us>
Sent: Friday, August 12, 2016 3:05 PM
To: Ron Boyce
Subject: RE: Follow-up to our meeting of August 4, 2016
Thanks Ron
From: Ron Boyce[mailto:ron@boycefinancialgroup.com]
Sent: Friday, August 12, 2016 2:54 PM
To: Peter Capell
Subject: Re: Follow-up to our meeting of August 4, 2016
Pete,
I appreciate your reply and I am not trying to cause any more bickering but the opposite. I am being approached by
members asking for proof and your email will help me when trying to explain the situation. The homeowners have a lot
at stake with the decreased values on what was once view property and they want there views back ( I am one of those).
Getting the information requested will help the committee when building a maintenance plan for our common area.
I definitely want to keep a good relationship with you and Anita as you are the pathway to helping us get things resolved
for everyone.
I value you friendship and I have always thought of you as a great administrator.
Regards,
Ron
Sent from my iPhone
On Aug 12, 2016, at 12:22 PM, Peter Capell <PCapell cityofcamas.us>tyrote:
Ron,
I was very disappointed by the tone of your email in response to our meeting. You stated in the meeting
that you wanted to end the bickering that has occurred putting the city between two factions of
Lacamas Shores homeowners. The fact that you and other members feel it is not a wetland, does not
matter. The records have shown that it is a wetland and was recently reconfirmed by a site visit from
ecology. The documentation has been provided in the past, and we will pull it out and provide it again.
Currently Anita is busy with two projects. She will go to our archives and retrieve the information, but it
will be late next week.
The original application for the Lacamas Shores subdivision does have wetland delineations that do
place wetlands in what is now the common area. The developer worked to consolidate stormwater
facilities with the wetlands to have an on-site bio -filtration type facility for the area. Wetlands can
change over time, so even if there was land that was once dry, but has become wet it can now be
consider a jurisdictional wetland. It is also important to note that given the proximity of the shoreline
the wetland complex on site is also under shoreline jurisdiction as well.
In terms of burden of proof, the burden absolutely lies with the applicant in this case, which is the
HOA. Camas Municipal Code Chapters 16.51 and 18.55 clearly outline applicable criteria for proposed
actions and require that the burden of proof lies with the applicant. If clearing of the wetland area
commences without permits and approvals from the City of Camas, or any other required jurisdiction
then full code enforcement proceedings can and will take place including possible criminal charges for
knowingly and willfully working without approvals.
Wetlands are regulated by the City of Camas, Washington State Department of Ecology, and the US
Army Corps of Engineers. The scope of work will dictate what type of permits you will need before
commencing any work. The very first step in this process is to prepare a proposal and have a pre -
application meeting with City staff so they can advise on permit specifics and invite other applicable
agencies. At a minimum a full and detailed wetland delineation will be required and a proposal for any
mitigation based on the work proposed. Simply clear cutting trees and vegetation is not an option. As
we discussed, removal of blackberries and other invasive species is allowed, but heavy equipment
cannot enter the wetland area to remove blackberries, as they will damage the wetlands vegetation.
We will make best effort to get the original documentation from the development files before your
meeting on the 22nd. As discussed above the connection of the wetlands that were present at the time
of development to the stormwater facility has caused the wetlands to increase in size, so a wetlands
delineation is going to be necessary, if you choose to do more work than removing blackberries.
Pete
Peter Capell
City Administrator
.image003. jpg>
616 NE 4'h Avenue
Camas, WA 98607
360.834.6864
pcapell@citvofcamas.us
From: Ron Boyce[mailto:ron@boyicefinancialgroup.com]
Sent: Tuesday, August 09, 2016 10:52 AM
To: Peter Capell
Subject: Follow-up to our meeting of August 4, 2016
Pete,
Thanks for the meeting it was very helpful in getting an idea what has been transpiring regarding our
HOA.
You will find I have attached a brief memo regarding issues, questions, concerns and a request for more
information.
2
Ronald C. Boyce, CFP
Boyce Financial Group, LLC.
President/CEO
15597 SE Mill Plain Blvd
Vancouver, WA 98684
office: (360) 695-0981
fax: (360) 6954329
email: ron@boycefinancial(aroLip.com
web: www.boycefmancialgroup..com
By industry regulation we cannot accept orders to execute trades via email or voice mail. If you would like to place a
trade or have time sensitive information for me, please call my office at 360 695-0981. Securities and advisory
services are offered through Cetera Advisor Networks LLC, Member FINRA/SIPC. Cetera Advisor Networks LLC
and Boyce Financial Group, LLC are not affiliated companies.
NOTICE OF PUBLIC DISCLOSiJRE: This e-mail account is public domain. Any
correspondence from or to this e-mail account may be a public record. Accordingly, this e-mail,
in whole or in part may be subject to disclosure pursuant to RCW 42.56, regardless of any claim
of confidentiality or privilege asserted by an external party.
3
Pete,
Thank you again for meeting with me last week and it was very nice to meet Anita
Ashton also.
There are some issues, questions and concerns I have that were raised at the meeting
that I would like clarification on.
The classification of the land in question (open space west of the parking lot
encompassing the soccer field, South of the gravel path on the North side and North of
the gravel path on the South side) as a "wetland" is a very important description or
characterization in determining the type and scope of maintenance that can be done by
the Lacamas Shores HOA on this property.
That said, 1 challenge the classification of this common space that you and Anita
seem to share as a "wetland" classification. In fact, Anita stated in the meeting that it
has always been a wet land and if it was not originally a wetland and is a man-made
wetland it makes no difference as she said "it is still a wetland".
When I shared with you the City of Camas maps (wetland map and open space map)
that clearly shows the area in question is not considered a "wetland" but homeowners
"open space" it was said that a wetland map that shows the area as a "wetland" was
given to Steve Bang and Steve Marrinan. I have talked to both of them and they do not
have such a map.
From my research (City maps, study performed in 1988 for The White Company, and
our own CC&R's) I find the area in question to be part of our HOA common area and
not a "wetland".
Since the Steve's do not have the map that illustrates that the area in question is a
"wetland" and always has been a "wetland", it would be appreciated if you would send
me a copy (or tell me how I might get a copy) of such proof that this area in fact has
been classified as a "wetland" before the next board meeting held Monday August 22nd
Unless the City of Camas can prove that the area in question (not heresy) is a
"Wetland" my recommendation to aur board will be to go ahead and develop a common
area maintenance plan for this area that may involve cutting down trees and using
heavy equipment. It is our duty as homeowners to maintain these common areas per
CC & R's to maintain and enhance the value our property.
The burden of proof is on the city to prove to our HOA that the area in question is a
"wetland" through maps or documentation (no mare Heresy) as our maps and
documents show otherwise. I expect to receive this information before our next board
meeting mentioned above.
I would like to put the controversy to rest regarding this issue and factual documentation
is th e only way this will happen.
Attachment 5
2020 Lacamas Shores Biofilter
Status Report
by Marie Tabata-Callerame and Rodger Hauge
Purpose
1) To investigate the water quality of the stormwater draining from the Lacamas
Shores Biofilter ("Biofilter") into the shoreline wetlands of the Conservancy Zone
of Lacamas Lake.
2) To determine whether the Biofilter is meeting "compliance criteria", i.e., compli-
ance standards set for the site via City permit.
3) To determine the efficiency of Biofilter by comparing water quality parameters at
the inlets against the outlets.
4) To form a shared understanding of the current state of the Biofilter that could al-
low for repair, restoration and/or enhancement of the Biofilter as needed.
Abstract
In 2020, Lacamas Lake tested positive for harmful algae toxins 26 out of 29 times be-
tween April and October. The harmful algae blooms occurred along the southwest
shoreline of Lacamas Lake, three-quarters of which is bordered by the Lacamas Shores
neighborhood. stormwater samples taken September 2020 in the Biofilter and the adja-
cent shoreline wetlands were tested for the three water quality parameters shown to be
of concern in recent tests. Those three parameters are total phosphorus pg/L ("TP"),
total suspended solids Ng/L ("TSS") and conductivity uS/cm. The results indicated that
the water coming into the Biofilter had better water quality values than the water dis-
charged. The Biofilter was unable to slow the flow of water coming through the drain-
age system. Under fast flowing/high-volume conditions, the results for TP, TSS and
conductivity at the outlets were elevated above inlet conditions. Those elevated con-
centrations put the stormwater outlets well over the compliance levels for those water
quality parameters. By comparing the 1990 results with current results, we see that in-
let/incoming concentrations are little changed; the efficiency of the Biofilter today is de-
graded.
Page 1 of 23
04/10/2021
Background
Built in 1988, the Biofilter consists of 5.62 acres of stormwater treatment wetlands
owned solely by the Lacamas Shores Homeowners Association ("LSHOA").� The Biofil-
terworks by collecting stormwater runoff from LSHOA properties2 and routing the runoff
into a bubbler system where it is released below ground into the treatment wetlands.
The Biofilter was designed to process the stormwater from approximately 36.4 acres of
the Lacamas Shores development3 before reaching the Lake and its shoreline wetlands.
Excerpts from a 1993 national magazine article about the Biofilter4 summarize its in-
tended design:
"The Washington Department of Ecology required that the quality and quantity of
stormwater runoff from the [Lacamas Shores] development could not exceed pre -
development conditions. Therefore, runoff discharged to the lake had to be
treated and detained in an on-site facility [i.e., the Biofilter] before discharge."
"French drains, or'bubblers,' were designed to direct runoff below grade and cre-
ate asheet flow several centimeters deep that enters the upgradient edge of the
emergent [treatment] wetlands. The wetlands then 'treat' the inflowing storm -
water before it enters Lacamas Lake."
The only surface water connection between the Biofilter's treatment wetlands and the
shoreline wetlands of Lacamas Lake (the "Lake") is under two concrete bridges embed-
ded in the Heritage Trail. Aerial maps of the Biofilter are contained in Appendices A, B,
and C. Storm drainage facilities of the Biofilter are shown in red.
The largest part of the Biofilter is the filtering biology and sediments. The stormwater
Partners of SW Washington explains that stormwater treatment wetlands "...treat
stormwater through the biological processes associated with aquatic plants. These facil-
ities use dense wetland vegetation and settling to filter sediment and oily materials out
of stormwater."5 Their webpage as also states that "As stormwater passes through the
1 For this report, the "Biofilter" means the stormwater treatment wetland/facility on the LSHOA common property
adjacent to the shoreline along Lacamas Lake. It is next to but separate from the 0.25 -acre Lacamas Shores Bios-
waleand Sediment Settling Pond system. The "Swale/Pond" system is not part of the testing in this report.
z Approximately 65 of the 254 LSHOA lots drain into the Biofilter according to the map in Appendix E.
s Appendix E shows the sections that drain into the Biofilter: J, K and an unlabeled area. J+K=32.0 acres. The unla-
beled area drains 4.4 acres according to a 1991 "Shipler Property Bio -Filter Basins Map" (p. 19) where it is labeled
as "K". Therefore, as designed, the Biofilter should have a total drainage basin of 36.4 acres. Mackay & Sposito, 9
July 1996, Modifications to Lacamas Shores stormwater Disposal System: Drainage Calculation, p. 19.
a See Appendix F, pages 50 and 52.
s stormwater Partners. stormwater Facilities. Accessed 03/28/2021. https://www.stormwaterpartners.com/facili-
ties-treatment-wetland and https://www.stormwaterpartners.com/facilities-biofiltration-Swale. The density of
the plants' root systems is important to effective filtration.
Page 2 of 23
04/10/2021
plants, pollutants are removed by the combined effects of filtration, infiltration, and set-
tling." (Fig.1 6)
Figure 1. Key Principals of Stormwater
Biofiltration.
Stormwater runoff
delivered Into
blofilter ®�
�%�
Attenuation
of flow and
volume 1
Discharge downstream,
collection for re -use or
exfiltration into
surrounding soils
[or infiltration into ground water]
Properly dense and well rooted vegetation is key.
Vegetation "[s]erves multiple roles in water treat-
ment via uptake, transformation to organic forms,
carbon provision to microbes, transpiration reduc-
ing stormwater volume, stabilising media surface,
helping to maintaining infiltration rates, provides
cooling to surrounding environment, amenity and
aesthetics. The microbial community associated
with plant roots facilitates uptake, decomposition
and transformation of stormwater pollutants and
plant litter."�
Pollutants collected from filtered stormwater leave
a biofilter in only three major ways: use by plants
and the attached microbes for biochemical pro-
cesses; physical removal of dead or dying/sea-
sonal plant matter and sediments; or flowing into
the lake in dissolved form or attached to solids.
All filtration systems require maintenance to their
filters. For biofilters, that means removal of dead
or seasonal plant matter and sediment. According to Clark County, "Proper mainte-
nance helps ensure that facilities operate as they were designed and that trapped pollu-
tants, such as sediment and oils, are cleaned out so that the facilities do not become
pollutant sources."8 [emphasis mine] Maintenance was considered important enough
that the City permit for the property required the creation of the LSHOA specifically to ".
.. be responsible for monitoring and maintaining the storm drainage system ...",9 at
Ecology's directive !Appendix K�.
e Payne, E.G.I., Hatt, B.E., Deletic, A., Dobbie, M.F., McCarthy, D.T. and Chandrasena, G.I., 2015. Adoption Guide-
lines forStormwater Biofiltration Systems -Summary Report, Australian Government, Department of Industry and
Science, Melbourne, Australia: Cooperative Research Centre for Water Sensitive Cities. p.3 "Figure 1. Key Princi-
ples of Stormwater Biofiltration"
� Adoption Guidelines For Stormwater Biofiltration Systems, Table 1. Key components of stormwater biofilters and
their functional roles from p. 7.
$ Clark County Stormwater Manual 2015, Book 4 —Stormwater Facility Operations and Maintenance, Clark County,
Washington, November 24, 2015, p. 1. https://clark.wa.gov/sites/default/files/dept/files/environmental-ser-
vices/Stormwater/Code/ccsm2015-book-4.pdf.
9 City of Camas. 15 June 1988. City of Camas Permit No. 2-87 (C-2-87) and Shoreline Conditional Use Permit, Camas
Permit No. 590-14-7806. https://www.lacamasshoresbiofilter.org/uploads/1/2/2/5/122588755/
Is hoa_approved_permitJune_1988.pdf See bullet #12.
Page 3 of 23
04/10/2021
< wa ,a.
i,.
;
�%�
Attenuation
of flow and
volume 1
Discharge downstream,
collection for re -use or
exfiltration into
surrounding soils
[or infiltration into ground water]
Properly dense and well rooted vegetation is key.
Vegetation "[s]erves multiple roles in water treat-
ment via uptake, transformation to organic forms,
carbon provision to microbes, transpiration reduc-
ing stormwater volume, stabilising media surface,
helping to maintaining infiltration rates, provides
cooling to surrounding environment, amenity and
aesthetics. The microbial community associated
with plant roots facilitates uptake, decomposition
and transformation of stormwater pollutants and
plant litter."�
Pollutants collected from filtered stormwater leave
a biofilter in only three major ways: use by plants
and the attached microbes for biochemical pro-
cesses; physical removal of dead or dying/sea-
sonal plant matter and sediments; or flowing into
the lake in dissolved form or attached to solids.
All filtration systems require maintenance to their
filters. For biofilters, that means removal of dead
or seasonal plant matter and sediment. According to Clark County, "Proper mainte-
nance helps ensure that facilities operate as they were designed and that trapped pollu-
tants, such as sediment and oils, are cleaned out so that the facilities do not become
pollutant sources."8 [emphasis mine] Maintenance was considered important enough
that the City permit for the property required the creation of the LSHOA specifically to ".
.. be responsible for monitoring and maintaining the storm drainage system ...",9 at
Ecology's directive !Appendix K�.
e Payne, E.G.I., Hatt, B.E., Deletic, A., Dobbie, M.F., McCarthy, D.T. and Chandrasena, G.I., 2015. Adoption Guide-
lines forStormwater Biofiltration Systems -Summary Report, Australian Government, Department of Industry and
Science, Melbourne, Australia: Cooperative Research Centre for Water Sensitive Cities. p.3 "Figure 1. Key Princi-
ples of Stormwater Biofiltration"
� Adoption Guidelines For Stormwater Biofiltration Systems, Table 1. Key components of stormwater biofilters and
their functional roles from p. 7.
$ Clark County Stormwater Manual 2015, Book 4 —Stormwater Facility Operations and Maintenance, Clark County,
Washington, November 24, 2015, p. 1. https://clark.wa.gov/sites/default/files/dept/files/environmental-ser-
vices/Stormwater/Code/ccsm2015-book-4.pdf.
9 City of Camas. 15 June 1988. City of Camas Permit No. 2-87 (C-2-87) and Shoreline Conditional Use Permit, Camas
Permit No. 590-14-7806. https://www.lacamasshoresbiofilter.org/uploads/1/2/2/5/122588755/
Is hoa_approved_permitJune_1988.pdf See bullet #12.
Page 3 of 23
04/10/2021
Ina 1993 letter from Doug Quinn of the City of Camas10 ("City"), it was noted that the
Biofilter's treatment wetlands worked to reduce pollutants. Quinn quoted the firm that
conducted the 5 -year Monitoring Program required by permit": "In cases where the in -
flowing concentrations of the monitored water quality parameters are greater than the
established site-specific levels, there is always a decrease in these parameters after
passing over the wetlands."
The Monitoring Program was designed
specifically to measure the efficiency of
the Biofilter and set compliance stand-
ards to protect the water quality ("WQ")
entering the Lake. The Program and the
standards were required by the 1988
SDP/CUP Permit and 1988 Agreed Or-
der. The Order was entered by the
Shoreline Hearings Board with the
agreement of the City and Washington
Department of Ecology.
Specifically, the permit required "triggers"
(i.e., "compliance criteria" or "compliance
standards") to be created after the first
year of the Monitoring Program.12 Those
criteria were published in the annual
reports for the Monitoring Program and
sent to Ecology.13 They were also
published in a 1993 article about this
innovative Biofilter in a national water
technology magazine. See Table 1 from
Appendix F and Appendix G.
Table 1. Compliance Standards Required and
Set by City of Camas Permit (Appendix F)
Campllance level'
Bubbler, Bubbler.
Parameter Units wetland 1(S4) wetland 2 {52)
P0, mg;'L 0.061 [0.131] 0.042 [0.090}
Secondary
-- - �
Conductivity Itmho/cm 63 (97] $7 [1351
�� --i�3�
Copper
znc
mg/L
1.5 [4.2]
Wash. wq stds.
Wash. wq stds.
1.8 [4.5]
Wash. wq stds.
Wash. wq stds.
Chlorinated Ng/I- detection limit detection limit
'Numbers in brackets are the compliance concentration pus twice the standard devia[im.
Nash. wq stds. = Washington state water goal""ity standaros.
After 1993, an adjacent but separate "swale/pond system" was added to accommodate
re-routed stormwater from another 38.0 acres of LSHOA properties southeast of the
swale.14
to Quinn, D. Letter re: "Lacamas Shores Shoreline Permit", Received by the "Shoreline Committee Members", 22
June 1993, page 6. This letter was included in the 1993 Permit Revisions packet. Quinn was the Director of Public
Works and City Engineering.
tt City of Camas Permit. See bullet 9b. "During the first year, discuss appropriate use of the background data to
produce maximum contaminant levels. Most likely, these will have to use concentration values (mg/L). Develop
the 'formula' to convert concentrations into implementation trigger. This will be done in conjunction with Ecol-
ogy ��
iz City of Camas Permit. See bullet 9c. "Implement the trigger criteria at the end of the first year. "
13 Final year report: SRi/Shapiro, Five -Year stormwater Runoff and Wetland Biofilter Monitoring Program for the
Lacamas Shores Development: Fifth Year Report, March 11, 1994. See also the appendices in Appendix G below.
is Mackay & Sposito, 9 July 1996, Modifications to Lacamas Shores stormwater Disposal System: Drainage Calcula-
tion, p. 19. Shipler Property Bio -Filter Basins Map
Page 4 of 23
04/10/2021
During the Biofilter's first years, the property, named "Meadowlands Park" by the devel-
oper, was a mix of grassland and wetmeadow with a few scattered trees. Now, the Bio -
filter's wetlands are a mature stand of pacific willow, red alder, and other riparian spe-
cies.
Historical Scientific Data
One way to test the efficiency of any filtration system is to compare what goes into it
against what comes out of it. The majority of data about the Biofilter's efficiency comes
from 1988-1993, as listed in the 5 -Year Monitoring Program's last annual report in
Appendix A, Table 1.15 (Appendix G)
Between 1993 and last September, there had been no tests comparing the major water
quality parameters at the inlets to those at the outlets. The only known tests of the Bio -
filter since 1993 are:
• 04/2018 -Chemical Oxygen Demand ("COD") grab samples testing inlets and
outlets (Appendix H).
• 12/2019 -City of Camas/Otak/BSK Outlet Samples testing outlets for organic and
inorganic parameters (Appendix I).
• 05/2020 -City of Camas/Otak/BSK Outlet Samples testing outlets for organic and
inorganic parameters (Appendix J).
• 09/2020 —Current sampling ("Current") testing inlets and outlets for the three
major parameters, the main topic of this report (Table 3).
In 2019, the City committed to testing the stormwater runoff from the Biofilter. Using the
sampling locations in the Monitoring Program, the City selected the two outlet locations
closest to the Lake for sampling. The City did not include the compliance points, alt-
hough it is unclear whether the City knew of the compliance locations at the time of the
testing. The City did not include inlet points in their testing, so there was no determina-
tion of the Biofilter's effectiveness. While the City contracted for quarterly testing of the
two points, only two tests were conducted between Dec 2019 and Dec 2020.
is The full report is here: Bautista, Mark and Geiger, Stan (11 March 1994) Fifth Year Report: S -year Storm water
Runoff and Wetland Biofilter Monitoring Program for the Lacamas Shores Residential Development. SRI/Shapiro,
Lake Oswego, OR.
Page 5 of 23
04/10/2021
The City's December 2019 test and the 2018 chemical oxygen demand ("COD") sample
results indicated that there may be a problem with the Biofilter's efficiency16. However,
the 5.62 -acres of the filtering biology and sediments of the Biofilter have not been main-
tained or modified since inception. The reason was the understanding explained in a
letter written in 2018 by Ecology stating that "In this case, Ecology is unlikely to approve
the CUP Permit" to allow vegetation removal other than invasive species. 17 The City's
response to that letter was, as before, to disallow all maintenance that might require
tree removal. While the City has required
the LSHOA to complete some mainte- Figure 2. The "Filter" of the Biofilter Remains
nance to pipes and the adjacent biofiltra- unmaintained
tion system '18 there are no plans to require
maintenance to the largest part of the BIO- Lacamas Shores HOA Biofilter Maintenance since 1993
filter -the filtering plant biology and sedi-
ments (Fig. 2 19). While there are plans to
work with Clark County and the State to
address Lacamas Lake's toxic algae prob-
lem,20 there are currently no commitments
to test/monitor any other Lake inlets nor
the effectiveness of any biofilters in treat-
ing stormwater.
ie The 2018 COD Grab sample testing of inlets and outlets shows that the outlets had worse WQ than the inlets
(Appendix H). The December 2019 WQ testing by Y of Camas showed all three parameters were out of com-
pliance and above the maximum allowable levels (Appendix 1).
17 Rothwell, Rebecca. Letter to R. Maul and S. MacPherson. Re: Lacamas Shores Wetlands, 22 Feb 2018,
https://www.lacamasshoresbiofilter.org/index.html#6. p. 3. The author of the 2018 Ecology letter qualified her
conclusion, stating that she "had found no evidence that the wetland was constructed from upland for the purpose
A stormwater treatment or detention." It is likely that the author was unaware of a letter Ecology wrote in 1988
(Appendix K) showing their clear expectation that the Biofilter property was to be used and tested as a "wetland
filtering" system that was "on the periphery" of what they knew about biofiltering efficiency at that time. The 1988
letter and the compliance standards were brought to light by M. Tabata-Callerame in a 2020 email to Steve Wall.
Tabata-Callerame, M. "Re: RE: Lacamas Shores failed biofilter test plan/results". Email to Steve Wall.
05/26/2020.
18 The HOA has maintained the following: the nearby bioswale and sediment settling pond system ("swale/pond
system") via annually removing the vegetation and periodically dredging; the Biofilter bubblers pipes in 2019 for
the first time by cleaning them out from the inside; and the manholes coming from the City's storm vaults.
'The
Promise of the Lacamas Shores Biofilter: The Meadowlands Biofilter "Rediscovered" -FAQs. (n.d.)
https://www.lacamasshoresbiofilter.org/fags.html, Accessed 2/11/2021.
zD In 2020, Lacamas Lake tested positive for harmful algae toxins 26 out of 29 times between April and October, per
the Dept. of Ecology's website. Wa Dept of Ecology, 2020, Washington State Toxic Algae: Freshwater Toxic Algae
Bloom Monitoring Program [Lacamas Lake], https://www.nwtoxicalgae.org/Data,aspx?SitelD=94. Reports of toxic
algae blooms substantially increased from two in 2018, to three or four in 2019 (one test officially recorded on the
toxic algae website in June, others were reported by residents in September and October after funds for the test-
ing program had depleted), to the near -continual toxic algae blooms in 2020. Reports for Round Lake are similar.
Page 6 of 23
04/10/2021
Citizen Testing
On September 23, 2020, samples were collected of runoff flowing into the Biofilter and
from the outlets flowing into the Lake. These samples were delivered to Columbia La-
boratories for analysis. The purpose of this testing was to provide a snapshot in time of
the Biofilter's effectiveness. This snapshot only addressed the parameters that were
non-compliant in the 2019 and 2020 testing: total phosphorus ("TP"), total suspended
solids ("TSS") and conductivity.
The Collection Process
Sample locations were selected based on the inlets and outlets sampled in the Monitor-
ing Report. The City's sampling locations L1 and L2,21 also chosen from the Monitoring
Report, were added to allow for comparison to the City's December and May samplings.
Samples were taken as listed chronologically in the Table 3. Sample locations were
documented on Columbia Laboratories ("Lab") Environmental Chain of Custody Record
by Marie Tabata-Callerame before sampling. The collection process was video rec-
orded by reporter John Ley.
Optimal timing for sampling would have been during the first flush of the month, which
occurred September 18th and 19th, when it rained 2.16 inches after several dry days.
However, due to the unusually large amount of wildfire smoke before the first flush, the
decision was made to use the second flush, which occurred September 23rd. On that
day, sampling was accomplished in a moderate rain.
All sample containers were delivered from the Columbia Laboratories by the vendor to
Todd Schoenlein's house in a cooler. There were 250 ml plastic bottles containing 2 ml
of dilute sulfuric acid for each Total Phosphorus ("TP) sample and 1 -liter plastic bottles
without acid preservative, i.e., empty, for each total suspended solids ("TSS")�' conduc-
tivity sample.
Containers were labeled by Schoenlein. Tabata-Callerame verified the sampling loca-
tions and proper labeling. Samples for B1, B2, S2, and S4 were taken by Prof. Rodger
Hauge. Samples for L1 and L2 were taken by Schoenlein. Only Schoenlein and/or
Hauge handled open collection containers and put them in the storage cooler. Samples
were transported from site to car by Schoenlein and Hauge, then to the Lab by Schoen-
lein and Ley.
21 The City's sampling locations were shown in a document provided by the City's Director of Public Works Steve
Wall. "Exhibit A: City of Camas, Quarterly Sampling of Outfalls, Scope of Work, Otak Project #19447, November 13,
2019." was attached to: Wall, Steve. RE: Lacamas Shores failed biofilter test plan/results. Message to Steven D.
Bang. 05/15/2020. Email.
Page 7 of 23
04/10/2021
Standard Operating Procedures
The samplers wore gloves to avoid
sample contamination. Onsite, Hauge
tested water temperature in -stream us-
ing an aquatic thermometer. He tested
pH using a broad range LaMotte pH
test kit.
All samples for TP, TSS and conductiv-
ity were processed and reported by Co-
lumbia Laboratories (Appendix D).
Sampling Observations
Please see the maps in Appendices A-
Cand/or Fig. 3 for reference.
1. Inlet B2 was overflowing on the
day/time it was sampled (Fig. 4).
The water was flowing vigorously
out the top of the manhole and
flowing down a channel through the
Biofilter towards the Lake.22 No
measure of flow was made.
2. Inlet B1 was also overflowing but
with less volume than B2. There
was evidence that there had been
excavation around B1.2s
3. The volume of the stream at S4
Figure 3. Diagram of Biofilter Waterflow
Inlet Inlet Inlet
B2 Bl Swale
Figure 4. B2 Inlet manhole cover after 20 min. of rain
was much smaller than any other inlet or outlet tested.
4. The separate sediment settling pond system ("swale/pond system") was function-
ing. The swale has stormwater running through it and was flowing into the
swale/pond system as designed (Appendix E). The swale vegetation was short
and well maintained. The pond was discharging through two black outlets into
the shoreline wetlands upstream of the L2 location.
22 It was noted tvro wezks later, after a rain, that stormwater was sten flowing from the bottom of the B2 man-
hole riser down a channel into the Biofilter.
z3 It was noted two weeks later, after a rain, that the 61 manhole cover was observed as underwater. On
02/28/2021, the manhole was observed to be fully submerged.
Page 8 of 23
04/10/2021
5. The stormwater running from S4 (the Biofilter outlet) converged with water from
the black outlets of the swale/pond to run through L2 and into the Lake. The vol-
ume coming from the two black swale/pond outlets was much greater than the
volume coming from S4.
6. stormwater at the Biofilter outlets showed visible suspended solids. stormwater
at the Biofilter inlets appeared clearer in comparison, indicating erosion of sedi-
ment as it flowed across the Biofilter.
7. The only surface water connection between the Biofilter and the shoreline wet-
lands are underneath two concrete bridges on the Heritage Trail, one located at
S2 and the other at S4. All water exiting the Biofilter as surface water must go
through one or the other of these two points.
8. The S outlet locations are compliance points at the Biofilter's exits. The L outlet
locations are 16-30m downstream of the S locations and are within the shoreline
wetlands near the Lake waterbody.
Tables 2a, 2b, and 2c. Precipitation Results for Recent Sample Dates from the NOAA
Database for Station # US1WACK0029, located in Camas, WA, (45.584519, -122.373998).
12/15 - 0
12/16 _ _ 0
12/17 0
12/18 0
12/19 0.9
12/20 0.1
12/21 0.88
12/22. 0.06
12/23 0.24
12/24 0.02
12/25.._ _0
12/26 0
X
5/10' 0
5/11....: 0
5/12 0.33
5/13 0.07
5/14 0.17
5/15 0.19
5/16.... .0.02..........
5/17 0.36
5/18 0.47
5/19 0.36
5/20 0.03
9/15
9/16
9/17
9/18
9/19..... _:
9/20
9/21
9/22
9/23
9/24
9/25........
0
0
0
1.96 15Y flush
0.2
0
_0
0
..0.69.
0.77
0.77
5/21 0.64 X 9/26 0.25
5/22..:. 0.09 9/27..._ _0
5/23..._ 0 9/28.... 0
X
9. See the precipitation information in Tables 2a -c showing the amount of rain for
the recent datasets. Sampling during the first 12 -hours of a storm event is the
proper protocol for stormwater sampling, according to Ecology.24 For the Current
24 stormwater sampling standards require sampling during "...the first fall storm event each year. The [NPDES]
permit defines the first fall storm event as the first time after October 1st that precipitation occurs and results in a
stormwater discharge from the facility." It is also stated that one should "Collect samples within the first 12 hours
Page 9 of 23
04/10/2021
sampling (as with the Dec 2019 sampling), the prior 3 days were rainless. Note
that the May 2020 sampling was taken outside that protocol.
10. Biofilter vegetation was consistent with typical riparian species, including red al-
der and pacific willow.
The Test Results
September 23, 2020 Data ("Current")
The dataset resulting from the 09/23/2020 sampling ("Current") is summarized in Table
3, illustrated in Appendices A, B and C, and is compared to datasets from the 1990's
and the more recent 2019 and 2020 datasets ("Recent") in Tables 4-8. The Current da-
taset (Table 3) shows that:
• The results for the inlets are high for most parameters,
• The results for the outlet compliance points are higher than the inlets, i.e., the
water is more contaminated going out of the Biofilter than it was coming into the
Biofilter.
• The results for the points that the City tested (L locations) have values tower
than their respective upstream compliance points (S locations).
• All inlets and outlets are above the acceptable levels set by City permit.
Note: To understand these observations better, reference Figure 3 or the maps in
Appendices A, B, and C, each of which illustrate the locations from which the samples
and measurements were taken.
of stormwater discharge. If you are not able to collect a sample within the first i2 hours, collect the sample as
soon as possible. In the sampling records, keep documentation explaining why you could not collect samples
within the first 12 hours." Washington State Department of Ecology. "stormwater Sampling Manual: A guide for
the Industrial stormwater General Permit". December 2015. Olympia, WA. Publication No. 15-03-044. p. 16
Page 10 of 23
04/10/2021
Table 3. Sample Information and Results (listed chronologically)
Channel coming out of the
lakeside (N) of west bridge
COMPLIANCE POINT
Channel downstream of 52 be-
fore reaching the Lake -
City sample location for
Dec 2019 and May 2020
Channel before entering east
bridge6 (5) COMPLIANCE POINT
*Indicates that the reading is higher than any reading taken at that location, including since 1988.
Note that the maximum standard allowed ("max allowed") is calculated as the
compliance level plus two standard deviations. It was set to require maintenance action
and/or to indicate a violation of the permit.25
zs "In general, water quality values outside the range of two standard deviations from the baseline were consid-
ered of concern and warranting further consideration as to origin and impacts.... Exceeding the criteria would
provide a signal that the particular monitored parameter was varying outside of the annual baseline conditions and
that it may be necessary to implement contingencies." 5 -Year Monitoring Program Report. p. 5. Per Ecology, such
"contingencies" could include "...the development of a tightlined offsite stormwater facility." Appendix K, p.3
Page 11 of 23
04/10/2021
At the compliance locations, Current TP and TSS are the highest ever recorded for
those points. For S2:
• All three parameters are over the compliance level.
• TP is 5x the compliance level and over double the max allowed,
• TSS is 10x the compliance level and over 3 times the max allowed.
The S4 results show similarly noncompliant WQ levels:
• All three parameters are over the compliance level.
• TP is 8x the compliance level and over 4x the maximum allowed,
• TSS is 9x the compliance level and also over 3 times the maximum allowed
(about the same as S2).
• Conductivity is also over the maximum allowed.
The L2 -S4 difference is explained by dilution with the swale/pond outlet. The stream
coming from S4 merges with the much larger volume from the swale/pond system. It is
likely that any eroded sediments from the adjacent swale gets settled out into the pond.
That would be expected, since the City has required that system to be annually mowed
with the clippings taken away, as well as periodically excavated. The swale/pond sys-
tem was not sampled.
The L1 point (downstream of S2) seems to have been either diluted or filtered between
the two points, but no surface water source is visible.
Page 12 of 23
04/10/2021
Compared to Prior Datasets
Is the Current stormwater sample better or worse than in the past? Are there more pol-
lutants in the water now than when the Biofilter was created?
Comparing the Current parameter readings with the maximum readings at either compli-
ance point shows that the Biofilter is not working as it was in the 1980-90's (Table 4).
Note the low maximum and minimum readings for TSS, indicating a low rate of erosion
in the system and/or a high sediment settling rate.
Table 4. 1988-93 Minimum and Maximum Levels Recorded at the Compliance
Locations
To easily compare the Current results from Table 3 to prior datasets, Tables 5 and 6 are
configured to show the flow of water. The applicable compliance criteria were added for
reference.
Table 5 compares the inlet on the Westside of the Biofilter (B2) with the compliance
point outlet on the same side (S2). It also shows the most recent datasets from the
1990's taken within 14 days of the same date of each of the recent datasets (A�pendix
G). There are some interesting observations. Specifically, the TP, TSS and conductiv-
ity concentrations coming into the Biofilter are relatively the same as they were in the
1990's. Flow rate was not measured to determine total load.
Page 13 of 23
04/10/2021
Table 5. Westside of Biofilter Comparison: Inlets vs. Outlets and Current vs. 1990's
Refer to Figure 3 for waterflow diagram
Some observations:
• The water was 2-4 degrees colder in the 1990's.
• The water entering the Biofilter in the 1990's was not dissimilar in WQ to the
water entering the Biofilter now in Conductivity, TP, and TSS; the 3 major
parameters.
• The WQ at the outlets was much improved over the inlets in the 1990's for all
three major parameters.
• The contrast in WQ results show the deterioration of the Biofilter's effectiveness.
• While the 1990's results were sometimes over the compliance levels, the TP and
TSS levels were not recorded to be over the max allowed.
• The Current results were well over the max allowed for both TP and TSS, by
multiple factors.
The eastside of the Biofilter is captured in Table 6. The results were similar to the
Westside -the incoming stormwater concentrations were similar between the 1990's and
Page 14 of 23
04/10/2021
the Current dataset, but the difference between the outgoing concentrations were con-
siderable. The 1990's outlet parameters decreased for each whereas the Current outlet
parameters markedly increased (x6 for TP and x13 for TSS).
Table 6. Eastside of Biofilter Comparison: Inlets vs. Outlets and Current vs. 1990's
Refer to Figure 3 for waterflow diagram
Like Table 5, Table 6 shows that in the 1990's, the water was similar to the Current
stormwater coming into the Biofilter, and was again much cleaner exiting.
Note the 10/3/1990 dataset for TP. Even though inlet concentration was abnormally
high (1200 pg/L), the Biofilter brought it down to 121 pg/L, well below the max level,
showing the power of an efficient biofilter system.
Because the only locations that were tested three times within the last two years were
the outlet points L1 and L2, Tables 7 and 8 were created to compare those "Recent" re-
sults to the 1990's results, next to their upstream compliance levels.
Page 15 of 23
04/10/2021
Table 7. Historical Comparison: L1 Westside Biofilter Outlet to Lake
Refer to Figure 3 for waterflow diagram
Table 7 shows that when comparing the recent datasets to the1990's datasets taken at
the same time of the year, the water now is:
• hotter,
• pH is higher,
• the conductivity is generally higher (meaning there are now more dissolved solids
in the water),
• TP is much higher (doubled, similar, and x8, respectively), and
• TSS is much higher (x20, same, x13, respectively).
• While there was one non-compliant reading in the 1990's dataset, there were no
violations over the max allowed. The Current dataset has three non-compliant
readings, two of which are also over the max allowed.
• The Dec 2019 dataset and the Current dataset are consistent with each other.
Both TP and TSS were above the upstream compliance levels (x3 and x5, respectively)
and above the maximum levels (127% and 194°/0 of those max levels, respectively)
Page 16 of 23
04/10/2021
The anomaly for L1 in the recent datasets is the May 2020 set, which looks more like
the 1990's datasets than the recent ones. While it is shows a higher concentration for
conductivity, it is lower than all other recent datasets for TP and TSS. This is likely due
to being taken after 9 days of rain (Table 2b).2s
When looking at Table 8, it is important to note that the swale/pond system was added
sometime after 1993. Therefore, while the L2 results from the 1980's and 1990's were
measuring only the Biofilter, the L2 from the recent datasets measured a mix of -storm.
water from the Biofilter and a larger volume of stormwater from the swale/pond system.
Table 8. Historical Comparison: L2 Eastside Biofilter Outlet to Lake
Refer to Figure 3 for waterflow diagram
ze The City's May 2020 sampling day was on the 10th consecutive day of rain. While the May 2020 TP samples were
not above the Biofilter's site-specific compliance levels of 110 µg/Land 188 µg/L, the west outlet result of 71 µg/L
was above the EPA's recommended level of 50 µg/L as well as above the 2007 baseline levels for Lacamas Lake of
32-50 µg/L. Schnabel, Jeff and Hutton, Robert. "Monitoring Report: Lacamas Lake Annual Data Summary for
2007", Clark County Public Resources. June 2008. After 9 days of rain, a lower concentration should have been ex-
pected, closer the minimum levels recorded in Table 3.
Page 17 of 23
04/10/2021
The trends in Table 8 are in line with those in Table 7, i.e., the stormwater is still non-
compliant for all three parameters. However, only TSS is found above the maximum
level (160%), despite the upstream S4 compliance point concentrations being above
maximum for all parameters. This is explained by visible dilution with the swale/pond
system. In hindsight, the outlets from the swale/pond should have also been sampled
to confirm this hypothesis.
Also different in Table 8 is that the Dec 2019 L2 result is not similar to the Current L2 re-
sult. It could be that since Dec 2019 had a high volume of rain, a higher volume coming
from the swale/pond may have better diluted the S4 water before reaching the L2 outlet
point. Note that for L2, the Current dataset is the most deviated from the other two re-
cent datasets, although it is similar to the 1991 dataset in TP and conductivity.
The graphs in Figures 5-7 give a visual comparison of the 1990 datasets to the Current
dataset for the eastside locations, showing how different the changes in stormwater WQ
parameters are now between entry and exit of the Biofilter.
Figure 5. Comparative stormwater TP Concentrations: 1990s vs. Current for In-
let, Compliance Outlet, and Lake Outlet
Total Phosphorus
.��
500
400
303 287
�- 300
a
� --------- ------------------
200 140
124
100 ,.... ... _......... .,..� .............�� . ........
0
1990 1992 1993
Date: Sept/Oct each year
555
2020
■ 62 Inlet
■ 52 Compliance
� Ll Downstream
• S2 Compliance
_ _ Criteria
— S2 Maximum
Allowed
Fig. 5 shows the comparison between the Current dataset, where TP elevates signifi-
cantly after traveling through the Biofilter, and the 1990's datasets, where TP drops,
even when the stormwater is already relatively "clean". Note that the Current TP level is
typical at the inlet compared to the inlets of the 1990's, i.e., the TP concentration is not
higher now than it was recorded in the past. The Biofilter did not lower the same TP
concentration in the Current stormwater that it had treated in the 1990's.
Page 18 of 23
04/10/2021
The results for TSS are similar (Fig. 6).
Figure 6. Comparative Stormwater TSS Concentrations: 1990s vs.
Current for Inlet, Compliance Outlet, and Lake Outlet
TSS, ppm
250
260
200
J
n�
�- 150
vi 114
~ 100 g4 98 82
— �6------------------------- —
50
0 ...... .�.�............. 1�..32...............0:6....-•?� ....._. ..
1990 1992 1993 2020
Date: Sept/Oct each year
■ 82 Inlet
■ S2 Compliance
■ Ll Downstream
S2 Compliance
Criteria
— 52 Maximum
Allowed
Figure 7 shows that the Biofilter does not appear effective to decrease conductivity, nei-
ther now nor in the 1990's. Instead, it increases conductivity in the stormwater. Con-
ductivity only decreases for each dataset between the S and L locations, perhaps due to
dilution.
Figure 7. Comparative Stormwater Conductivity Concentrations:
1990s vs. Current for Inlet, Compliance Outlet, and Lake Outlet
FCS]
120
E
�
100
;,
so
.�
60
115
v
0
40
v
20
.7
Conductivity
-------------------------------------
118
115
FLIM;
100
88
........�y.. .......
1992
1051
1993
Date: Sept/Oct each year
Page 19 of 23
84.8
� i:a
2020
■ B2 Inlet
■S2 Compliance
■ LS Downstream
•• 52 Compliance
Criteria
— S2 Maximum
Allowed
04/10/2021
Discussion
The WQ of the stormwater going into the Biofilter for the Current dataset is above the
compliance criteria set for the Biofilter. This is consistent with the 1990's datasets.
The Current dataset, similar to the Dec 2019 dataset, shows that the TP and TSS con-
centrations for the stormwater coming out of the Biofilter at the compliance locations
were the highest ever recorded for those points.27 Those results were more than 2x the
maximum levels allowed for the Biofilter, as set by permit. This is divergent from the
1990 levels, which consistently decreased between Biofilter inlet versus outlet for all pa-
rameters, even the abnormally high ones.
All three WQ concentrations lowered after leaving the Biofilter (the compliance S loca-
tions) and before reaching the downstream L outlet points (tested by the City) in the
shoreline wetlands. Though lowered, those concentrations were still higher than the
maximum allowed for TP and TSS.
The reason for the decrease in concentrations on the eastside (from S4 to L2) is dilution
with the swale/pond outlets. This is confirmed by visual observation of a large amount
of stormwater coming from the swale/pond system merging with the relatively small
stream from the Biofilter a few meters upstream of the L2 point. This difference indi-
cates that the stormwater from the swale/pond system is relatively clean and therefore
able to dilute the high pollutant concentrations coming from the Biofilter. This also indi-
cates that the swale/pond system is working to clean stormwater coming from the 38.0
acres of the LSHOA's east -side properties.
The Westside (S2 to L1) has no visible surface water dilution source to explain the de-
crease between the two points, so the reason for the change in concentrations is un-
clear. There is a 1.25m rocky rooted waterfall where a groundwater source could be
entering the stream. Based on our available data, the difference could be due to dilu-
tion with groundwater, waterfall aeration or that the shoreline wetlands are acting as a
second biofilter. Note that the latter is specifically what Ecology wanted to avoid by hav-
ing stormwater treated with a filtration wetland -they did not want the shoreline wet-
lands exposed to pollutants.28
The Current dataset indicated that the WQ coming out of the Biofilter is worse than the
WQ going into it. The Biofilter has violated the permit standards set for it. The TP load
coming from the Biofilter is contributing to the total TP load for the Lake and feeding
harmful algae blooms where they have been appearing with increasing frequency.
Z' The Current and Dec 2019 TP readings are higher than the median TP levels for industrial land use of 171µg/L,
i.e., the Biofilter is at times putting more TP in the stormwater than most industrial sites in western Washington.
Hobbs, W., B. Lubliner, N. Kale, and E. Newell. 2015. "Western Washington NPDES Phase 1, Stormwater Permit:
Final Data Characterization 2009-2013". Washington State Department of Ecology, Olympia, WA. Publication No.
15-03-001.
28 Appendix K. "With this policy in mind, we want to see the resulting permit with conditions to provide additional
protection to the shoreline environment." (p. 1) "The stormwater monitoring plan now includes contingencies to
divert flows should this wetland show signs of stress from the increased water regime." p. 2.
Page 20 of 23
04/10/2021
Conclusions
1. The Current snapshot test results during the moderate to heavy rain, yielded Bio -
filter inlets concentrations for TP, TSS, and conductivity higher than the compli-
ance standards.
2. The stormwater parameter concentrations increased between each inlet and its
respective outlet, i.e., the Biofilter was adding TP, TSS and dissolved solids into
the stormwater instead of filtering them out.
3. The concentrations for both compliance point outlets were higher than the maxi-
mum allowed via permit for TP and TSS.
4. The Biofilter "plumbing" leading to the bubbler pipes was overcapacity after mini-
mal rain. Two weeks later, water looked like it was exiting from the bottom of the
elevated B2 manhole, creating a channelized stream. This indicates that the
bubbler may not be working properly to spread the stormwater.
5. Alternatives to handling the large amounts of flow, possibly due to additional hard
surfaces of new neighborhoods/areas uphill of B2, should be investigated.
6. The erosional processes of the overflowing stormwater creating free-flowing
streams through the Biofilter should be addressed.
7. The Biofilter's sediments have been trapping phosphates from prior stormwaters
for years. Now, the stormwater is eroding and mixing those phosphate -heavy
sediments back into the outflow. The sediments have become a vehicle for put-
ting phosphates into the Lake.
The question then becomes, is the drainage part of the system broken or the filtering
part of the system broken? It seems likely to be both. The water should not have been
as visually fast flowing after 15-60 minutes of rain, nor should stormwater be channel-
ized from the inlets all the way to the outlets. Even so, the combination of all storm -
water exiting the Biofilter as surface water, both the channelized and dispersed, at ei-
ther of the two outlet points (S2 and S4), should still have had lower concentrations of
TP and TSS than was found. The age of the Biofilter, the length of time without mainte-
nance, and the amount of accumulated sediment over the last 3 decades may be con-
tributing to the inefficiency exhibited in this Biofilter.
The Biofilter, as it is currently configured, cannot handle the TP concentrations coming
into it. Too much untreated stormwater runoff is reaching the Lake. In fact, the La -
camas Shores Biofilter is not doing the Lake any good at all at this time. Even if the
stormwater runoff poured from the inlets directly into the lake, TP would still be too high
according to the City permit standards. The Biofilter needs repair, restoration, and/or im-
provement in order to ensure that future stormwater WQ meets the compliance criteria
set at the compliance locations and stops contributing to future harmful algae blooms.
Page 21 of 23
04/10/2021
Recommendations
While there are multiple ways to use the same Biofilter footprint to properly filter the
stormwater coming into the Biofilter, the current situation is harmful to Lacamas Lake
water quality and is, per City permit, not acceptable. Options include:
• Returning the Biofilter to the original designed standard,
• Following the 1999 maintenance manual for the system,29
• Adding the "checkdams" proposed in the Monitoring Report,so
• Inclusion of the Biofilter inlets and outlets as part of any Lacamas Lake source
assessment by the City or County.
z9 City of Camas. Lacamas Shores HOA Interim Trail, Open Space, Wetland and Storm Drainage Maintenance Man-
ual. Camas, WA. (n.d.) This manual was written/commissioned by the City of Camas for the LSHOA sometime af-
ter 1998 with specc directions for maintenance. any of those directives (such as removing debris, sediment
buildup, dead vegetation, and trees that interfere with maintenance) do not appeared to have been followed.
so SRI/Shapiro. "5 -year Stormwater Runoff and Wetland Biofilter Monitoring Program for the Lacamas Shores Resi-
dential Development Camas, WA -Fifth Year Report", p. 8. March 11, 1994. The 5`—Annual report for the Monitor-
ing Program suggested on page 8 that: "Small checkdams [AKA level spreaders] using downed logs could remedy
the situation [of channelization]." Adding checkdams to the original Biofilter design would serve to slow and
spread the stormwater, decreasing channelization and allowing for more infiltration. This action was not taken.
Page 22 of 23
04/10/2021
List of Appendices
A, B and C) 09/23/2020 Lacamas Shores Biofilter Efficiency Monitoring Maps
A) Total Phosphorus
B) Total Suspended Solids
C) Conductivity
D) Columbia Laboratory Report #20-010257/D02.R01, Dated 10/07/2020.
E) 1998 Drainage Basin Map for the "Modifications to Lacamas Shores Stormwater
Disposal System". This map shows the Q2 capacity of the bubblers to be at 11.0
cfs for B2 and 5.0 cfs for B1. "Q2" is the estimated design discharge (Q) capacity
needed to handle a 2 -year storm event, i.e., the type of storm that happens every
two years.
F) Bautista, Mark F. and Geiger, N. Stan "Wetlands for Stormwater Treatment."
Water Environment & Technology, July 1993, pp. 50-55. This national magazine
article was written exclusively about the innovative design of the Biofilter, with
maps and a chart of the "Compliance Criteria"
G) Bautista, Mark and Geiger, Stan (11 March 1994), Appendices to the Five -Year
Stormwater Runoff and Wetland Biofilter Monitoring Program for the Lacamas
Shores Development — Fifth Year Report. SRI/Shapiro, Lake Oswego, OR. Da-
tasets are in Appendix A, Table 1 - "Lacamas Shores Water Quality Data, 1988-
1993." The compliance standards are shown in Tables 12-15.
H) April 2018 COD Grab Sample Info Sheet
I) City 12/2019 Results: BSK Associates (1/13/2020). Certificate of Analysis for
V9L0419. Samples submitted 12/19/2019.
J) City 05/2020 Results: BSK Associates (6/11/2020). Cert
ificate of Analysis for
VDE0400. Samples submitted 05/21/2020.
K) Jewett, Nora. Lacamas Shores Development Permit Additions. Received by Mel
Avery. 22 June 1988. Washington Department of Ecology. Mel Avery was the
Director of Public Works for the City of Camas.
Page 23 of 23
04/10/2021
r
N
r
N
O
� N
v v o r� W 0
v N (DN
E v m O
cn c� :r N
O p N
cru CD fD N
=r(n O
p �-�-
0�0 N C N
C/) (D to �h
Cv � 0 (D CD
o < MN
m m
H N O�
(D 0
O 0•
D �0
T m 0
m �
o Z
° fD O
SO, o
rMIL
O
O LU II
3 X G) :Z!
ED
o 3
CD O v ED
vQ rrD
o
+ (D r v
v o
v
n
O
� o h
3 O
r*
L N rm 3
rr �h
N 0 rD
rf
En
(D V) O
v O rr
O
r
=1
3 3 0 r IV n
cQ W
i= m cn 0
v�� N ON
O N 3 0 m Cn
� (D MCD N 0
v ° Q O
� (D
m Cl)
Z m v 0O
0 v (jj moh
r vCL_
N f" C Q w N N CD
r° —
• m n Q �' X11
u
m
00 °Q m
4 Q C
Zftlt 0
rMIL
D�� O
MO 0
O
O cn
A
O O 0
Q
v ((D = C) fit
o m IV
<C:) Cl) C -j V/
rMF m
v orA
O
o cD S CD
%o@ CD
N n (a C
oO �
o �h
o 4
oo3
� o 0 C.
m � C) C7
3 O
o Q
rMIL
(D cQ O
o � �
u e� �1-omcfww �9 �nnuvament - aaq
February 16, 2018
Tom Kelly, President
Lacamas Shores Home Owners Association
PO Box 751
Camas, WA 98607
Environmental Technology Consultants
A Division of Sisul Enterprises, Inc.
PO Box 821185, Vancouver, WA 98682
(360) 6964403 Fax: (503) 657-5779
WA Landscape Contractors License #: ENVIRTCO23RB
Web: www.etcEnvironmental.net
Email: lohnOetcEnvironmental.net
RE: Possibly failing stormwater system at Lacamas Shores HOA, (Meadowlands Park, Property
Identification Number 84839000)
Dear Mr. Kelly,
While mapping wetlands for the LSHOA in Meadowlands Park, I noticed that one of the bubbler systems
and filtration fields appears to be failing. It is shown as Bubbler #2 on the attached drawing.
I am not a stormwater engineer, and so my opinion should be considered that of as a lay person for this
matter. I observed a lot of water gushing up from under the manhole below the 13-2 vault, I presume
this manhole distributes stormwater to the two underground French Drain pipes shown in the drawing.
My guess is that the pipes are plugged or broken, explaining why the water appears to be coming from
under the manhole.
This water flows in a narrow channel downslope to Lacamas Lake, whereas the design of the facility is
for the flow to be spread out Cl"d flow through abed of herbaceous plants. In my opinion the system is
effectively discharging untreated stormwater directly to the lake rather than filtering it through gravel,
soil, and herbaceous plants as intended.
This may be in violation of the permits governing the system. My intent is only to inform so that the
LSHOA may take appropriate actions to avoid being out of compliance with it's permits and
responsibilities to maintain the stormwater system.
Since I ,
41W /// 11d
'Sn McConnaughey, PWS
etland Scientist
Attachment: Page 54 from: Water Environment &Technology, July 1993.
ETC project 15006 Page 1/1
2/28/2018 10:33 AM
kPPE DIS . G5 F 0 C U S PAGE
e Patterns for Lacamas Lake Stormwater Wetland Trea m+
■Storm sewer sediment facility ♦Lake sample site — —Drainage basin boundary
� Stream sample site ���o Bubbler (French drain)
• Water well ❑ Vegetation transect
The residential development is located on the south-
western shore of Lacamas Lake. The southern two-thirds of
the site is occupied by residential home lots. The northern
third is composed of wetlands and grassy areas. The area
directly adjacent to the lake is a forested wetland 15.2 to
30.4 m (50 to 100 ft) wide. From this forested area, areas
A emergent wetlands extend southeast 121.6 to 182.4 m
(400 to 600 ft).
The development site is steep. Surface elevation drops
from 106.4 m (350 ft) at the south edge of the project to
57.8 m (190 ft) at the lakeshore. Before development, the
area had five major surface -drainage features. As the site
has been developed, stormwater runoff from paved sur-
faces and the flow in four streams has been collected by
pipes and catch basins and discharged into the French
drains ("bubblers") located along the upgradient edge of the
wetlands. The four northern streams are spring -fed and usu-
ally flow during dry weather. The fifth stream adjacent to the
road and the boat ramp is intermittent and flows only dur-
ing periods of significant rainfall.
Water Environment &Technology
Total phosphorus in surface water flowing out of the
wetlands (the limiting nutrient in the lake) was con
sistently below established compliance levels.
No herbicides or pesticides were detected in the
first flush samples for 1991 and 1992. Dissolved met -
(chromium and zinc) were detected in selected
samples, but at levels equal to or less than EPA drink -
water standards.
Compliance levels, excluding TP, were exceeded on
two of the six monitoring dates during the third year
of monitoring. The nitrate concentration at station
S4 (below the bubbler in wetland 1) was slightly above
the upper compliance level. The soluble phosphorus
and nitrate criteria were also exceeded at S2 and S4,
respectively. These two parameters were in compli-
ance for the remainder of the monitoring season.
Increased nitrate values during the winter warranted
closer scrutiny during the fourth year of monitoring
to see whether the trend continued.
During the fourth year, the compliance level for
nitrate was exceeded on two of the four monitoring
dates. As in the third monitoring year, the levels were
exceeded in the winter sampling months, and nitrate
values for the two transects were in compliance for
the remainder of the monitoring season.
Attachment 7
Susan Oatney <camaSK!asrun@yahoo.com>
Mon 712012020 4:59 PM
To: Marie Tabata-Callerame <aikotabcal@hotmail.com>; Steve any <steven dbang@comcast.net>
1 attachments (;4 KB)
Lacamas shores Biofilter.docx;
Marie, Steve,
I have attached the comments I made to the City Council
!.my name is Susan Oatney, and my family and I have lived in Camas since 2008. 1 have been working
for 35 years in the industrial WW treatment industry, solving waste treatment issues for my customers.
Many of my customers have direct discharge permits, meaningthey do not discharge to a city system,
they discharge to a body of water, like a lake, stream, river, ocean, etc. Their permits are exceedingly
strict and as part of the "Waters of the US ACT", they, along with the guidance of Federal EPA, are
continuallY trying to improve and bettertheirown discharge to what is now called "Navigatable
Wate rs".
The numberof nights I have spenton customersitesfighting to keepthem in compliance are
incalculable. The number of sleepless nights my customers have endured are again incalculable. Not
violating their discharge permits is not only important—it is the most importantthing theydo.
Production will shutdown, personnel will go without sleep, 100,000's of thousands will be spent on
consultants and outside support to keep industry in compliance. Why—the stakes are very high. Not
only forthe environment, but for plant management itself. Continued violation of the Clean Waters Act,
which as of June 22 was amended to be the "Navigatable Waters Protection Act" can result in a felony
and jail time for management. Based on the information shared by Marie Callerame, we have not only
exceeded permitguidance forthe Lacamas Shores biofilter, but we have violated the maximum
threshold for Phosphate and TSS in Decemberand the City Council was notified verbally in June. This is
an incredibly serious situation. As mentioned above, industrial customers knowlingly violating this act
can and do go to jail!
Those permitguidelines were setfor a reason—the TotalSuspended Solids, Phosphate, and Conductivity
levels are set by determiningthe safe amountthat particular stream can contribute to the lake without
harming biology. Health advisers currently warn about using our lake. —we can't let our dogs swim and
play in it, we are advised notto swim in it, fish from it must be cleaned a certain way. I myself, along
with others, have gotten sick after accidently ingesting waterfrom the lake. It is the crown jewelof our
community;yet day in and day out, the Lacamas Shoresbiofilterand othercontributors are allowedto
continue polluting it. I know that many within Lacamas shores have been pleading for nearly a decade
to get the biofilterfixed. Howeverthere is very loud, yet minority, contingent in the HOA and the city
that continually refers to the biofilteras a Wetland. It is not—it cannot be both and is excluded from
the navigatable waters protection act. That undeniable factual exculsion is as a storm water control
feature. The biofilteris an award winning engineered storm water system that disparately needs
maintenance.
I knowthese are crazy times, but we can do something about this!