ORD 15-026 ORDINANCE NO , 15 - 026
AN ORDINANCE approving and adopting by reference the text of
that certain document entitled Camas School District Capital Facilities Plan
2015 -2021 .
WHEREAS , the Camas School District has submitted an amended capital facilities plan
entitled " Camas School District Capital Facilities Plan 2015 -2021 " to the City for its review and
approval , and
WHEREAS , the Council has considered said capital facilities plan and has conducted a
public hearing , and desires to adopt the same as the capital facilities plan for the Camas School
District,
NOW, THEREFORE , BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
CAMAS AS FOLLOWS :
Section I
The Council hereby approves and adopts by reference a volume of text entitled " Camas
School District Capital Facilities Plan 2015 -2021 " as the amended capital facilities plan of the
school district, which shall provide the basis for the collection of school impact fees by the City
on behalf of the school district .
Section II
A copy of the Camas School District Capital Facilities Plan 2015 - 2021 shall be
maintained in the council file on these proceedings , and copies of said Capital Facilities Plan
shall be made available for public inspection at the Public Works Department ,
Section III
t
Ordinance No . 15 - 026 Page - 2
This ordinance shall take force and be in effect five ( 5 ) days from and after its publication
according to law .
PASSED by the Council and APPROVED by the Ma or is 2 st day of December, 2015 .
SIGNED :
M or
ATTEST : PML C � --
Clerk
APPROVED as to form :
City Attorney
CAMAS SCHOOL DISTRICT
CAPITAL FACILITIES PLAN
2015 - 2021
�j}� yy•
3A-tr.n•v[� j�.4,E_. 3t gd M�j i w' %. � r ���i g ikR/.ppr ,fir-,,�'=RL r
Board of Directors
District I Casey O'Dell
District II Julie Rotz
District III Connie Hennessey
District IV Douglas Quinn
District V Mary Tipton
Superintendent
Mike Nerland
May 2015
SECTION 1
INTRODUCTION AND SUMMARY
A. Introduction
The Washington State Growth Management Act (the "GMA") includes schools in the category of public
facilities and services. School districts are required by the Cities of Camas, Washougal, and Vancouver
("Cities") and Clark County("County") to adopt capital facilities plans at least every four years to satisfy
the requirements of the GMA and to identify additional school facilities necessary to meet the
educational needs of projected enrollment growth for a six-year period.
The Camas School District ("District") has prepared the 2015 Capital Facilities Plan ("CFP") to provide
the Cities and the County with a schedule and financing program for capital improvements over the
next six years (Oct. 1, 2015 through Oct. 1, 2021) to maintain a 6 year adoption cycle. The 2015 CFP
includes the following elements:
• The District's standard of service (Section 2)
• An inventory of existing capital facilities owned by the District, including functional capacities and
locations (Section 3)
• Future enrollment projections for each grade span (elementary, middle, and high schools) (Section
4)
• A forecast of future needs for capital facilities and school sites, including proposed capacities of
expanded or new capital facilities and a six-year plan for financing capital facilities within projected
funding capacities, which identifies sources of money for such purposes. The financing plan
separates projects and portions of projects which add capacity from those which do not, since the
latter are generally not appropriate for impact fee funding (Section 5)
• A calculation of impact fees based on the formula in the Cities and County impact fee ordinances
and supporting data substantiating such fees (Section 6)
B. Summary
Camas is a financially and academically sound school district. The 57 square mile Camas School District
has a comprehensive and an alternative high school,two middle schools, and six elementary schools.
The District serves residents from the cities of Camas, Washougal,Vancouver and unincorporated rural
Clark County. It is bordered by Evergreen School District to the west, Hockinson School District to the
north, Washougal School District to the east, and the Columbia River and the state line to the south.
The overall October 1, 2014 enrollment (head count) for the District was 6,566 students. Of the total
enrollment, 2,777 are elementary students, 1,648 are middle school students,and 2,141 are high
school students. When reduced by the number of special education students in self-contained
classrooms, the enrollment counts are 2,558 elementary, 1,420 middle, and 1,850 high school
students, for a total of 5,828 students in standard basic education classrooms. Special education
students in self-contained classrooms and spaces for these programs have been extracted for
corresponding school capacity calculations.
School facility and student capacity needs are dictated by a complex matrix of regulatory mandates,
educational program components, collective bargaining agreements, and community expectations,
Camas School District#117 2 2015 Capital Facilities Plan
more fully described in Section 2. The District's existing capital facilities are summarized in Section 3.
In addition, the district owns 16 portable classrooms located at school facilities, housing approximately
6.3%or 412 students. The remaining 12 portable classrooms are used for support services such as art,
rainy day activities and special education.
Between 2007 and 2014, enrollment growth within the District grew by 2.2% per year, compared to
the countywide rate of 0.6%. A total of 923 students were added to Camas School District during that
time. Although there had been a general leveling off of enrollment during the recent economic
downturn, the District expects to continue to see an increase in enrollment over time. Much of the
land within district and urban growth boundaries has yet to be developed, and there continues to be
market interest in housing development in Camas and Washougal. Future K-12 enrollment is projected
to increase by an average 2.1% per year, or 1,048 students over the next 7 years (see Section 4). The
projected number of students minus current capacity equals a projected capacity need for 175 middle
school and 612 high school students by 2021. Elementary school capacity is sufficient to accommodate
the projected growth.
The calculated maximum allowable impact fees for the District are $5,371.85 per single family
residence and $10,336.11 per multi-family residence (Appendix A).
Camas School District#117 3 2015 Capital Facilities Plan
SECTION 2
DISTRICT EDUCATIONAL PROGRAMS AND STANDARD OF SERVICE
School facility and student capacity needs are dictated by the types and amounts of space required to
accommodate the District's educational program. The educational program components which drive
facility space needs include grade configuration, optimum facility size, class size, educational program
offerings, classroom utilization and scheduling requirements, and use of modular classrooms
(portables).
In addition to student population, other factors such as collective bargaining agreements, government
mandates, and community expectations also affect classroom space requirements. In addition to basic
education programs, other programs such as special education, bilingual education, pre-school, and art
and music must be accommodated. These programs can have a significant impact on the available
student capacity of school facilities.
The District educational program guidelines, which directly affect school capacity are outlined below
for elementary, middle, and high school grade levels.
• Elementary Schools: Average class size for elementary classrooms is estimated at 24 students. The
actual number of students in an individual classroom depends on the above factors. Elementary
school capacity is calculated utilizing only classroom spaces containing a basic education teacher
and his/her complement of students. Students may be pulled out to attend additional programs
(which may also be held in classrooms, if there is no designated space available). Working building
capacity calculations do not include classrooms used for these special programs, such as resource
rooms, learning support centers, computer labs, and self-contained special education classrooms.
• Middle Schools: Average class size for middle school classrooms is estimated at 30 students. The
actual number of students in an individual classroom depends on the above factors. Middle school
capacity is calculated utilizing the number of basic education teaching stations and applying a
utilization factor of 85%. Working building capacity calculations do not include classrooms used for
resource rooms, computer labs, and self-contained special education classrooms.
• High Schools: Average class size for middle and high school classrooms is estimated at 31 students.
The actual number of students in an individual classroom depends on the above factors. High
school capacity is calculated utilizing the number of basic education teaching stations and applying
a utilization factor of 85%. Working building capacity calculations do not include classrooms used
for resource rooms, computer labs, and self-contained special education classrooms.
Camas School District#117 4 2015 Capital Facilities Plan
SECTION 3
CAPITAL FACILITIES INVENTORY
This section provides a summary of capital facilities owned and operated by the District including
schools, modulars, undeveloped land, and support facilities.
A. Elementary Schools
Elementary Location YearofBuilding Capacity
SchoolOccupancy SF Stations
Dorothy Fox 2623 NW Sierra St Camas WA 1982/2000/2011 62,237 576 24
(K-5) 98607
Grass Valley 3000 NW Grass Valley Dr 2009 70,023 600 25
(K-5) Camas WA 98607
Helen Baller 1954 NE Garfield St Camas WA 2009 64,417 576 24
(K-5) 98607
Lacamas 4600 NE Garfield St Camas WA 1964/1997/2008/ 42,757 408 17
Heights 98607 2013
(K-5)
Prune Hill 1602 NW Tidland St Camas WA 2001 59,130 480 20
(K-5) 98607
Woodburn 2400 NE Woodburn Dr 2013 72,857 600 25
(K-5) Camas WA 98607
TOTALS: 1 1 369,989 3,240 110
Note: capacity includes full day kindergarten
B. Middle Schools
Middle • • of Occupancy Building SF Capacity
School
Liberty 1612 NE Garfield St 1937/1952/1969/1985/ 121,047 892 Stations35
(6-8) Camas WA 98607 1995/2006
Skyridge 5220 NW Parker St 1996 112,133 790 31
(6-8) Camas WA 98607
TOTALS: 233,180 1,682 65
Note: capacity includes a utilization factor of 85%
C. High Schools
High School Location Year of Building SF Capacity Teaching
Occupancy Stations
Camas 26900 SE 15th St Camas 2003/2011 241,621 1,792 68
(9-12) WA 98607
Hayes Freedom (9- 1919 NE Ione St Camas 2010 20,500 211 8
12) WA 98607
TOTALS: 1 1 262,121 2,003 76
Note: capacity includes a utilization factor of 85%
Camas School District#117 5 2015 Capital Facilities Plan
D. Portables Inventory
ClassroomsFacility Type No. of No. of Portable Classrooms used as Interim
Portable Interim Teaching Stations Capacity
Elementary Schools 14 2 48
Middle Schools 6 6 153
High Schools 8 8 211
TOTALS: 28 16 412
E. Support Facilities
•- Location
Grounds Shop, Bus Maintenance and 1707 NE Ione St
Warehouse (1963/2001) Camas WA 98607
Transportation Center (2001/2012) 1125 NE 22nd Ave
Camas WA 98607
JD Zellerbach Administration Center 841 NE 22nd Ave
(1967/1974/1985/1998/2010) Camas WA 98607
Community Education Center(same as above) 841 NE 22nd Ave
Camas WA 98607
Jack, Will & Rob Center (2001) 2033 NE Ione St
Camas WA 98607
Transition House (remodeled 2009) 612 NE 2nd Ave
Camas WA 98607
F. Land Inventory
The district owns the following under-and undeveloped sites:
• 48.7 acres located south of 15th Street and east of NE Ione Street, Camas, WA 98607—site
unsuitable for education purposes, declared surplus and is currently for sale.
• 0.9 acres located at 918 NW Hill Street, Camas, WA 98607—former Armory site, under-utilized
for education purposes, currently leased as a gymnastics center.
Camas School District#117 6 2015 Capital Facilities Plan
SECTION 4
STUDENT ENROLLMENT PROJECTIONS
The District enrollment forecast was most recently updated by Paul Dennis, AICP of the Cascade
Planning Group in December 2014.
The approach used in making the updated enrollment forecast included the following:
• Kindergarten (K) enrollment is forecast based on population of each school area (and expected
population growth) together with birth rate data from five years previous using an age-cohort
methodology. Data required for the K-level forecast includes projections of population growth,
women of childbearing age and age-specific fertility rates.
• Actual enrollment patterns from prior years are used as a basis for projecting future enrollment for
grades 1-12. For example, the number of students in a particular grade as of October 1, 2014 are
promoted into the next grade level for 2015 (adjusting for expected population growth together
with gains or losses typically associated with a particular grade-to-grade change for each grade
level at each individual school).
• The 2014/2015 school year enrollment is based on the October 1, 2014 enrollment data.
• Economic growth impacts, land use and zoning provisions, buildable lands inventory, and new
residential developments are taken into account.
A. Projected Enrollment 2015-2021 (Headcount)
.•- A2016ctual 2015 2017 2018 2019 2020 2021
2014
K-5 2,777 2,809 2,869 2,856 2,939 2,996 3,061 3,142
6-8 1,648 1,678 1,689 1,757 1,765 1,833 1,788 1,857
9-12 2,141 2,200 2,276 2,387 2,470 2,500 2,643 2,615
TOTALS: 6,566 6,687 6,834 7,000 7,174 7,329 7,492 7,614
Camas School District#117 7 2015 Capital Facilities Plan
SECTION 5
CAPITAL FACILITY NEEDS
Projected facility capacity is derived by subtracting the 2021 projected student enrollment from the
2014 school facility capacity. The resulting deficit is used to determine facility needs.
A. Projected Facility Capacity Needs
•- of Facility 20141 Projected 2021 Facility
Capacity Enrollment -•
Elementary 3,240 3,142 NA
Middle 1,682 1,857 175
High 2,003 2,615 612
The district will add four (4) portable classrooms to address the increase in high school enrollment for
the 2015-16 school year. In February 2016, the district plans to propose to voters a bond to address
future capacity needs.
B. 6-Year Plan—Facility Capacity Needs
Project Description Added Estimated Cost Cost for Added
Capacity Capacity • Serve
Growth
High School Expansion 800 $50,723,000 $38,803,095
K-5 Replacement 150 $33,697,464 $8,424,366
a 6-8 900 $55,546,000 $10,775,924
Property Acquisition 600 $5,000,000 $5,000,000
Transportation—Bus $690,000 $690,000
s
Parking Lot
K-5 New 600 $33,697,464 N/A
TOTAL: 2,450 $179,353,928 $63,693,385
The additional 612 projected high school students can be accommodated by the construction of a new
800 student facility.The additional 175 middle school students could be accommodated by adding a
900 student facility. In addition,the District proposes the use of portable classrooms purchased with
impact fees to handle short-term capacity needs.
Camas School District#117 8 2015 Capital Facilities Plan
C. Six-Year Financing Plan
Facility Capacity Total -• Impact Fees State Match Fundsi• •
--•
Secured $400,000 $400,000 0 0
Unsecured $150,000,000 $2,000,000 $8,000,000 $140,000,000
General Obligation Bonds
Bonds are used to fund site acquisition, construction of new schools, and other capital improvement
projects. A 60% majority vote is required to approve the issuance of bonds. Bonds are then retired
through collection of property taxes.
State Match Funds
State Match funds primarily come from the Common School Construction Fund (the "Fund"). School
districts may qualify for State Match funds for specific capital projects based on eligibility requirements
and a state prioritization system. Based on the District's assessed valuation per student and the
formula in the State regulations, the District is currently eligible for State Match funds for new schools
at the 63.26% match level.
Impact Fees
The collection of school impact fees generates partial funding for construction of public facilities
needed to accommodate new development. School impact fees are collected by the Cities and County
on behalf of the District. Impact fees are calculated based on a formula, which includes the portion of
District construction resulting in increased capacity in schools.
Camas School District#117 9 2015 Capital Facilities Plan
SECTION 6
SCHOOL IMPACT FEES
The Growth Management Act (GMA) authorizes local jurisdictions to collect impact fees to supplement
funding of additional public facilities needed to accommodate new development.
Local jurisdictions in Clark County have adopted impact fee programs that require school districts to
prepare and adopt Capital Facilities Plans. Impact fees are calculated in accordance with the
jurisdiction's formula, which is based on school facility costs to serve new growth.
The District's impact fees have been calculated utilizing the formula in the Clark County and the Cities
of Camas, Washougal, and Vancouver Impact Fee Ordinances. The resulting figures, in the attached
Appendix A and paragraph below are based on the District's cost per dwelling unit to build the new
facilities which add capacity that is needed to serve new development. Credits have also been applied
in the formula to account for State Match funds the District receives and projected future property
taxes that will be paid by the owner of the dwelling unit.
The calculated maximum allowable impact fees are:
$5,371.85 per single family residence
$10,336.11 per multi-family residence
The District Board of Directors, at its May 26, 2015 meeting, recommends collecting school impact fees
in the following amounts:
$ 5,371.00 per single family residence
$ 5,371.00 per multi-family residence
Camas School District#117 10 2015 Capital Facilities Plan
Camas
2015 Impact Fee Calculation APPENDIX A
SIF= CS(SF)-(SM)- �1+i) -I .AAVxTLR xA-FC
i(l+i�10
Single Family Residence:
Elementary Middle School High School Formula
$0.00 $55,546,000.00 $50,723,000.00 Facility Cost
150 900 800 Additional Capacity
$0.00 $61,717.78 $63,403.75 Cost per Student(CS)
0.297 0.159 0.136 Student Factor(SF)
$0.00 $9,813.13 $8,622.91 CS x SF
$200.40 $200.40 $200.40 Boeck Index
90.00 117.00 130.00 OSPI Sq Ft
63.74% 63.74% 63.74% State Match Eligibility%
$0.00 $0.00 $2,258.35 State Match Credit(SM)
$0.00 $9,813.13 $6,364.56 CS x SF-SM
$16,177.68 Cost per Single Family Residence
0.00356 Average Interest Rate
0.03617576 Tax Credit Numerator
0.003688786 Tax Credit Denominator
9.806956251 Tax Credit Multiplier(TCM)
$338,448.00 Average Assessed Value(AAV)
3319144.73 TCM x AAV
0.00297 Tax Levy Rate(TLR)
$9,857.86 TCM x AAV x TLR=(TC)
$6,319.82 Cost per Single Family Residence-Tax Credit
$947.97 15%reduction(A)
$5,371.85 Calculated Single Family Fee Amount
$5,371.00 Recommended Fee Amount
Multi-Family Residence:
Elementary Middle School High School Formula
$0.00 $55,546,000.00 $50,723,000.00 Facility Cost
150 900 800 Additional Capacity
$0.00 $61,717.78 $63,403.75 Cost per Student(CS)
0.338 0.185 0.123 Student Factor(SF)
$0.00 $11,417.79 $7,798.66 CS x SF
$200.40 $200.40 $200.40 Boeck Index
90.00 117.00 130.00 OSPI Sq Ft
63.74% 63.74% 63.74% State Match Eligibility%
$0.00 $2,764.82 $2,042.48 State Match Credit(SM)
$0.00 $8,652.97 $5,756.18 CS x SF-SM
$14,409.14 Cost per Multi-Family Residence
0.00356 Average Interest Rate
0.03617576 Tax Credit Numerator
0.003688786 Tax Credit Denominator
9.806956251 Tax Credit Multiplier(TCM)
$77,215.00 Average Assessed Value(AAV)
757244.13 TCM x AAV
0.00297 Tax Levy Rate(TLR)
$2,249.02 TCM x AAV x TLR=(TC)
$12,160.13 Cost per Multi-Family Residence-Tax Credit
$1,824.02 15%reduction(A)
$10,336.11 Calculated Multi-Family Fee Amount
$5,371.00 Recommended Fee Amount
CAMAS SCHOOL DISTRICT 117
RESOLUTION 1411
CAPITAL FACILITIES PLAN 2015-2021
A Resolution of the Board of Directors (the "Board") of the Camas School District No.
117 (the "District") to adopt a Capital Facilities Plan (the "Plan") for school facilities
conforming to requirements of the State Growth Management Act and the Clark County
General Policy Plan.
WHEREAS, Districts are required to update their Capital Facilities Plan every six years in
compliance with RCW 36.70A(the Growth Management Act);and
WHEREAS,this Plan update was developed by the District in accordance with accepted
methodologies and requirements of the Growth Management Act;and
WHEREAS,the proposed impact fees utilize calculation methodologies meeting the conditions
and tests of RCW 82.02;and
WHEREAS,the District finds that the Pian meets the basic requirements of RCW 36.70A and
RCW 82.02;and
WHEREAS,the District conducted a review of the Plan in accordance with the State
Environmental Policy Act,state regulations implementing the act,and District policies and procedures;
NOW,THEREFORE BE IT RESOLVED as follows:
1. The 2015 Capital Facilities Plan for the years 2015-2021 is hereby adopted by the District.
2. The Clark County Board of Commissioners is hereby requested to adopt the Plan by reference
as part of the capital facilities element of the County's General Policy Plan.
3. The Cities of Camas,Washougal,and Vancouver are hereby requested to adopt the Plan by
reference as part of the Capital Facilities Plan element of their respective General Policy
Plans.
ADOPTED,this 26th day of May 2015 at the Regular Meeting of the Board of Directors for
Camas School District 117.