Loading...
RES 19-008RESOLUTION NO. 19-008 A RESOLUTION revising and extending the Comprehensive Street Program for an additional six (6) years. WHEREAS, pursuant to the requirements ofRCW 35.77.010, the City of Camas did, by Resolution No. 18-005 adopt a Comprehensive Street Program for the ensuing six (6) years; and WHEREAS, said law requires the City revise and extend said Comprehensive Street Program annually; and WHEREAS, pursuant to said law, the City Council of the City of Camas being the legislative body of said City did hold a public hearing on said revised Comprehensive Plan at 7:00 p.m. at the Camas Municipal Center in Camas, Washington, on the 3rd day of June, 2019; and WHEREAS, there were no written or oral objections to the revised Comprehensive Plan as prepared by the City of Camas relative to the street program for the ensuing six ( 6) years within the City of Camas. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAMAS AS FOLLOWS: I The Comprehensive Street Program heretofore adopted and revised by the City Engineer for the City of Camas, as submitted to the City Council for the City of Camas, be and the same is hereby adopted and extended for an additional six (6) year period from the date thereof. II The City Clerk shall file a copy of said revised Comprehensive Street Program for the ensuing six (6) years, together with a copy of this Resolution, with the Secretary of Transportation of the State of Washington. Resolution No. 19-008 Page2 PASSED by the Council and APPROVED by the Mayor this 17th day of June, 2019. Mayor ATTEST: ~~/1 ---+----""'"'~~Cle -~ .\--------\ APPROVED as to form: City Attorney Washington State Department of Transportation Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. MPO/RTPO: RTC City No.: 0145 ~ ~ Project ldentifiontion ~ A Pin/Project No. B. STIP ID a C. ProjectTiUe -~ ·f D. Road Name or Number & ·§ E. Begin & End Temtlni 0. F. Project Description G. Structure ID I 2 3 Lake Roat! & Everell Intersection improvements 16 I from: to: SR-500 (Everett StJRd.) NW Lake Rd. to SE 4th St. 16 2 from: to: Widen with bike Junes, sidewalks, illumination New North Shore EIW Arterial NE 14th St. to Everett Rd. 16 3 from: to: New constructiori. Includes Critical Areas and Aligmnent Investigation NE JrdAve11ue WaxliougalRiver Brirlge 02 4 from: to: Seismic rating, scour critical, and footing rehabilitation ADA Access Upgrades 14 5 from: Citywide to: (Ongoing) NE 91lt Slreel NE 232nd Ave. to NE 242nd Ave. 00 6 from: to: Newconstnwtion Includes Critical Areas and Alignment Investigation ReportDate: 6/5/2019 ii ~~ }~ 4 03 03 01 14 28 15 ~ l ] j 1l ,.., u 0. Phase Start s p 11 Federal Fund "' (yyyy) ~ § ! Code 5 6 7 8 9 10 RW 1/1/2020 CN 611/2020 p 0.00 Totals ALL I 6/1/20211 p I.OS Totals ALL I 6/1/20221 p 2.00 Totals RW I 8/l/201rR CN 6/1/2020 BR s 00 Totals ALL I 1/1120201 p 0.00 Totals PE I 6/1120231 p 0.50 Totals Six Year Transportation Improvement Program FROM: 2020 TO: 2025 Hearing Dute: 6/3/2019 AdoptionDate: 6/17/2019 Amend Date: Resolution No: ---------- Project Costs in Thousands ofDollnrs Federally Funded Fund Source Information Expenditure Schedule (Local Agency} Projects Only State Fund Envir, RIW Federal Funds State Funds LocalFtmds Total Funds Code 1,t 2nd Jed 4th thru6th Typo Required 11 12 13 14 15 16 17 18 19 20 21 100 JOO 100 5865 5865 YES 0 0 0 5965 100 5965 0 0 0 I IOthoc I 110001 30001 140001 I 10001 20001 11000 0 0 11000 3000 14000 0 1000 2000 llOOO I IOthoc I 120001 36501 156501 I I 20001 13650 0 0 12000 3650 15650 0 0 2000 13650 I 6~1 I I IOI 701 7~1 4101 I 1410 1000 NO 0 1470 0 10 70 1070 410 0 0 I I I I 3001 3001 501 501 501 150 NO 0 0 0 300 300 50 50 50 150 I I I I 2181 2181 I I I 218 0 D 0 218 218 0 0 0 218 Page I of!O Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. MPO/RTPO: RTC City No.: 0145 a j Project Identification A. Pin/Project No. B. STIP ID l C. Project Title lg D. Road Name or Number § @ E. Begin & End Termini "' " F. Project Description G. Structure ID 1 2 3 Lake Road NW Lacamns Lane to NE Everett 16 7 from: lo: Widening. sidewalk NW Lake Road @NW Sierra St. 16 8 from: to: Trnfficsignal NW 18th Ave., et al. Path NW Astor to NW 16th, include NW Hood 16 9 from: to: Pedestrian Path NE Goodwin Road/28tli Street NW C11m11s Me11dows Dr. to NE 232nd Ave. 17 10 from: to: Widen to 5 lllnes with bike l11nes west of Ingle Widen to 3 Innes with bike lanes east of Ingle NE Goothvi1t Road @NE Ingle Rd. 17 11 from: to: Trnffksignal Crown Rout/ 16 12 from: SE 23rd St. to NE 3rd Ave. Multimodal tum lanes and intersection improvements Report Date: 6/5/2019 h J ,g ~ il 8 e~ ~ Phase Start bl ~ g l Federal Fund (yyyy) J :g Code 4 5 6 7 8 9 10 ALL 6/1/2022 03 p 0.45 Totals ALL I 1/1/20221 24 p 00 Tofals ALL I 111/20221 28 p 0.40 Totals ALL I 1111202TTP(U1 15 p l.72 Totals PE I 6/1/20221 15 p 00 Totals ALL I 111/20221 04 p 1.3 Totals FROM: 2020 TO: 2025 HearingDnte: 6/3/2019 Adoption Date: 6/17120 t 9 Amend Date: Resolution No: Project Costs in Thousands of Dollars Federally Funded Fund Source Information Expenditure Schedule (Local Agency) ProjectsOnlv Federal Funds State Fund State Funds Local Funds Tota!Fnnds Envir. FJW Code J,t 2nd 3rd 4th thru 6th Typo Required 11 12 13 14 15 16 17 18 19 20 21 3475 3475 3475 YES 0 0 0 3475 3475 0 0 3475 0 I I I 3501 3501 I I I 350 NO 0 0 0 350 350 0 0 0 I I I 2501 2501 I I 501 200 YES 0 0 0 250 250 0 0 50 I 688010THER I 76001 6381 20861 I I I 20860 CE YES 0 6880 7600 6380 20860 0 0 0 20860 I I I I I I I I 5 0 0 0 5 5 0 0 0 5 I I I I 20001 20001 I I 2001 1800 YES 0 0 0 2000 2000 0 0 200 1800 Page 2of10 Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. MPO/RTPO: RTC CityNo.: 0145 ~ il Project Identification 1 A. Pio/Project No. B. STIP ID ~ C. Project Title z .Jg' D. RoadNameorNumber .,, !l ·@ E. Begin & End Termini '" '" F. Project Description G. Structure ID I 2 3 SR-14 West Camas S/011gl1 Brirlge 12 13 from: to: Widen lo 4 lanes NOTE: PE phase begnn 1/2006 Bybee Road Realignmenl SE 15th St. lo SE 20th St. 17 14 from: to: New construction NW/NE 6tlt A vetrue Corridor Improvements NVl Norn·ood to NE Garfield 14 15 from: to: Access and multimod11l upgrades NW38tltA1•e1me NW Parker to Grass Valley Pnrk 16 16 from: ID: Widening.. bike Innes NW 23rd Avem1e Nw Astor to NW Sierra 17 17 from: to: Widening, sidewalk NW Leadbeller Drive NW Lake Rd. to NW Fremont St. 17 l8 from: to: Sidewalk Report Date: 6/5/2019 1s ~ 0 ~ :;': ]' .... 4 03 01 24 03 04 28 ,£3 ~ ii ~ ~ ,_, Phase Start b'l 'ii g 1l FederalFtUid (yyyy) ~ el 'O' Code ,l; 5 6 7 8 9 IO ALL 1/1/2025 p 2.25 Totals ALL I l/l/20221 c s p 0.05 w G p T Totals IALL I l/!/20221 p 1.70 Totals ALL I l/l/20231 p c p 0.45 G T Totals ALL I !/l/20231 p 0.23 Totals CN I !/!/20231 p c p 0.15 T G w s Totals FROM: 2020 TO: 2025 Hearing Date: 6/3/2019 AdoptionDate: 6/17/2019 Amend Date: Resolution No: ---------- Project Costs in Thousands of Dollars Federnlly Funded Fund Source Information Expenditure Schedule (Local Agency) Projects Only State Fund Envir. RIW Federal Funds State Funds Local Funds Total Funds Code ,,, 2nd 3<d 4th thru61h Type Required ll 12 13 14 15 16 17 l8 19 20 21 WSDOT 3500 3500 3500 NO 0 0 3500 0 3500 0 0 0 3500 I I I I 16901 16901 I I 16901 YES 0 0 0 1690 1690 0 1690 0 I I I I 10001 10001 I I 10001 NO 0 0 0 1000 1000 0 0 1000 0 I I I I 40901 40901 I I I 4090 CE YES 0 0 0 4090 4090 0 0 0 4090 I I I I 5401 5401 I I I 540 YES 0 0 0 540 540 0 0 0 540 I I I I 641 641 I I I 64 NO 0 0 0 64 64 0 0 0 64 Page 3 oflO Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. MPO/RTPO: RTC City No.: 0145 6 1 Project Identification A. Pin/Project No. B. STIP ID a z C. Project Title ·1 0 D. Road Name or Number "" § E. Begin & End Termini '" p., F. ProjectDescription G. Structure ID l 2 3 NE 28th Street & NE 2.1211tl Avenlle 17 19 from: to: Intersection improvements Brady Road Mcintosh to West City Limits 16 20 from: to: Bike & Pedestrinn Improvements NW Aslor Street/NW 11th Al'eJJlle NW 16th Ave. to Mcintosh Rd. 17 21 from: to: Widening. bike lanes Includes path on Forest Home Road from Forest Home Lane to Astor Street NWJBtliAveulle, eta! NW Astor to NW 16th, include NW Hood 16 22 from: to: Widen curb, sidewalk NWJ8tliAve1111e NW Whitnum SL to NW Brndy Rd. 16 23 from: to: New construction with bike lanes NW 18th Avenue NW Whitman St. to West City Limits 16 24 from: to: Widening, bike lanes ReportDate; 6/5/2019 ~g ~ 0 }$ 4 24 04 03 03 01 03 ,, .g tl ~ 1l ,.., 8 Phase Start i'.l ~ g ~ (yyyy) Federal Fund {l l Code 5 6 7 8 9 10 ALL 6/1/2023 p 0.00 Totals PE I 111/20241 p .50 Totals PE I 1/1/2023:1 p RW 1/1/2024 c CN 6/112025 p 0.62 G T Totals PE I 1/1/20231 s w p 0.51 p T c Totals PE I 1/1/20231 p G p 0.26 T c w s Totals PE I 1/1/20241 w s p 0.40 p T c G Totals FROM: 2020 TO: 2025 HearingD11te: 6/3/2019 AdoptionDate: 6/17/2(~ Amend Date: Resolution No: ---------- Project Costs in Thousands of Dollars Federally Funded Fund Source Information Expenditure Schedule (Local Agency) Pro'ectsOnl· Federal Funds State Fund State Funds Local Funds Total Funds Envir. RJW Code 1't 2nd 3,d 4ththru6th Type Required 11 12 13 14 15 16 17 18 19 20 21 165 165 165 NO 0 0 0 165 165 0 0 0 165 I I I I 51 51 I I I 5 0 0 0 5 5 0 0 0 5 I I I I 13;1 13:1 I I I 130 130 130 130 2040 2040 2040 YES 0 0 0 2300 2300 0 0 0 2300 I I I I 'I 'I I I I 5 YES 0 0 0 5 5 0 0 0 5 I I I I 51 51 I I I 5 0 0 0 5 5 0 0 0 5 I I I I 51 'I I I I 5 0 0 0 5 5 0 0 0 5 Page 4of10 Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. MPO/RTPO: RTC CityNo.: 0145 ~ ll Project Identification 1 A Piu/ProjectNo. B. STIP ID ] C. Project Title . "' D. Road Name or Number ·o § .g E. Begin & End Termini '" " F. Project Description G. SlructureID 1 2 3 NE.f3rJAwmue 17 25 from: SR-500 to: East City Limits Widen to 3 lanes with bike lanes NW 4Jnl/NW Astor-NW Sierra to NW 381/t 16 26 from: to: Widening, bike lanes NE 232mfA11enue NE 28U1 to NE 9th St. 17 27 from: to: Widen to 3 lanes with bike lanes NorJ/J Dwyer Creek Master Pltm Street "B" NW Friberg St.IS trunk to NW Lnrkspur St. 00 28 from: to: New construction NW Pay11e Street NW Lake Rd. to NW Camas Meadow11 Dr. DD 29 from: to: Widening North Dwyer Creek Muster Plun SJreeJ "A" NW Lake Rd. to NW Camas Meadows Dr. 00 30 from: to: New construction ReportDate: 6/5/2019 ~~ ~ '&: JR 4 03 03 15 15 03 t5 1 .lJ ~ a ..., 8 Phase Start tl @' Federal Fund l 1l (yyyy) " 'O' Code 0: 5 6 7 8 9 10 ALL 1/1/2025 c s p 0.36 G p T Totals PE I 1/1/20251 s p p .so c G T Totals PE I 6/1/20241 p 0,97 Totals PE I 1/1/20251 c s p 0.90 w G p T Totals PE I 1/1/20251 c G p 0.40 p T Totals PE I 1/1/20251 c s p 0.64 w G p T Totals FROM: 2020 TO: 207.S Hearing Date: 6/3/2019 AdoptionDate: 6/17/2019 Amend Date: Resolution No: ---------- Project Costs in Thousands of Dollars Federnlly Funded Fund Source Information Expenditure Schedule (Local Agenqy) Projects Only State Fund Envir. RfW Federal Funds State Funds Local Funds Total Funds Code ],t 2nd 3,d 4th tbru 6th Type R!lquired 11 12 13 14 15 16 17 18 19 20 21 2190 2190 2190 YES 0 0 0 2190 2190 0 D 0 2190 I I I I 51 51 I I I 5 0 0 D 5 5 0 0 0 5 I I I I 51 51 I I I 5 D D D 5 5 0 D 0 5 I I I I 51 51 I I I ., 0 0 0 5 5 D D 0 5 I I I I 51 51 I I I 5 0 0 0 5 5 D 0 0 5 I I I I l 51 I I I 5 0 0 D 5 5 D 0 0 5 Page5 of IO Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. MPO!RTPO: RTC CityNo.: 0145 ~ t Project Identification 0 I A. Pin/Project No. B. STIP ID ] C. Project Title b D. Road Nnme or Nmnber '" £ ·8 E. Begin & End Tem1ini '" F. Project Description G. Structure ID I 2 3 NW Mc/11tos/1 Road NW Brady Rd. to NW 11th Ave. 17 31 from: to: Widening, bike lanes NE Wootlhttm Drfrc SE 283rd Ave. to SE 15th St. 00 32 from: to: New construction Includes 23rd St. realignment SE 15th Street/Nourse Roatl 07 33 from: Camas High Sc:hool to: NE 283rd Ave. Widen to 3 Innes with bike lanes NE 18/h Street NE 192ndAve. to NE Goodwin Rd. 00 34 from: to: New construc:tion (potential alternate alignment) NE 28th Street NE 232nd Ave. to NE 242nd Ave. 17 35 from: to: Widen to 3 lanes with bike lanes NW Camas Meadows Dri1•e NE 13U1 St. to NE 18th St. 16 36 from: to: New construction (potential alternate alignment) Report Date: 6/5/2019 ii S3 ~ ~ .§ C< 4 15 OJ 15 15 15 15 '* 1 J j 8 H Phase Sta1t ~ b g Federal Fund "' (yyyy) i5 ! Code 5 6 7 8 9 JO PE l/l/2025 p G p 1.2 c T Totals ALL I 1/1/20221 c s p .70 w G p T Totals PE I 1/1/20251 c s p 0.59 w G p T Totals PE I 111/20251 p 0.67 Totals PE 1, 1/1/20251 p 0.50 Totals PE I 1/1/20251 p 0.20 Totals FROM: 2020 TO: 2025 Hearing Date: 6/3/2019 AdoptionDate: 6/1712019 Amend Date: Resolution No; ---------- Projecl Cos ls in Thousands of Dollars Federnlly Funded Fund Source Information Expenditure Schedule (Local Agency) Projects Only State Fund Envir. RfW Federal Funds State Funds Local Funds Total Funds Code J,t 2nd 3rd 4U1 thru 6th Type Required 11 12 13 14 15 16 17 18 19 20 21 5 5 5 0 0 0 5 5 0 0 0 5 I I I I 61001 61001 I I I 6100 YES 0 0 0 6100 6100 0 0 0 6100 I I I I 51 51 I I I 5 0 0 0 5 5 0 0 0 5 I I I I 51 51 I I I 5 0 0 0 5 5 0 0 0 5 I I I I 51 51 I I I 5 0 0 0 5 5 0 0 0 5 I I I I 51 51 I I I 5 0 0 0 5 5 0 0 0 5 Page6 of IO Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. MPO/RTPO: RTC CityNo.: 0145 ~ 1 Project Identification A.Pin/ProjectNo. B. STIP ID 1 z C. Project Title Jo> D. Road Name or Nmnber "§ E. Begin & End Termini § ·o '" 0. F. Proje6tDescriplion G. StrucLureID 1 2 3 NE 242ndAve1111e NE 28th St. to NE 9th St. 00 37 ti·om: to: Widen to 3 Innes with bike lane NE !11g/e. Rolltl Ext1msiou Goodwin to 232ndAve 00 38 from: to: New construction NW Marylund Street NW 19th to NW 24th 19 39 from: to: New construction NE Ne1•utla Street NE 3rd to NE 6th 19 40 from: to: Reconstrnct NE Goodwil1 Road@NW Camas Meadows Drii>e 00 41 from: to: Traflfo signal NW Pacific Rim@P11rker Street 16 42 from: to: Traffic signal ReporlDate: 6/512019 " 1~ 0 0. JR 4 15 15 01 04 24 15 .!l <l ~ j ! 8 Phase Start ~ g ~ Federal Fund ;l (vyyy) Code !-< '8' " 5 6 7 8 9 10 PE 6/1/2025 p 0.70 Totals PE I 6/1/20251 p 1.00 Totals ALL I 6/1/20251 c s p 0.25 w G p T Totals ALL I 6/1/20251 p 0.17 Totals ALL I 1/1120241 p 00 Totals PE I 1/1/20251 p 00 Totals FROM: 2020 TO: 2025 Hearing Date: 6/3/2019 AdoptionDnte: 6/1712019 Amend Date: Resolution No: ----- Project Costs in Thousands ofDollars Federally Funded Fund Source Information Expenditure Schedule (Local Agency) Projects On!· State Fund Envir. [IJW Federal Funds Code Slate Funds Local Funds Total Funds ht 2nd 3<d 4th thru 6th Type Require<l ' 11 12 13 14 15 16 17 18 lS 20 21 5 5 _ _......) 0 0 0 5 5 0 0 0 5 I I I I 51 51 I I I 5 0 0 0 5 5 0 0 0 5 I I I I 2801 2801 I I I 280 NO 0 0 0 280 280 0 0 0 280 I I I I 2801 2801 I I I 280 NO 0 0 0 280 280 0 0 0 I I I I 3501 3501 I I I 350 NO 0 0 0 350 350 0 0 0 350 I I I I 51 51 I I I 5 0 0 0 5 5 0 0 0 5 Page 7of10 Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. MPO/RTPO: RTC CityNo.: 0145 ~ " Project Identification 0 1 A Pin/Project No. B. STIP ID ] z C. ProjectTitle b D. Road Name or Number ·o & § E. Begin & End Tennini " F. Project Description G. Structure ID l 2 3 SR-500@Leadbetter Road 16 43 from: to: Access Control SR-SOO@Nm1'E/W Arterial 16 44 from: to; Intersection improvements NE 281/J Street@242nd A1•e11ue 16 45 from: to: Intersection improvements SR-500 @NE 14th Ave. 16 46 from: tr•: Controlled Access NE 232wl Al'C11tle@ll1gle Exte1tsio1t 00 47 from: to: Roundabout Pflvement Treatme11ls (muintemmce & preseriwtion) 00 48 from: lo: Overlays, surface treatments ReportDate: 6/5/2019 ~9 ~! JE-< 4 15 15 15 24 15 47 ~ i ~ z H 8 ii! Phase Start bl ~ g 1l l"YYY) Federn!Fund i5 '8' Code " 5 6 7 8 9 lO PE l/l/2025 p 00 Totals PE I 6/1/20251 p 00 Totals p 00 PE I 6/1/20251 Totals p 00 PE I 6/1/20251 Totals PE I 6/1/20251 p 00 Totals CN I 6/1/20201 p p 00 Totals FROM: 2020 TO: 2025 Heuring Date: 6/3/2019 Adoption Date: 6/1712019 Amend Date: Resolution No: ---------- Project Costs in Thousands of Dollars Fedcrnlly Funded Fund Source Information Expenditure Schedule (Local Agenc;~ ProjectsOnlr Federal Funds State Fund State Funds Local Funds Total Funds Envir. RJW Code 1't 2nd 3rd 4U1 thru 6th Type Required ll 12 13 14 15 16 17 18 19 20 21 5 5 5 0 0 0 5 5 0 0 0 5 I I I I 51 51 I I I 5 0 0 0 5 5 0 0 0 5 I I I I 51 51 I I I 5 0 0 0 5 5 0 0 0 5 I I I I 51 51 I I I 5 0 0 0 5 5 0 0 0 5 I I I I 51 51 I I I 5 0 0 0 5 5 0 0 0 5 I I I I 42001 42001 7001 7001 7001 2100 NO 0 0 0 4200 4200 700 700 700 2100 Page 8 oflO Agency: City of Camas Co. No.: 06 Co. Name: Clark Co. MPO/RTPO: RTC CityNo.: 0145 ~ " Project Identification I A. Pin/Project No. B. STIP ID 0 s C. Project Title E B' D. Road Name or Number ~ .g E. Begin & End Termini .. F. Projec:t Description G. SlrucLure ID 1 2 3 Reco11stntcts 00 49 from: Citywide to: Sidewalk Projects 00 50 from: to: Sidewalk installations Citywide Curb Ramp Projecll' 0 51 from: to: Future curb ramp installations Shared Path Improvemenll' Citywide 0 52 from: to: Safety ProjeCll' 00 53 from: to: Future safety projects Includes trnftlc revisions, NW Fargo Curve Safety Analysis Storm Grate Replacements (Bike lmproveme11Js) 00 54 from: to: Storm grate replacements for bike lane improvements ReportDnte: 6/5/2019 ~ ... ./l ]D ~ ~i j 8 Phase Start jR ~ ~ ll 0Jyyy) Federal Fund ::0 .,,, Code ,!: 4 5 6 7 8 9 10 ALL 1/112020 CDBG G w 04 p 00 Totals ALL I 111/20201 28 p 00 Totals 28 p 00 ALL I 1/1/20201 Totals 28 p 00 ALL I 111120221 Totals ALL I 111120201 21 p 00 Totals CN I 111/20201 38 p 00 Totals FROM: 2020 TO: 207.5 Hearing Date: 6/3/2019 Adoption Date: 6/17/2019 Amend Date: Resolution No: ----- Project Costs in Thousands of Dollars Federally Funded Fund Source Infonnation Expenditure Schedule (Local Agency) Projects Only Federal Funds State Fund State Funds Local Funds Total Funds Envir. flJW Code l't 2nd 3rd 4th thru 6th Type Required 11 12 13 14 15 16 17 18 19 20 21 250 1250 1500 250 250 250 750 NO 0 250 0 1250 !500 250 250 250 750 I I I I 1501 1501 251 251 251 75 NO 0 0 0 150 150 25 25 25 75 I I I I 1501 1501 251 251 251 75 NO 0 0 0 150 150 25 25 25 75 I I I I 2001 2001 I I 501 150 NO 0 0 0 200 200 0 0 50 150 I I I I 3001 3001 501 501 501 150 NO 0 0 0 300 300 50 50 50 150 I I I I 201 201 201 I I NO 0 0 0 20 20 20 0 0 0 Page 9 of IO Agency: City of Camas Co. No.: 06 City No.: 0145 Co. Name: Clark Co. MPO/RTPO: RTC ll Project Identification 1 A. Pin/Project No. B. STIP ID z C. Project Title ·f D. Road Name or Number ·8 E. Begin & End Termini p.. F. ProjectDescription G. Structure ID 2 3 Future Bike ROltJe Improvements Citywide 00 55 from: to: Future bike route improvements Street Liglt1i11g Citywide 00 56 from: to: Street Lighting Report Date: 6/5/2019 ~8 ~ 8. 1~ 4 28 21 ~ l ll ,_, ~ Phase Start ii :s B> ~ Federal Fund ~ (yyyy) !': l Code 5 6 7 8 9 IO CN 1/112020 p 00 Totals CN I 1/1/20201 p DO Totals FROM: 2020 TO: 2025 Hearing Date: 6/3/2019 AdoptionDnte: 6/17/2019 Amend Date: ____ _ Resolution No: ----- Projec~ Costs in Thousands of Dollars Federally Funded Fund Source Infonnation Expenditure Schedule (Local Agency) Projects On!' Stale Fund Envir. RfW Federal Funds State Funds Local Funds Total Funds Code ht 2nd 3rd 4th thm 6th Type Required 11 12 13 14 15 16 17 18 19 20 21 30 30 5 5 5 15 NO 0 0 0 30 30 5 5 5 15 I I I I 1201 1201 201 201 201 20 NO 0 0 0 120 120 20 20 20 20 Page 10of10 City of Camas 2020-2025 Six Year Street Priorities Lake Rd. & Everett St. Intersection lmpr SR 500 (Everett St/Rd) North Shore EastlWest Arterial Washougal River Bridge ADA Access Upgrades Citywide G) NE 9th St 7 NW Lake Rd. 8 La ke Rd. & NW Sierra St. Signal 9 16th Ave/ Hood / 18th Ave Path 10 NE Goodwin Rd/28th St 11 NE Goodwin Road/ Ingle Rd Signal 12 SE Crown Rd 13 SR 14-West Camas Slough Bridge 14 Bybee Rd 15 NW/NE 6th Ave Corridor Imp 16 NW 38th Ave (Ph 3) 17 NW 23rd Ave 18 NW Leadbetter Dr Path 19 NE 28th St & NE 232nd Ave Intersection Imp. 20 NW Brady Rd Ped & Bike Improvements 21 NW Astor St. 22 NW 16th Ave/Hood/18th Ave 23 NW 18th Ave 24 NW 18th Ave/Payne Rd 25 NE 43rd Ave 26 NW Astor St. /43rd Ave 27 NE 232nd Ave 28 Street "B " (North Dwyer Creek Area) 29 NW Payne St. 30 Street 'A' (North Dwyer Creek Area) 31 NW Mcintosh Rd 32 NW Woodburn Dr. 33 SE 15th St./Norse Rd 34 NE 18th St (192nd to Goodwin) 35 NE 28th St 36 NW Camas Meadows Dr (West) 37 NE 242nd Ave 38 NW Ingle Rd Extension 39 NW Maryland St 40 NE Nevada St. 41 NE Goodwin I Camas Meadows Signal 42 NW Pacific Rim I Parker St. Signal cartras 190424 ·XXX SiK Vear Street Plan Map 2020..2025 FINAL WASHINGTON 9. Appendices A. Six Year Form Instructions Enter name of the sponsoring agency. Heading Agency County No. City No. MPO/RTPO Enter the assigned number (see LAG Appendix 21.44). Enter the assigned number (see LAG Appendix 21.45). Enter the name of the associated MPO (if located within urbanized area) or RTPO (if located in a rural area). Enter the date of the public hearing. Hearing Date Adoption Date Resolution No. Amendment Date Enter the date this program was adopted by council or commission. Enter Legislative Authority resolution number (if applicable.) Enter the date this program was amended by council or commission. Column Number 1. Functional Classification. Enter the appropriate 2-digit code denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be one approved by FHWA.) Rural(< 5000 pop.) 01 -Interstate 02 -Principal Arterials 06 -Minor Arterials 07 -Major Collector 08 -Minor Collector 09 -Local Access Description 00-No Classification Urban (> 5000 pop.) 11 -Interstate 12 -Freeways & Expressways 14 -Other Principal Arterials· 16 -Minor Arterial 17 -Collector 19 -Local Access 1. Priority Numbers. Enter local agency number identifying agency project priority (optional). 2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route Number; (e) Beginning and Ending Termini (milepost or street names); and (f) Describe the Work to be Completed. 4. Improvement Type Codes. Enter the appropriate federal code number. SEE APPENDIX A 5. Funding Status. Enter the funding status for the entire project or phase that describes the current status. S -Project is 'selected' by the appropriate selection body and funding has been secured by the lead agency. P -Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that need to be relocated or are impacted by the construction project. C-Cable TV 0 -Other S -Sewer (other than agency-owned) W-Water G-Gas P -Power T -Telephone 8. Project Phase. Select the appropriate phase code of the project. PE -Preliminary Engineering, including Design (or Planning) RW -Right of Way or land acquisition CN -Construction only (or transit planning or equipment purchase) ALL -All Phases: from Preliminary Engineering through Construction 9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. ~ SEE APPENDIX C 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. SEE APPENDIX C 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto-calculation in the "STIP Too" program.) 16-19. Expenditure Schedule -(1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (For Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this project. (This is "required" for Federally funded projects, but may be filled in for state or locally funded projects.) EIS -Environmental Impact Statement EA -Environmental Assessment CE -Categorical Exclusion 21. R/W Certification. Click Yif Right of Way acquisition is or will be required. If yes, enter R/W Certification Date, if known. (This is "required" for Federally funded projects APPENDIX A IMPROVEMENT TYPE CODES 01 New Construction Roadway 03 Reconstruction, Added Capacity 04 Reconstruction, No Added Capacity 05 4R Maintenance Resurfacing 06 4R Maintenance -Restoration & Rehabilitation 07 4R Maintenance -Relocation 08 Bridge·, New Construction 10 Bridge Replacement, Added Capacity 11 Bridge Replacement, No Added Capacity 13 Bridge Rehabilitation, Added Capacity 14 Bridge Rehabilitation, No Added Capacity 15 Preliminary Engineering 16 Right of Way 17 Construction Engineering 18 Planning 19 Research 20 Environmental Only 21 Safety 22 Rail/Highway Crossing 23 Transit 24 Traffic Management/Engineering -HOV 25 Vehicle Weight Enforcement Program 26 Ferry Boats 27 Administration 28 Facilities for Pedestrians and Bicycles 29 Acquisition of Scenic Easements and Scenic or Historic Sites 30 Scenic or Historic Highway Programs 31 Landscaping and Other Scenic Beautification 32 Historic Preservation 33 Rehab & Operation of Historic Transp. Buildings, Structures, Facilities 34 Preservation of Abandoned Railway Corridors 35 Control and Removal of Outdoor Advertising 36 Archaeological Planning & Research 37 Mitigation of Water Pollution due to Highway Runoff 38 Safety and Education for Pedestrians/Bicyclists 39 Establishment of Transportation Museums 40 Special Bridge 41 Youth Conservation Service 42 Training 43 Utilities 44 Other 45 Debt Service 47 Systematic Preventive Maintenance 5307 5309(Bus) 5309(FG) 5309(NS) 5310 5311 5316 5317 FT A Discretionary BIA BR CBI CDBG CMAQ DEMO Discretionary-FBD Discretionary-IMO Discretionary-ITS Discretionary-PLH Discretionary-SB Discretionary-STP Discretionary-TCSP DOD FMSIB IM IRR NHS SRTS STP STP(E) STP(L) STP(S) STP(R) STP(U) APPENDIXC FEDERAL FUND CODES FTA Urbanized Area Formula Program FTA Bus and Bus Facilities FTA Fixed Guideway Modernization FT A New Starts FTA Elderly Persons and Persons with Disabilities FTA Rural Area Formula Grants FTA Job Access & Reverse Commute Program (JARC) FT A New Freedom Program Discretionary Programs such as Alternatives Analysis (5339) and TIGGER Program Bureau of Indian Affairs Bridge Replacement/Rehabilitation Program Coordinated Border Infrastructure Community Development Block Grant (Dept. of Commerce) Congestion Mitigation and Air Quality Demonstration Projects (High Priority, Sect. 112, 115, 117, 125 and 129) Ferry Boat Discretionary Interstate Maintenance Discretionary Intelligent Transportation Systems Public Lands Highways (Federal Lands) Scenic Byways Surface Transportation Priorities Transportation, Community & System Preservation Program Department of Defense Freight Mobility Strategic Investment Board Interstate Maintenance Indian Reservation Roads National Highway System Safe Routes to Schools Surface Transportation Program (WSDOT Use Only) Surface Trans. Program -Enhancements Surface Trans. Program -Legislative Earmarks Surface Trans. Program-Safety (Includes Highway) Safety Improvement Program, Hazard Elimination, Railway/Highway Crossing Program and 2010- 15 County Road Safety Program) Surface Trans. Program -Rural Regionally Selected Surface Trans. Program -Urban Regionally Selected STATE FUND CODES CRAB FMSIB PWTF SRTS TIS TPP WSDOT OTHER County Road Administration Board Freight Mobility Strategic Investment Board Public Works Trust Fund Safe Routes to Schools Transportation Improvement Board Transportation Partnerships Program WSDOTfunds Any other state funds not iisted