ORD 15-028 ORDINANCE NO , 15 - 028
AN ORDINANCE approving and adopting by reference the text of
that certain document entitled Washougal School District Capital Facilities
Plan 2015 - 2021 .
WHEREAS , the Washougal School District has submitted an amended capital facilities
plan entitled "Washougal School District Capital Facilities Plan 2015 -2021 " to the City for its
review and approval , and
WHEREAS , the Council has considered said capital facilities plan and has conducted a
public hearing, and desires to adopt the same as the capital facilities plan for the Washougal
School District,
NOW, THEREFORE , BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
CAMAS AS FOLLOWS .
Section I
The Council hereby approves and adopts by reference a volume of text entitled
" Washougal School District Capital Facilities Plan 2015 - 2021 " as the amended capital facilities
plan of the school district, which shall provide the basis for the collection of school impact fees
by the City on behalf of the school district .
Section 11
A copy of the Washougal School District Capital Facilities Plan 2015 -2021 shall be
maintained in the council file on these proceedings , and copies of said Capital Facilities Plan
shall be made available for public inspection at the Public Works Department .
Ordinance No . 15 - 028 Page - 2
Section III
This ordinance shall take force and be in effect five ( 5 ) days from and after its publication
according to law .
PASSED by the Council and APPROVED by the Mayor ° s 21St y of December, 2015 .
t
SIGNED :
Mayor
ATTEST :
C� -
Clerk
APPROVED as to form :
City Attorney
WASHOUGAL SCHOOL DISTRICT
CAPITAL FACILITIES PLAN
2015-2021
BOARD OF DIRECTORS
Ron Dinius, President
Elaine Pfeifer, Vice President
Karen Rubino
Teresa Lees
Bruce Westfall
SUPERINTENDENT
Dawn Tarzian
DIRECTOR OF Facilities
Joe Steinbrenner
Adopted by the Washougal School District Board of Directors
May 26th, 2015
I. INTRODUCTION
A. Purpose of the Capital Facilities Plan
The Washington State Growth Management Act (the "GMA") includes public school facilities
and services that must be provided as cities and counties plan for growth. School districts
have adopted capital facilities plans to satisfy the requirements of the GMA and to identify
additional school facilities necessary to meet the educational needs of the growing student
populations anticipated in their districts.
The Washougal School District (the "District") has prepared this Capital Facilities Plan (the
"CFP") to provide Clark County (the "County") and the cities of Camas and Washougal (the
"Cities") with the District's anticipated capital facility needs and the District's schedule and
financing plan for those improvements over the next six years (2015-2021).
In accordance with the Growth Management Act and the County and City Impact Fee
Ordinances, this CFP contains the following required elements:
■ The District's standard of service, which is based on program year, class size by
grade span, number of classrooms, types of facilities, and other factors identified
by the District, including teacher contracts and funding requirements.
■ An inventory of existing capital facilities owned by the District, showing the
locations and capacities of the facilities, based on the District's standard of
service.
■ Future enrollment forecasts for each grade span (elementary, middle, and high
schools).
■ A forecast of the future needs for capital facilities and school sites based on the
District's enrollment projections.
■ The proposed capacities of expanded or new capital facilities over the next six
years based on the inventory of existing facilities and the standard of service.
■ A six-year plan for financing capital facilities within projected funding capacities,
which clearly identifies sources of public money for such purposes. The
financing plan separates projects and portions of projects that add capacity from
those that do not, since the latter are generally not appropriate for impact fee
funding.
■ A calculation of impact fees based on the formula in the County and City impact
fee ordinances and supporting data substantiating such fees.
1
B. Overview of the Washougal School District
The Washougal School District is located in southwest Washington and serves residents of
Washougal, Camas and unincorporated Clark County, as well as residents in the Columbia
River Gorge who live in the Cape Horn area of Skamania County. The District map reveals a
long, narrow band of land that extends from the Columbia River on the south all the way
north to the White Pass School district in Lewis County. This geographical configuration
gives Washougal the unusual feature of being incorporated into two counties (Clark and
Skamania) and bordering two other counties to the north and west (Cowlitz and Lewis). The
District is bordered on the west by seven school districts—Camas, Hockinson, Battle
Ground, Woodland, Kalama, Kelso, and Toutle Lake school districts. It is bordered on the
east by the Skamania School District. The northern end of the District includes the
uninhabited wilderness around Mt. St. Helens in the Gifford Pinchot National Forest. One of
the district's schools, Jemtegaard Middle School, is located within the national boundary of
the Columbia River Gorge Scenic Area.
The District serves a population of 3,104 students. Of the 3,104 students, 1,399 students
attend classes in 3 elementary schools (grades K-5), 741 students attend classes in two
middle schools (grades 6-8), and 964 students attend classes in one high school and one
alternative high school (grades 9-12). For purposes of facility planning this CFP considers
grades K-5 as elementary, grades 6-8 as middle school, and grades 9-12 as high school.
In November 2015, the District re-evaluated enrollment forecasts and student generation
rates based on recognized methodologies including trends in land development, housing
starts, and residential construction and that data is reflected in this plan.
The most significant issues facing the District in terms of providing classroom capacity and
maintaining support facilities to accommodate existing and projected demands are:
■ In 2005, the district purchased two portable units (4 classrooms) to alleviate
overcrowding at Gause Elementary and Cape Horn-Skye Elementary.
■ Jemtegaard Middle School was constructed in 1982 and now qualifies for state
matching funds. The main structure is surrounded by older portables used to house
students beyond the school's original capacity. The entire facility is in need of
modernization and repair to function as a quality educational space.
■ The District completed the OSPI Study and Survey in 2015 and presented a multi-
project bond to voters in February 2015 that includes construction of a new K-8
school on the existing Jemtegaard site, which will be comprised of a new elementary
school and a replacement middle school. The bond also includes construction of a
new Alternative High School on -the Excelsior High School site. Extensive
collaboration between the District and the Columbia River Gorge Commission
resulted in preliminary understandings that can be drawn upon in the future.
The District is overcrowded at the middle schools and two elementary schools. The
former shop classroom and a home economics classroom at Jemtegaard Middle
School continue to be used as general classroom space. Gause and Hathaway
elementary schools have reached capacity.
■ The District owns property known as the Kerr property, which is suitable for a new
elementary and a new middle school and a new district transportation facility. The
2
Kerr property was paid off in 2013. Purchase of additional land for future school
facility sites is currently being studied.
■ The City of Washougal has initiated construction to modernize Washougal's main "E"
Street corridor. The current school district transportation facility is located on "E"
Street, and the District and Board met several times in 2009 with the City to
determine the impact of the street construction on the district transportation property.
Significant changes include a reduction in the number of driveways and a new
pedestrian sidewalk, which will change the traffic flow from "E" street into and out of
the bus maintenance garage. In order to accommodate the reduced access, five
buses have been moved and are being parked at another district location to allow for
a circular traffic flow into and out of the bus maintenance garage.
■ In 2005, the City of Washougal in partnership with the District began development of
three baseball fields on District property known as the George Schmid Fields. Two
fields have been completed. Completion plans for the third field includes the addition
of a restroom and a small office/concession stand.
■ The District Administrative Services Center has no additional office space available.
■ District growth has been residential rather than industrial. Assessed valuation is
slowly increasing since 2013. The District and local property taxpayers would still
benefit from industrial growth.
In summary, Washougal School District recognizes that quality schools are essential to a positive,
growing community. People gravitate to communities with great schools, and businesses thrive in
communities where there is pride and accomplishment associated with educational opportunity.
Washougal School District is engaged in long-range educational, fiscal and operational planning that
will benefit the students, families and community members it serves.
II. DISTRICT EDUCATIONAL PROGRAMS AND STANDARDS OF SERVICE
To provide quality education, the District must have quality facilities. Facilities provide the physical
structure necessary for achieving educational goals established by the Board of Directors.
School facility needs are dictated not only by student enrollment, but also by the space required to
accommodate the District's adopted educational program. Beyond regular education, the district
also provides specialized programs with unique facility needs such as special education, bilingual
education, and technology education, pre-kindergarten and after school programs.
The District's program and educational standards for 2015 are summarized below. The program
and educational standards may vary during the six-year CFP window. Absent significant changes in
factors that are beyond the District's control, the District will provide the following programs and
standards of service in 2015, 2016, 2017, 2018, 2019 and 2020. If significant changes occur that
require new facilities or improvements, beyond what is identified in this CFP, the District will prepare
and submit an updated CFP.
A. District-wide Educational Programs
The Washougal School District's core services and program offerings include the following:
■ Elementary schools provide education in all core subject areas including reading, writing,
math, social studies and science. In addition, students participate in P.E., music, art and
library programs.
3
• Middle schools provide instruction in the core disciplines of English, mathematics, social
studies, science, P.E., music and art. Students have elective offerings available
including robotics, music and art. An extracurricular sports program is offered after
school to students in 7t1 and 8` grades.
■ High schools provide course work including English, history, science, mathematics, P.E.,
music and art. Additional offerings include career and technical education programs,
career counseling, access to Running Start at Clark College, and Advanced Placement
courses. An extracurricular program includes clubs, sports, arts, etc.
■ The District provides science classroom space supporting advanced coursework at the
secondary level that require water, sinks, gas, hoods, safety equipment, etc. Schools
are working to meet expanded science standards and this will require spaces that
cannot typically be met by adding portables.
■ The District will need to upgrade elementary, middle school, and high school spaces
supporting health, fitness, and extracurricular activities. This includes replacing the turf
and gym floor at the high school.
■ Technology access is necessary and expectations are increasing. Technology (either
within the classroom or in dedicated labs) takes extra space that is not calculated in
current state square footage allowances, but is necessary for student learning.
Technology support and infrastructure needs are also increasing including the
installation of fiber optic cable to Jemtegaard and Canyon Creek Middle School as well
as Cape Horn Elementary.
■ Beginning in the fall of 2014, the District changed to an all-day Kindergarten program.
This change has required one additional classroom space per elementary school.
■ Art and Music spaces are critical to the District's educational programs. As student
population grows, so too will the need grow for spaces to support these essential
programs.
■ Library/Media demands are crucial. In an information driven environment, access to
knowledge through appropriately sized library/media spaces is essential.
■ Extra-curricular activities need space in order to be supported properly with growing
student populations.
■ Supplementary services in core academic areas and multiple pathways that prepare
students for a broader range of post-secondary learning opportunities require additional
space.
In addition to the above core educational programs, the following support services are essential to
the District's educational program:
■ Given current enrollment, the core facilities are sufficient at all schools except
Jemtegaard Middle School where the addition of six basic education portable
classrooms is beyond the capacity of the older commons area where all students have
lunch.
4
■ Maintenance and warehouse support facilities are a necessary component to the District
operations.
The following special services are also required to meet the needs of special populations:
■ Special Education programs are provided at all schools within the District. Special
needs program standards change year to year as a result of various state and Federal
regulation adjustments. Changes may also be prompted by research-based
modifications to programs, class sizes, and the changes in the population of students
eligible for services. Modifications in school facilities are sometimes needed to meet the
unique needs of individual students or cluster small groups of students with similar
needs.
■ Federal and state programs, including Title 1 Reading and Math, Highly Capable, and
Bilingual are required programs with limited funds that do not cover the expense of
adding facilities as needed to support the programs.
■ The District's pre-school program is housed in five classrooms across the district, one or
two classrooms at each elementary school.
B. Elementary Educational Standards
The following District educational standards of service affect elementary school capacity:
■ Class sizes for grades K-3 are targeted not to exceed 25 students per class.
■ Class sizes for grades 4 and 5 are targeted not to exceed 28 students per class.
■ Music instruction will be provided but in separate (pull-out) classrooms.
■ Physical education is provided in a separate area.
■ All elementary schools have a library/media resource center.
■ A standard for technology is being developed for elementary classrooms.
■ Special education, Title I and LAP (Learning Assistance Program) instruction is provided
for some students in classrooms that are separate from regular teaching stations. Class
sizes in these programs tend to be small, usually not more than 15 students.
C. Middle and High School Program Standards
The following District educational standards of service affect middle and high school capacity:
■ Class sizes for grades 6-8 are targeted not to exceed 28 students per class.
■ Class sizes for grades 9-12 are targeted not to exceed 28 students per class.
■ Music, art, PE, drama, and career and technical education classes are provided in
separate instructional space.
5
■ Counseling and career center programs are provided in separate spaces.
■ A standard for technology is being developed for secondary classrooms. Technology
labs and distance learning labs are provided in separate spaces.
■ Each middle and high school has a separate library/media resource center.
III. CAPITAL FACILITIES INVENTORY
The facilities inventory serves to establish a baseline for determining the facilities that will be necessary
to accommodate future demand (student enrollment) at acceptable levels of service. This section
provides an inventory of capital facilities owned and operated by the District including schools,
portables, and support facilities.
A. Schools
The District maintains three (3) elementary schools, two (2) middle schools, one (1) high school,
and one (1) alternative school. The elementary schools serve grades K-5, middle schools serve
grades 6-8, and the high school serves grades 9-12. Presently the alternative school serves
grades 9-12.
Table 1 shows the name, number of teaching stations and student capacity for the elementary
schools based on the District's standard of service described above.
Table 1: Elementary School Inventory 2014/15
Three (3) Total Bldg. Teaching 2014/15
Elementary Student Capacity
Schools Sq. Ft. Stations Enrollment
Gause Elem. 56,196 19 475 587
Hathaway Elem. 48,901 17 425 405
Cape-Horn Skye 43,838 16 400 407
Total 148,935 52 1300 1399
Table 2 shows the name, number of teaching stations and student capacity of the two (2) middle
schools based on the District standard of service described above.
Table 2: Middle School Inventory 2014/15
Two (2) Total Bldg. Teaching Student 2014/15
Middle Schools Sq. Ft. Stations Capacity Enrollment
Canyon Creek MS 46,609 9 252 249
Jemtegaard MS 50,808 11 308 492
Total 97,417 20 560 741
6
Table 3 shows the name and number of teaching stations and student capacity of each school
based on the District standard of service described above.
Table 3: High School Inventory 2014/15
High Schools Total Bldg. Teaching Student 2014/15
Sq. Ft. Stations Capacity Enrollment
Washougal HS
150,471 34 952 895
Excelsior Portables 3 0 69
Total 157,291 37 952 964
Student capacity was determined based on the number of teaching stations within each building
and the space requirements of the District's current educational programs and standards of
service. Student capacity as noted in Tables 1, 2, and 3 does not include capacity that is
currently provided in portables at each school.
B. Portables
Portable classrooms are used on an interim basis to house students until funding can be
secured to construct permanent classrooms. To accommodate future growth on a short term
and immediate basis, the Washougal School District may purchase and utilize portable
classrooms.
The District currently uses a total of 16 dual classroom portables and 1 single room portable. Of
the 16 dual classroom portables (32 teaching stations), 16 teaching stations are used for basic
education instructional classrooms. Table 4 identifies the total number of portables at
elementary, middle and high school sites distinguishing between the number that are used to
provide interim capacity (as teaching stations) and those are used for special programs or to
address other educational needs.
Table 4: Portables Inventory
Number of Number of
Facility Type Number of Portables Classrooms Used as Students Housed
Number of Classrooms in Portable
Teaching Stations Classrooms
Elementary Schools 9 Portables 10 teaching stations 230
18 Classrooms
Middle Schools 5 Portables 9 teaching stations 225
9 Classrooms
High Schools 0 0 0
Other (Excelsior) 2 Portables 3 teaching stations 69
4 Classrooms
TOTAL 16/31 22 524
7
C. Support Facilities
In addition to schools, the District owns and operates additional facilities that provide special
programs and operational support functions to the schools. An inventory of these facilities is
provided in Table 5.
Table 5: Support Facility Inventory
Facility Location
Community Education Center 630 24th Street
Washougal, WA 98671
Administrative Service Center 4855 Evergreen Way
Washougal, WA 98671
Maintenance Facility/ 4855 Evergreen Way
Warehouse Washougal, WA 98671
Fishback Stadium 1201 39th Street
Washougal, WA 98671
Transportation Facility 995 E Street
Washougal, WA 98671
Transportation Facility North 9731 Washougal River Rd.
Washougal, WA 98671
IV. STUDENT ENROLLMENT PROJECTIONS
A. Existing Enrollment
The District's enrollment by grade level in October 2014 was 3,104 students. Of the 3,104
students, 1,399 were enrolled in elementary schools, 741 were enrolled in middle schools and
964 were enrolled in high schools.
B. Projected Student Enrollment 2015-2020
The District's six-year enrollment projections are based on a report from OSPI Report 1049. The
following table shows existing enrollment and the District's six-year enrollment forecast by grade
level bands. As reflected in Table 6, the District is forecasting an increase of 199 elementary
students, 50 middle school students and 36 high school students.
Table 6: Enrollment Forecast
Grade 2014 2015 2016 2017 2018 2019 2020
Total K-5 1399 1448 1450 1,491 1531 1564 1598
Total 6-8 741 721 750 753 782 766 791
Total 9-12 964 974 994 1006 967 1004 1000
TOTALS 3104 3143 3194 3250 3280 3334 3389
V. CAPITAL FACILITY NEEDS
Capital Facility Needs are determined by existing conditions of support facilities, the need to
make improvements and expand to serve growth, and the current school capacity in light of
forecast enrollment. Table 7A below shows existing capacity at the schools, the forecast
enrollment and the facility need to serve the enrollment. Improvements that are needed at
facilities that support the schools are identified in Table 7B.
8
Table 7: Facility Needs for Schools
Facility Current Forecast Facility
Capacity Enrollment Needs
Elementary 1,300 1598 298
(K-5)
Middle 560 791 231
(6-8)
High 952 1000 48
(9-12)
To provide additional capacity for 298 elementary school students, the District will construct a
new 400 student elementary school at the Jemtegaard Middle School site. The District will
replace Jemtegaard Middle School with a new/replacement middle school that will serve 600
students. This will increase the middle school capacity by 292. Forecast growth in the high
school will be accommodated by adding portables at the high school and with the construction
of a 90 student alternative high school, which will take the place of Excelsior High School.
These planned improvements, along with other improvements at facilities that support the
schools, are listed in Table 8 below.
Table 8: Planned Im rovement and Facility Costs to Address Needs
Project Description Cost Estimate Added Capacity Capacity Added Cost for Added
to Serve Capacity **
Growth*
New Elementary $19,097,675 400 301 $14,371,000
School
New/Replacement $28,646,512 600 (292 new) 111 $5,299,604
Middle School
New/Replacement $4,507,004 90 78 $3,906,070
Excelsior High
High School $250,000 0*** 0 $0
Portables
Future School Site $2,000,000 TBD**** TBD $2,000,000
Maintenance $1,000,000 Forecast growth Forecast growth $90,000
Facility/Warehouse
Transportation $1,500,000 Forecast growth Forecast growth $135,000
Facility on Kerr
Property
Fishback Stadium $300,000 Forecast growth Forecast growth $27,000
TOTAL $57,301,191 782 490 $25,828,674
* Capacity that is added to serve growth is determined by subtracting the existing need from the total capacity
that will be provided.
** Cost for added capacity is the percentage of the total cost for the improvement that will be incurred to serve
the forecast growth. For schools it is calculated by dividing total added capacity by capacity needed for
increased enrollment and using that percentage of the total cost. For support facilities it is calculated by
dividing the forecast growth (285) by the total forecast enrollment (3389) that will be served, which is
approximately 9%and using that percent of the total cost.
*** Portables provide a temporary interim capacity and not treated as permanent facilities that add capacity.
**** Additional capacity will be determined when the type of school and capacity needs for that school are
determined.
9
To accommodate growth on a short term and immediate basis, the Washougal School
District may purchase and utilize portable classrooms and this plan incorporates those
facilities and the equipment and Furniture necessary to equip these classrooms in the
District's project list. Impact fee revenue can be available to fund portable facilities if
these facilities are needed to serve growth.
V. CAPTIAL FACILITIES FINANCE PLAN
A. Six Year Finance Plan for Planned Facility Improvements
The total cost for the above planned and needed improvements is $57,301,191. Secured
and unsecured funds for the improvements are identified in Table 9A and 9B below.
Table 9A: Secured Finance Plan
Type Amount
Impact Fees (as of 8/31/14) $401,524
Unreserved Capital Projects Funds $0
Total Secured $401,524
Table 913: Unsecured Finance Plan
Type Amount
Impact Fees $1,020,000*
a ital Projects Funds bonds and state match $57,685,000
eTotal Unsecured $58,705,000
*Unsecured impact fees are an estimate that is based on an assumption that building permits will continue to
be issued at a constant rate that is similar to that observed over the past three years and the fee amounts
being recommended are collected for the six year planning period. If there is a decrease in the number of
building permits that are issued for single family homes in the District, or the impact fee amounts are
decreased,the District will collect less impact fees, if there is an increase in the number of building permits
that are issued or an increase in the impact fee amounts,the District will collect more impact fees.
B. Financing Sources
The cost for all the planned improvements will be paid for with a combination of voter
approved bonds, state match and school impact fees, which are described below. If there is
insufficient revenue using these funding sources, the District may have to use its general
fund to pay for the facilities that are needed. A summary of the funding sources is below.
1. General Obligation Bonds
In February, 2015 the District voters approved a $57,000,000 bond. A 60% majority vote is
required to approve the issuance of the bonds. Bond proceeds are placed in the Capital
Projects Fund and are used to pay for the facility improvement costs identified in the ballot
measure and set forth in this CFP. The bond is retired through collection of property taxes.
2. State Match Funds
State Match Funds primarily come from the Common School Construction Fund, which is
administered by OSPI. The District may receive state match for a portion of eligible costs to
rebuild and expand Jemtegaard Middle School. The amount of funds is based on a state
10
prioritization schedule, a formula in state regulations and the District's assessed valuation
per student. The District is eligible for 59.76% state match.
3. Impact Fees
Impact fees are a means of supplementing traditional funding sources for
construction of public facilities needed to accommodate new development. School
impact fees are generally collected by the permitting agency at the time plats are
approved or building permits are issued. They are calculated as described below.
VI. SCHOOL IMPACT FEES
The Growth Management Act (GMA) authorizes local jurisdictions to collect impact fees to
supplement funding of additional public facilities needed to accommodate new development.
Local jurisdictions in Clark County have adopted impact fee programs that require school districts
to prepare and adopt Capital Facilities Plans. Impact fees are calculated in accordance with an
established formula, which is based on school facility costs to serve new growth.
The District's impact fees have been calculated utilizing the formula in the Clark County and the
City of Washougal Impact Fee Ordinance. The resulting figures in the attached Appendix A, are
based on the proportionate share of the costs to build a new elementary and middle school to
serve growth. Credits have also been applied in the formula to account for State Match funds the
District could receive and projected future property taxes that will be paid by the owners of the
dwelling units.
Amount of School Impact Fees:
Single Family: $5,600
Muiti-Family: $5,800
Appendices
Appendix A Impact Fee Calculation
Appendix B District SEPA documents for CFP
11
WASHOUGAL SCHOOL DISTRICT 112-6
RESOLUTION NO. 2014-15-09
Capital Facilities Plan
WHEREAS,the Clark County Planning Commission requires school districts to update their 6-
year Capital Facilities Plans every three years, and
WHEREAS, the Washougal School District has assessed future needs for capital facilities
improvements for 2015-2021,
THEREFORE, BE IT RESOLVED, the Board of Directors of Washougal School District,
Clark County, Washington,hereby do approve this Capital Facilities Plan, 2015-2021.
DATED this 26'h day of May 2015.
n Di ni s, President Elaine Pfeifer,Vieezwesidenr
J
Karen Rubino Teresa L
Bruce Westfall n,. Dawn Tarzian, Boa ecre
f _ 1
Washougal School District
2015 Impact Fee Calculation APPENDIX A
�o
S.1F=[CS(SF)—(SM)—((] xA_4VxTLR'� x-4—FC
J
Single Family Residence:
Elementary Middle School Hlgh School Formula
$14,371,000.00 $5,299,604.00 $3,906,070.00 Facility Cost
301 111 78 Additional Capacity
$47,744.19 $47,744.18 $50,077.82 Cost per Student(CS)
0.147 0.077 0.080 Student Factor(SF)
$7,018.40 $3,676.30 $4,006.23 CS x SF
$200.40 $200.40 $200.40 Boeck Index
90.00 117.00 130.00 OSPI Sq Ft
59.76% 59.76% 59.76% State Match Eligibility%
$1,584.41 $1,078.91 $1,245.49 State Match Credit 1'+`,'!
$5,433.98 $2,597.39 $2,760.73 CS x SF-SM
$10,792.11 Cost per Single Family Residence
0.00356 Average Interest Rate
0.03617576 Tax Credit Numerator
0.003688786 Tax Credit Denominator
9.806956251 Tax Credit Multiplier(TCM)
$256,643.00 Average Assessed Value(AAV)
2516886.67 TCM x AAV
0.00157 Tax Levy Rate(TLR)
$4.203.20 TCM x AAV x TLR- t f r-1
$6,588.91 Cost per Single Family Residence-Tax Credit
$988.34 15%reduction;
$5,600.57 Calculated Single Family Fee Amount
$5,600 Recommended Fee Amount
Multi-Family Residence:
Elementary Middle School High School Formula
$14,371,000.00 $5,299,604.00 $3,906,070.00 Facility Cost
301 111 78 Additional Capacity
$47,744.19 $47,744.18 $50,077.82 Cost per Student
0.165 0.089 0.087 Student Factor r4:F
$7,877.79 $4,249.23 $4,356.77 CS x SF
$200.40 $200.40 $200.40 Boeck Index
90.00 117.00 130.00 OSPI Sq Ft
59.76% 59.76% 59.76% State Match Eligibility%
$1,778.42 $1,247.05 $1,354.47 State Match Credit
$6,099.37 $3,002.18 $3,002.30 CS x SF-SM
$12,103.85 Cost per Multi-Family Residence
0.00356 Average Interest Rate
0.03617576 Tax Credit Numerator
0.003688785 Tax Credit Denominator
9.806956251 Tax Credit Multiplier(TCM)
$55,262.00 Average Assessed Value(AAV)
541952.02 TCM x AAV
0.00167 Tax Levy Rate(TLR)
$905.06 TCM x AAV x TLR=(TC)
$11,198.79 Cost per Multi-Family Residence-Tax Credit
$1,679.82 15%reduction:. s
$9,518.97 Calculated Multi-Family Fee Amount
$5,800 Recommended Fee Amount