RES 19-008RESOLUTION NO. 19-008
A RESOLUTION revising and extending the Comprehensive Street
Program for an additional six (6) years.
WHEREAS, pursuant to the requirements ofRCW 35.77.010, the City of Camas did, by
Resolution No. 18-005 adopt a Comprehensive Street Program for the ensuing six (6) years; and
WHEREAS, said law requires the City revise and extend said Comprehensive Street Program
annually; and
WHEREAS, pursuant to said law, the City Council of the City of Camas being the legislative
body of said City did hold a public hearing on said revised Comprehensive Plan at 7:00 p.m. at the
Camas Municipal Center in Camas, Washington, on the 3rd day of June, 2019; and
WHEREAS, there were no written or oral objections to the revised Comprehensive Plan as
prepared by the City of Camas relative to the street program for the ensuing six ( 6) years within the
City of Camas.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAMAS
AS FOLLOWS:
I
The Comprehensive Street Program heretofore adopted and revised by the City Engineer for
the City of Camas, as submitted to the City Council for the City of Camas, be and the same is hereby
adopted and extended for an additional six (6) year period from the date thereof.
II
The City Clerk shall file a copy of said revised Comprehensive Street Program for the
ensuing six (6) years, together with a copy of this Resolution, with the Secretary of Transportation of
the State of Washington.
Resolution No. 19-008
Page2
PASSED by the Council and APPROVED by the Mayor this 17th day of June, 2019.
Mayor
ATTEST: ~~/1 ---+----""'"'~~Cle -~ .\--------\
APPROVED as to form:
City Attorney
Washington State Department of Transportation
Agency: City of Camas
Co. No.: 06 Co. Name: Clark Co.
MPO/RTPO: RTC City No.: 0145
~ ~ Project ldentifiontion
~ A Pin/Project No. B. STIP ID
a C. ProjectTiUe
-~ ·f D. Road Name or Number
& ·§ E. Begin & End Temtlni
0. F. Project Description G. Structure ID
I 2 3
Lake Roat! & Everell
Intersection improvements
16 I from: to:
SR-500 (Everett StJRd.)
NW Lake Rd. to SE 4th St.
16 2 from: to:
Widen with bike Junes, sidewalks, illumination
New North Shore EIW Arterial
NE 14th St. to Everett Rd.
16 3 from: to:
New constructiori.
Includes Critical Areas and Aligmnent Investigation
NE JrdAve11ue WaxliougalRiver Brirlge
02 4 from: to:
Seismic rating, scour critical, and footing rehabilitation
ADA Access Upgrades
14 5 from: Citywide to:
(Ongoing)
NE 91lt Slreel
NE 232nd Ave. to NE 242nd Ave.
00 6 from: to:
Newconstnwtion
Includes Critical Areas and Alignment Investigation
ReportDate: 6/5/2019
ii ~~ }~
4
03
03
01
14
28
15
~ l ] j 1l ,.., u 0. Phase Start s p 11 Federal Fund "' (yyyy) ~ § ! Code
5 6 7 8 9 10
RW 1/1/2020 CN 611/2020
p 0.00
Totals
ALL
I
6/1/20211
p I.OS
Totals
ALL
I
6/1/20221
p 2.00
Totals
RW
I
8/l/201rR CN 6/1/2020 BR
s 00
Totals
ALL
I
1/1120201
p 0.00
Totals
PE
I
6/1120231
p 0.50
Totals
Six Year Transportation Improvement Program
FROM: 2020 TO: 2025
Hearing Dute: 6/3/2019 AdoptionDate: 6/17/2019
Amend Date: Resolution No: ----------
Project Costs in Thousands ofDollnrs Federally Funded
Fund Source Information Expenditure Schedule (Local Agency} Projects Only
State Fund Envir, RIW Federal Funds State Funds LocalFtmds Total Funds Code 1,t 2nd Jed 4th thru6th Typo Required
11 12 13 14 15 16 17 18 19 20 21
100 JOO 100
5865 5865
YES
0 0 0 5965 100 5965 0 0 0
I
IOthoc
I
110001 30001 140001
I
10001 20001
11000
0 0 11000 3000 14000 0 1000 2000 llOOO
I
IOthoc
I
120001 36501 156501
I I
20001
13650
0 0 12000 3650 15650 0 0 2000 13650
I 6~1 I I
IOI 701 7~1 4101 I
1410 1000
NO
0 1470 0 10 70 1070 410 0 0
I I I I
3001 3001 501 501 501
150
NO
0 0 0 300 300 50 50 50 150
I I I I
2181 2181
I I I
218
0 D 0 218 218 0 0 0 218
Page I of!O
Agency: City of Camas
Co. No.: 06 Co. Name: Clark Co.
MPO/RTPO: RTC City No.: 0145
a j Project Identification
A. Pin/Project No. B. STIP ID
l C. Project Title
lg D. Road Name or Number
§ @ E. Begin & End Termini
"' " F. Project Description G. Structure ID
1 2 3
Lake Road
NW Lacamns Lane to NE Everett
16 7 from: lo:
Widening. sidewalk
NW Lake Road
@NW Sierra St.
16 8 from: to:
Trnfficsignal
NW 18th Ave., et al. Path
NW Astor to NW 16th, include NW Hood
16 9 from: to:
Pedestrian Path
NE Goodwin Road/28tli Street
NW C11m11s Me11dows Dr. to NE 232nd Ave.
17 10 from: to:
Widen to 5 lllnes with bike l11nes west of Ingle
Widen to 3 Innes with bike lanes east of Ingle
NE Goothvi1t Road
@NE Ingle Rd.
17 11 from: to:
Trnffksignal
Crown Rout/
16 12 from: SE 23rd St. to NE 3rd Ave.
Multimodal tum lanes and intersection improvements
Report Date: 6/5/2019
h J ,g ~ il 8 e~ ~ Phase Start bl ~ g l Federal Fund (yyyy) J :g Code
4 5 6 7 8 9 10
ALL 6/1/2022
03 p 0.45
Totals
ALL
I
1/1/20221
24 p 00
Tofals
ALL
I
111/20221
28 p 0.40
Totals
ALL
I
1111202TTP(U1
15 p l.72
Totals
PE
I
6/1/20221
15 p 00
Totals
ALL
I
111/20221
04 p 1.3
Totals
FROM: 2020 TO: 2025
HearingDnte: 6/3/2019 Adoption Date: 6/17120 t 9
Amend Date: Resolution No:
Project Costs in Thousands of Dollars Federally Funded
Fund Source Information Expenditure Schedule (Local Agency) ProjectsOnlv
Federal Funds State Fund State Funds Local Funds Tota!Fnnds Envir. FJW
Code J,t 2nd 3rd 4th thru 6th Typo Required
11 12 13 14 15 16 17 18 19 20 21
3475 3475 3475
YES
0 0 0 3475 3475 0 0 3475 0
I I I
3501 3501
I I I
350
NO
0 0 0 350 350 0 0 0
I I I
2501 2501
I I
501
200
YES
0 0 0 250 250 0 0 50
I
688010THER
I
76001 6381 20861 I I I
20860
CE YES
0 6880 7600 6380 20860 0 0 0 20860
I I I I I I I I
5
0 0 0 5 5 0 0 0 5
I I I I
20001 20001 I I
2001
1800
YES
0 0 0 2000 2000 0 0 200 1800
Page 2of10
Agency: City of Camas
Co. No.: 06 Co. Name: Clark Co.
MPO/RTPO: RTC CityNo.: 0145
~ il Project Identification
1 A. Pio/Project No. B. STIP ID
~ C. Project Title z
.Jg' D. RoadNameorNumber .,,
!l ·@ E. Begin & End Termini
'" '" F. Project Description G. Structure ID
I 2 3
SR-14 West Camas S/011gl1 Brirlge
12 13 from: to:
Widen lo 4 lanes
NOTE: PE phase begnn 1/2006
Bybee Road Realignmenl
SE 15th St. lo SE 20th St.
17 14 from: to:
New construction
NW/NE 6tlt A vetrue Corridor Improvements
NVl Norn·ood to NE Garfield
14 15 from: to:
Access and multimod11l upgrades
NW38tltA1•e1me
NW Parker to Grass Valley Pnrk
16 16 from: ID:
Widening.. bike Innes
NW 23rd Avem1e
Nw Astor to NW Sierra
17 17 from: to:
Widening, sidewalk
NW Leadbeller Drive
NW Lake Rd. to NW Fremont St.
17 l8 from: to:
Sidewalk
Report Date: 6/5/2019
1s ~ 0 ~ :;': ]' ....
4
03
01
24
03
04
28
,£3 ~ ii ~ ~ ,_, Phase Start b'l 'ii g 1l FederalFtUid (yyyy) ~ el 'O' Code
,l;
5 6 7 8 9 IO
ALL 1/1/2025
p 2.25
Totals
ALL
I
l/l/20221 c
s
p 0.05 w
G
p
T
Totals
IALL
I
l/!/20221
p 1.70
Totals
ALL
I
l/l/20231 p
c
p 0.45 G
T
Totals
ALL
I
!/l/20231
p 0.23
Totals
CN
I
!/!/20231 p
c
p 0.15 T
G
w
s
Totals
FROM: 2020 TO: 2025
Hearing Date: 6/3/2019 AdoptionDate: 6/17/2019
Amend Date: Resolution No: ----------
Project Costs in Thousands of Dollars Federnlly Funded
Fund Source Information Expenditure Schedule (Local Agency) Projects Only
State Fund Envir. RIW Federal Funds State Funds Local Funds Total Funds
Code ,,, 2nd 3<d 4th thru61h Type Required
ll 12 13 14 15 16 17 l8 19 20 21
WSDOT 3500 3500 3500
NO
0 0 3500 0 3500 0 0 0 3500
I I I I
16901 16901
I I
16901
YES
0 0 0 1690 1690 0 1690 0
I I I I
10001 10001
I I
10001
NO
0 0 0 1000 1000 0 0 1000 0
I I I I
40901 40901
I I I
4090
CE YES
0 0 0 4090 4090 0 0 0 4090
I I I I
5401 5401
I I I
540
YES
0 0 0 540 540 0 0 0 540
I I I I
641 641
I I I
64
NO
0 0 0 64 64 0 0 0 64
Page 3 oflO
Agency: City of Camas
Co. No.: 06 Co. Name: Clark Co.
MPO/RTPO: RTC City No.: 0145
6 1 Project Identification
A. Pin/Project No. B. STIP ID a z C. Project Title
·1 0 D. Road Name or Number "" § E. Begin & End Termini
'" p., F. ProjectDescription G. Structure ID
l 2 3
NE 28th Street & NE 2.1211tl Avenlle
17 19 from: to:
Intersection improvements
Brady Road
Mcintosh to West City Limits
16 20 from: to:
Bike & Pedestrinn Improvements
NW Aslor Street/NW 11th Al'eJJlle
NW 16th Ave. to Mcintosh Rd.
17 21 from: to:
Widening. bike lanes
Includes path on Forest Home Road
from Forest Home Lane to Astor Street
NWJBtliAveulle, eta!
NW Astor to NW 16th, include NW Hood
16 22 from: to:
Widen curb, sidewalk
NWJ8tliAve1111e
NW Whitnum SL to NW Brndy Rd.
16 23 from: to:
New construction with bike lanes
NW 18th Avenue
NW Whitman St. to West City Limits
16 24 from: to:
Widening, bike lanes
ReportDate; 6/5/2019
~g
~ 0 }$
4
24
04
03
03
01
03
,, .g tl ~ 1l ,.., 8 Phase Start i'.l ~ g ~ (yyyy) Federal Fund
{l l Code
5 6 7 8 9 10
ALL 6/1/2023
p 0.00
Totals
PE
I
111/20241
p .50
Totals
PE
I
1/1/2023:1 p RW 1/1/2024
c CN 6/112025
p 0.62 G
T
Totals
PE
I
1/1/20231 s
w
p 0.51 p
T
c
Totals
PE
I
1/1/20231 p
G
p 0.26 T
c
w
s
Totals
PE
I
1/1/20241 w
s
p 0.40 p
T
c
G
Totals
FROM: 2020 TO: 2025
HearingD11te: 6/3/2019 AdoptionDate: 6/17/2(~
Amend Date: Resolution No: ----------
Project Costs in Thousands of Dollars Federally Funded
Fund Source Information Expenditure Schedule (Local Agency) Pro'ectsOnl·
Federal Funds State Fund State Funds Local Funds Total Funds Envir. RJW
Code 1't 2nd 3,d 4ththru6th Type Required
11 12 13 14 15 16 17 18 19 20 21
165 165 165
NO
0 0 0 165 165 0 0 0 165
I I I I 51 51 I I I
5
0 0 0 5 5 0 0 0 5
I I I I
13;1 13:1
I I I
130
130 130 130
2040 2040 2040
YES
0 0 0 2300 2300 0 0 0 2300
I I I I 'I 'I I I I
5
YES
0 0 0 5 5 0 0 0 5
I I I I
51 51
I I I
5
0 0 0 5 5 0 0 0 5
I I I I 51 'I I I I
5
0 0 0 5 5 0 0 0 5
Page 4of10
Agency: City of Camas
Co. No.: 06 Co. Name: Clark Co.
MPO/RTPO: RTC CityNo.: 0145
~ ll Project Identification
1 A Piu/ProjectNo. B. STIP ID
] C. Project Title
. "' D. Road Name or Number ·o § .g E. Begin & End Termini
'" " F. Project Description G. SlructureID
1 2 3
NE.f3rJAwmue
17 25 from: SR-500 to: East City Limits
Widen to 3 lanes with bike lanes
NW 4Jnl/NW Astor-NW Sierra to NW 381/t
16 26 from: to:
Widening, bike lanes
NE 232mfA11enue
NE 28U1 to NE 9th St.
17 27 from: to:
Widen to 3 lanes with bike lanes
NorJ/J Dwyer Creek Master Pltm Street "B"
NW Friberg St.IS trunk to NW Lnrkspur St.
00 28 from: to:
New construction
NW Pay11e Street
NW Lake Rd. to NW Camas Meadow11 Dr.
DD 29 from: to:
Widening
North Dwyer Creek Muster Plun SJreeJ "A"
NW Lake Rd. to NW Camas Meadows Dr.
00 30 from: to:
New construction
ReportDate: 6/5/2019
~~ ~ '&: JR
4
03
03
15
15
03
t5
1 .lJ ~ a ..., 8 Phase Start tl @' Federal Fund l 1l (yyyy)
" 'O' Code
0:
5 6 7 8 9 10
ALL 1/1/2025
c
s
p 0.36 G
p
T
Totals
PE
I
1/1/20251 s
p
p .so c
G
T
Totals
PE
I
6/1/20241
p 0,97
Totals
PE
I
1/1/20251 c
s
p 0.90 w
G
p
T
Totals
PE
I
1/1/20251 c
G
p 0.40 p
T
Totals
PE
I
1/1/20251 c
s
p 0.64 w
G
p
T
Totals
FROM: 2020 TO: 207.S
Hearing Date: 6/3/2019 AdoptionDate: 6/17/2019
Amend Date: Resolution No: ----------
Project Costs in Thousands of Dollars Federnlly Funded
Fund Source Information Expenditure Schedule (Local Agenqy) Projects Only
State Fund Envir. RfW Federal Funds State Funds Local Funds Total Funds Code ],t 2nd 3,d 4th tbru 6th Type R!lquired
11 12 13 14 15 16 17 18 19 20 21
2190 2190 2190
YES
0 0 0 2190 2190 0 D 0 2190
I I I I 51 51 I I I
5
0 0 D 5 5 0 0 0 5
I I I I 51 51
I I I
5
D D D 5 5 0 D 0 5
I I I I
51 51 I I I
.,
0 0 0 5 5 D D 0 5
I I I I 51 51 I I I
5
0 0 0 5 5 D 0 0 5
I I I I l 51 I I I
5
0 0 D 5 5 D 0 0 5
Page5 of IO
Agency: City of Camas
Co. No.: 06 Co. Name: Clark Co.
MPO!RTPO: RTC CityNo.: 0145
~ t Project Identification
0 I A. Pin/Project No. B. STIP ID
] C. Project Title
b D. Road Nnme or Nmnber '" £ ·8 E. Begin & End Tem1ini
'" F. Project Description G. Structure ID
I 2 3
NW Mc/11tos/1 Road
NW Brady Rd. to NW 11th Ave.
17 31 from: to:
Widening, bike lanes
NE Wootlhttm Drfrc
SE 283rd Ave. to SE 15th St.
00 32 from: to:
New construction
Includes 23rd St. realignment
SE 15th Street/Nourse Roatl
07 33 from: Camas High Sc:hool to: NE 283rd Ave.
Widen to 3 Innes with bike lanes
NE 18/h Street
NE 192ndAve. to NE Goodwin Rd.
00 34 from: to:
New construc:tion
(potential alternate alignment)
NE 28th Street
NE 232nd Ave. to NE 242nd Ave.
17 35 from: to:
Widen to 3 lanes with bike lanes
NW Camas Meadows Dri1•e
NE 13U1 St. to NE 18th St.
16 36 from: to:
New construction
(potential alternate alignment)
Report Date: 6/5/2019
ii S3 ~ ~ .§ C<
4
15
OJ
15
15
15
15
'* 1 J j 8 H Phase Sta1t
~ b g Federal Fund "' (yyyy) i5 ! Code
5 6 7 8 9 JO
PE l/l/2025
p
G
p 1.2 c
T
Totals
ALL
I
1/1/20221 c
s
p .70 w
G
p
T
Totals
PE
I
1/1/20251 c
s
p 0.59 w
G
p
T
Totals
PE
I
111/20251
p 0.67
Totals
PE
1,
1/1/20251
p 0.50
Totals
PE
I
1/1/20251
p 0.20
Totals
FROM: 2020 TO: 2025
Hearing Date: 6/3/2019 AdoptionDate: 6/1712019
Amend Date: Resolution No; ----------
Projecl Cos ls in Thousands of Dollars Federnlly Funded
Fund Source Information Expenditure Schedule (Local Agency) Projects Only
State Fund Envir. RfW
Federal Funds State Funds Local Funds Total Funds Code J,t 2nd 3rd 4U1 thru 6th Type Required
11 12 13 14 15 16 17 18 19 20 21
5 5 5
0 0 0 5 5 0 0 0 5
I I I I
61001 61001
I I I
6100
YES
0 0 0 6100 6100 0 0 0 6100
I I I I 51 51 I I I
5
0 0 0 5 5 0 0 0 5
I I I I
51 51
I I I
5
0 0 0 5 5 0 0 0 5
I I I I 51 51 I I I
5
0 0 0 5 5 0 0 0 5
I I I I 51 51 I I I
5
0 0 0 5 5 0 0 0 5
Page6 of IO
Agency: City of Camas
Co. No.: 06 Co. Name: Clark Co.
MPO/RTPO: RTC CityNo.: 0145
~ 1 Project Identification
A.Pin/ProjectNo. B. STIP ID
1 z C. Project Title
Jo> D. Road Name or Nmnber
"§ E. Begin & End Termini § ·o
'" 0. F. Proje6tDescriplion G. StrucLureID
1 2 3
NE 242ndAve1111e
NE 28th St. to NE 9th St.
00 37 ti·om: to:
Widen to 3 Innes with bike lane
NE !11g/e. Rolltl Ext1msiou
Goodwin to 232ndAve
00 38 from: to:
New construction
NW Marylund Street
NW 19th to NW 24th
19 39 from: to:
New construction
NE Ne1•utla Street
NE 3rd to NE 6th
19 40 from: to:
Reconstrnct
NE Goodwil1 Road@NW Camas Meadows Drii>e
00 41 from: to:
Traflfo signal
NW Pacific Rim@P11rker Street
16 42 from: to:
Traffic signal
ReporlDate: 6/512019
" 1~
0 0. JR
4
15
15
01
04
24
15
.!l <l ~ j ! 8 Phase Start
~ g ~ Federal Fund
;l (vyyy) Code !-< '8'
" 5 6 7 8 9 10
PE 6/1/2025
p 0.70
Totals
PE
I
6/1/20251
p 1.00
Totals
ALL
I
6/1/20251 c
s
p 0.25 w
G
p
T
Totals
ALL
I
6/1/20251
p 0.17
Totals
ALL
I
1/1120241
p 00
Totals
PE
I
1/1/20251
p 00
Totals
FROM: 2020 TO: 2025
Hearing Date: 6/3/2019 AdoptionDnte: 6/1712019
Amend Date: Resolution No: -----
Project Costs in Thousands ofDollars Federally Funded
Fund Source Information Expenditure Schedule (Local Agency) Projects On!·
State Fund Envir. [IJW Federal Funds Code Slate Funds Local Funds Total Funds ht 2nd 3<d 4th thru 6th Type Require<l
'
11 12 13 14 15 16 17 18 lS 20 21
5 5 _ _......)
0 0 0 5 5 0 0 0 5
I I I I 51 51 I I I
5
0 0 0 5 5 0 0 0 5
I I I I
2801 2801
I I I
280
NO
0 0 0 280 280 0 0 0 280
I I I I
2801 2801
I I I
280
NO
0 0 0 280 280 0 0 0
I I I I
3501 3501
I I I
350
NO
0 0 0 350 350 0 0 0 350
I I I I 51 51
I I I
5
0 0 0 5 5 0 0 0 5
Page 7of10
Agency: City of Camas
Co. No.: 06 Co. Name: Clark Co.
MPO/RTPO: RTC CityNo.: 0145
~ " Project Identification
0 1 A Pin/Project No. B. STIP ID
] z C. ProjectTitle
b D. Road Name or Number ·o
& § E. Begin & End Tennini
" F. Project Description G. Structure ID
l 2 3
SR-500@Leadbetter Road
16 43 from: to:
Access Control
SR-SOO@Nm1'E/W Arterial
16 44 from: to;
Intersection improvements
NE 281/J Street@242nd A1•e11ue
16 45 from: to:
Intersection improvements
SR-500
@NE 14th Ave.
16 46 from: tr•:
Controlled Access
NE 232wl Al'C11tle@ll1gle Exte1tsio1t
00 47 from: to:
Roundabout
Pflvement Treatme11ls (muintemmce & preseriwtion)
00 48 from: lo:
Overlays, surface treatments
ReportDate: 6/5/2019
~9 ~! JE-<
4
15
15
15
24
15
47
~ i ~ z H 8 ii! Phase Start bl ~ g 1l l"YYY) Federn!Fund
i5 '8' Code
" 5 6 7 8 9 lO
PE l/l/2025
p 00
Totals
PE
I
6/1/20251
p 00
Totals
p 00 PE
I
6/1/20251
Totals
p 00 PE
I
6/1/20251
Totals
PE
I
6/1/20251
p 00
Totals
CN
I
6/1/20201 p
p 00
Totals
FROM: 2020 TO: 2025
Heuring Date: 6/3/2019 Adoption Date: 6/1712019
Amend Date: Resolution No: ----------
Project Costs in Thousands of Dollars Fedcrnlly Funded
Fund Source Information Expenditure Schedule (Local Agenc;~ ProjectsOnlr
Federal Funds State Fund State Funds Local Funds Total Funds Envir. RJW
Code 1't 2nd 3rd 4U1 thru 6th Type Required
ll 12 13 14 15 16 17 18 19 20 21
5 5 5
0 0 0 5 5 0 0 0 5
I I I I 51 51 I I I
5
0 0 0 5 5 0 0 0 5
I I I I 51 51 I I I
5
0 0 0 5 5 0 0 0 5
I I I I 51 51
I I I
5
0 0 0 5 5 0 0 0 5
I I I I
51 51
I I I
5
0 0 0 5 5 0 0 0 5
I I I I
42001 42001 7001 7001 7001
2100
NO
0 0 0 4200 4200 700 700 700 2100
Page 8 oflO
Agency: City of Camas
Co. No.: 06 Co. Name: Clark Co.
MPO/RTPO: RTC CityNo.: 0145
~ " Project Identification
I A. Pin/Project No. B. STIP ID 0 s C. Project Title
E B' D. Road Name or Number
~ .g E. Begin & End Termini .. F. Projec:t Description G. SlrucLure ID
1 2 3
Reco11stntcts
00 49 from: Citywide to:
Sidewalk Projects
00 50 from: to:
Sidewalk installations Citywide
Curb Ramp Projecll'
0 51 from: to:
Future curb ramp installations
Shared Path Improvemenll'
Citywide
0 52 from: to:
Safety ProjeCll'
00 53 from: to:
Future safety projects
Includes trnftlc revisions, NW Fargo Curve Safety
Analysis
Storm Grate Replacements (Bike lmproveme11Js)
00 54 from: to:
Storm grate replacements for bike lane improvements
ReportDnte: 6/5/2019
~ ... ./l ]D ~ ~i j 8 Phase Start jR ~ ~ ll 0Jyyy) Federal Fund
::0 .,,, Code
,!:
4 5 6 7 8 9 10
ALL 1/112020 CDBG
G
w
04 p 00
Totals
ALL
I
111/20201
28 p 00
Totals
28 p 00 ALL
I
1/1/20201
Totals
28 p 00 ALL
I
111120221
Totals
ALL
I
111120201
21 p 00
Totals
CN
I
111/20201
38 p 00
Totals
FROM: 2020 TO: 207.5
Hearing Date: 6/3/2019 Adoption Date: 6/17/2019
Amend Date: Resolution No: -----
Project Costs in Thousands of Dollars Federally Funded
Fund Source Infonnation Expenditure Schedule (Local Agency) Projects Only
Federal Funds State Fund State Funds Local Funds Total Funds Envir. flJW
Code l't 2nd 3rd 4th thru 6th Type Required
11 12 13 14 15 16 17 18 19 20 21
250 1250 1500 250 250 250 750
NO
0 250 0 1250 !500 250 250 250 750
I I I I
1501 1501 251 251 251
75
NO
0 0 0 150 150 25 25 25 75
I I I I
1501 1501 251 251 251
75 NO
0 0 0 150 150 25 25 25 75
I I I I
2001 2001
I I
501
150 NO
0 0 0 200 200 0 0 50 150
I I I I
3001 3001 501 501 501
150
NO
0 0 0 300 300 50 50 50 150
I I I I
201 201 201
I I NO
0 0 0 20 20 20 0 0 0
Page 9 of IO
Agency: City of Camas
Co. No.: 06
City No.: 0145
Co. Name: Clark Co.
MPO/RTPO: RTC
ll Project Identification
1 A. Pin/Project No. B. STIP ID
z C. Project Title
·f D. Road Name or Number
·8 E. Begin & End Termini
p.. F. ProjectDescription G. Structure ID
2 3
Future Bike ROltJe Improvements
Citywide
00 55 from: to:
Future bike route improvements
Street Liglt1i11g
Citywide
00 56 from: to:
Street Lighting
Report Date: 6/5/2019
~8 ~ 8. 1~
4
28
21
~ l ll ,_, ~ Phase Start ii :s B> ~ Federal Fund ~ (yyyy) !': l Code
5 6 7 8 9 IO
CN 1/112020
p 00
Totals
CN
I
1/1/20201
p DO
Totals
FROM: 2020 TO: 2025
Hearing Date: 6/3/2019 AdoptionDnte: 6/17/2019
Amend Date: ____ _ Resolution No: -----
Projec~ Costs in Thousands of Dollars Federally Funded
Fund Source Infonnation Expenditure Schedule (Local Agency) Projects On!'
Stale Fund Envir. RfW
Federal Funds State Funds Local Funds Total Funds Code ht 2nd 3rd 4th thm 6th Type Required
11 12 13 14 15 16 17 18 19 20 21
30 30 5 5 5 15
NO
0 0 0 30 30 5 5 5 15
I I I I
1201 1201 201
201 201
20
NO
0 0 0 120 120 20 20 20 20
Page 10of10
City of Camas
2020-2025
Six Year Street Priorities
Lake Rd. & Everett St. Intersection lmpr
SR 500 (Everett St/Rd)
North Shore EastlWest Arterial
Washougal River Bridge
ADA Access Upgrades Citywide G)
NE 9th St
7 NW Lake Rd.
8 La ke Rd. & NW Sierra St. Signal
9 16th Ave/ Hood / 18th Ave Path
10 NE Goodwin Rd/28th St
11 NE Goodwin Road/ Ingle Rd Signal
12 SE Crown Rd
13 SR 14-West Camas Slough Bridge
14 Bybee Rd
15 NW/NE 6th Ave Corridor Imp
16 NW 38th Ave (Ph 3)
17 NW 23rd Ave
18 NW Leadbetter Dr Path
19 NE 28th St & NE 232nd Ave Intersection Imp.
20 NW Brady Rd Ped & Bike Improvements
21 NW Astor St.
22 NW 16th Ave/Hood/18th Ave
23 NW 18th Ave
24 NW 18th Ave/Payne Rd
25 NE 43rd Ave
26 NW Astor St. /43rd Ave
27 NE 232nd Ave
28 Street "B " (North Dwyer Creek Area)
29 NW Payne St.
30 Street 'A' (North Dwyer Creek Area)
31 NW Mcintosh Rd
32 NW Woodburn Dr.
33 SE 15th St./Norse Rd
34 NE 18th St (192nd to Goodwin)
35 NE 28th St
36 NW Camas Meadows Dr (West)
37 NE 242nd Ave
38 NW Ingle Rd Extension
39 NW Maryland St
40 NE Nevada St.
41 NE Goodwin I Camas Meadows Signal
42 NW Pacific Rim I Parker St. Signal
cartras
190424 ·XXX SiK Vear Street Plan Map 2020..2025 FINAL WASHINGTON
9. Appendices
A. Six Year Form Instructions
Enter name of the sponsoring agency.
Heading
Agency
County No.
City No.
MPO/RTPO
Enter the assigned number (see LAG Appendix 21.44).
Enter the assigned number (see LAG Appendix 21.45).
Enter the name of the associated MPO (if located within urbanized area) or
RTPO (if located in a rural area).
Enter the date of the public hearing. Hearing Date
Adoption Date
Resolution No.
Amendment Date
Enter the date this program was adopted by council or commission.
Enter Legislative Authority resolution number (if applicable.)
Enter the date this program was amended by council or commission.
Column Number
1. Functional Classification. Enter the appropriate 2-digit code denoting the Federal
Functional Classification. (Note: The Federal Functional Classification must be one
approved by FHWA.)
Rural(< 5000 pop.)
01 -Interstate
02 -Principal Arterials
06 -Minor Arterials
07 -Major Collector
08 -Minor Collector
09 -Local Access
Description
00-No Classification
Urban (> 5000 pop.)
11 -Interstate
12 -Freeways & Expressways
14 -Other Principal Arterials·
16 -Minor Arterial
17 -Collector
19 -Local Access
1. Priority Numbers. Enter local agency number identifying agency project priority
(optional).
2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b)
Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route
Number;
(e) Beginning and Ending Termini (milepost or street names); and (f) Describe the Work
to be Completed.
4. Improvement Type Codes. Enter the appropriate federal code number.
SEE APPENDIX A
5. Funding Status. Enter the funding status for the entire project or phase that
describes the current status.
S -Project is 'selected' by the appropriate selection body and funding has been
secured by the lead agency.
P -Project is subject to selection by an agency other than the lead and is
listed for planning purposes. (Funding has not been determined.)
6. Total Length. Enter project length to the nearest hundredth (or code "00" if not
applicable).
7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that need to
be relocated or are impacted by the construction project.
C-Cable TV
0 -Other
S -Sewer (other than agency-owned)
W-Water
G-Gas
P -Power
T -Telephone
8. Project Phase. Select the appropriate phase code of the project.
PE -Preliminary Engineering, including Design (or Planning)
RW -Right of Way or land acquisition
CN -Construction only (or transit planning or equipment purchase)
ALL -All Phases: from Preliminary Engineering through Construction
9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the
selected phase of the project is actually expected to start.
10. Federal Fund Code. Enter the Federal Fund code from the table. ~
SEE APPENDIX C
11. Federal Funds. Enter the total federal cost (in thousands) of the phase
regardless of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed state funds
to be used on this project.
SEE APPENDIX C
13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase
regardless of when the funds will be spent.
14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase
regardless of when the funds will be spent.
15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto-calculation in the
"STIP Too" program.)
16-19. Expenditure Schedule -(1st, 2nd, 3rd, 4th thru 6th years). Enter the
estimated expenditures (in thousands) of dollars by year. (For Local Agency use.)
20. Environmental Data Type. Enter the type of environmental assessment that will be
required for this project. (This is "required" for Federally funded projects, but may be
filled in for state or locally funded projects.)
EIS -Environmental Impact Statement
EA -Environmental Assessment
CE -Categorical Exclusion
21. R/W Certification. Click Yif Right of Way acquisition is or will be required. If yes,
enter R/W
Certification Date, if known. (This is "required" for Federally funded projects
APPENDIX A
IMPROVEMENT TYPE CODES
01 New Construction Roadway
03 Reconstruction, Added Capacity
04 Reconstruction, No Added Capacity
05 4R Maintenance Resurfacing
06 4R Maintenance -Restoration & Rehabilitation
07 4R Maintenance -Relocation
08 Bridge·, New Construction
10 Bridge Replacement, Added Capacity
11 Bridge Replacement, No Added Capacity
13 Bridge Rehabilitation, Added Capacity
14 Bridge Rehabilitation, No Added Capacity
15 Preliminary Engineering
16 Right of Way
17 Construction Engineering
18 Planning
19 Research
20 Environmental Only
21 Safety
22 Rail/Highway Crossing
23 Transit
24 Traffic Management/Engineering -HOV
25 Vehicle Weight Enforcement Program
26 Ferry Boats
27 Administration
28 Facilities for Pedestrians and Bicycles
29 Acquisition of Scenic Easements and Scenic or Historic Sites
30 Scenic or Historic Highway Programs
31 Landscaping and Other Scenic Beautification
32 Historic Preservation
33 Rehab & Operation of Historic Transp. Buildings, Structures, Facilities
34 Preservation of Abandoned Railway Corridors
35 Control and Removal of Outdoor Advertising
36 Archaeological Planning & Research
37 Mitigation of Water Pollution due to Highway Runoff
38 Safety and Education for Pedestrians/Bicyclists
39 Establishment of Transportation Museums
40 Special Bridge
41 Youth Conservation Service
42 Training
43 Utilities
44 Other
45 Debt Service
47 Systematic Preventive Maintenance
5307
5309(Bus)
5309(FG)
5309(NS)
5310
5311
5316
5317
FT A Discretionary
BIA
BR
CBI
CDBG
CMAQ
DEMO
Discretionary-FBD
Discretionary-IMO
Discretionary-ITS
Discretionary-PLH
Discretionary-SB
Discretionary-STP
Discretionary-TCSP
DOD
FMSIB
IM
IRR
NHS
SRTS
STP
STP(E)
STP(L)
STP(S)
STP(R)
STP(U)
APPENDIXC
FEDERAL FUND CODES
FTA Urbanized Area Formula Program
FTA Bus and Bus Facilities
FTA Fixed Guideway Modernization
FT A New Starts
FTA Elderly Persons and Persons with Disabilities
FTA Rural Area Formula Grants
FTA Job Access & Reverse Commute Program (JARC)
FT A New Freedom Program
Discretionary Programs such as Alternatives Analysis (5339) and
TIGGER Program
Bureau of Indian Affairs
Bridge Replacement/Rehabilitation Program
Coordinated Border Infrastructure
Community Development Block Grant (Dept. of Commerce)
Congestion Mitigation and Air Quality
Demonstration Projects (High Priority, Sect. 112, 115, 117, 125 and 129)
Ferry Boat Discretionary
Interstate Maintenance Discretionary
Intelligent Transportation Systems
Public Lands Highways (Federal Lands)
Scenic Byways
Surface Transportation Priorities
Transportation, Community & System Preservation Program
Department of Defense
Freight Mobility Strategic Investment Board
Interstate Maintenance
Indian Reservation Roads
National Highway System
Safe Routes to Schools
Surface Transportation Program (WSDOT Use Only)
Surface Trans. Program -Enhancements
Surface Trans. Program -Legislative Earmarks
Surface Trans. Program-Safety (Includes Highway) Safety Improvement
Program, Hazard Elimination, Railway/Highway Crossing Program and 2010-
15 County Road Safety Program)
Surface Trans. Program -Rural Regionally Selected
Surface Trans. Program -Urban Regionally Selected
STATE FUND CODES
CRAB
FMSIB
PWTF
SRTS
TIS
TPP
WSDOT
OTHER
County Road Administration Board
Freight Mobility Strategic Investment Board
Public Works Trust Fund
Safe Routes to Schools
Transportation Improvement Board
Transportation Partnerships Program
WSDOTfunds
Any other state funds not iisted