RES 26-008RESOLUTION NO. 26-008
A RESOLUTION revising and extending the Transportation
Improvement Program for an additional six (6) years.
WHEREAS, pursuant to the requirements ofRCW 35.77.010, the City of Camas did, by
Resolution No. 25-009 adopt a Transportation Improvement Program for the ensuing six ( 6) years;
and
WHEREAS, said law requires the City revise and extend said Transportation Improvement
Program annually; and
WHEREAS, pursuant to said law, the City Council of the City of Camas, being the
legislative body of said City, did hold a public hearing on said revised Plan at 7 :00 p.m. at the Camas
Municipal Center in Camas, Washington, on the 151 day of June, 2026; and
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAMAS
AS FOLLOWS:
I
The Transportation Improvement Program heretofore adopted and revised by the City
Engineer for the City of Camas, as submitted to the City Council for the City of Camas, be and the
same is hereby adopted and extended for an additional six (6) year period from the date thereof.
II
The City Clerk shall file a copy of said revised Transportation Improvement Program for the
ensuing six (6) years, together with a copy of this Resolution, with the Secretary of Transportation of
the State of Washington.
Resolution No. 26-008
Page2
PASSED by the Council and APPROVED by the Mayor this l 51h day of June, 2026.
ATTEST: _ _,_LJ"""'-1 _::·~::::.=-i,_____,,_-=-----""'=-s __ _
Clerk
City Attorney
FROM: 2027 TO: 2032
Hearing Date: 6/1/2026 Adoption Date: 6/15/2026
Amend Date: Resolution No: 26-008
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
RW 1/1/2028 STBG 1000 381 1381
SR-500 (Everett St)CN 1/1/2030 21200 21200 21200
NE 35th Ave to NE 43rd Ave
from: to:
Widen with multi-use paths, illumination,
roundabouts
Totals 1000 0 21581 21200 0 1381 0 21200
CN 3/1/2027 3400 3400 3000 400
NW Lake Road
@ NW Sierra St.
from: to:
Intersection improvements
Totals 0 0 3400 3400 3000 400 0
ALL 1/1/2029 26400 26400 1000 25400
SR-500 (Everett St)
NE Lake Rd to NE 35th Ave
from: to:
Widen with multimodal, illumination,
bridge replacement, roundabout
Totals 0 0 26400 26400 0 0 1000 25400
CN 6/1/2028 25000 25000 20000 5000 25000
North Shore Blvd.
400 Feet West of N Benton Drive to SR-500/Everett Rd
from: to:
New construction
Includes Complete Streets, Bridge
Totals 0 0 25000 25000 0 20000 5000 25000
ALL 6/1/2028 22700 22700 14000 8700
North Shore Blvd
23700 Block to 400feet west of N. Benton Dr.
from: to:
New Construction
Includes Complete Streets, Roundabouts
Totals 0 0 22700 22700 0 14000 8700 0
ALL 6/1/2029 3870 3870 1000 2870
NW Lake Road
NW Lacamas Lane to Lacamas Lake Lodge
from: to:
Widening, sidewalk
Totals 0 0 3870 3870 0 0 1000 2870
CE Yes
P 0.45
24 P 00
0.13
1.60
Six Year Transportation Improvement Program
Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd 3rd
Project Identification
A. Pin/Project No.
Washington State Department of Transportation
Agency: City of Camas
Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.
03
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)Federal Fund
Code Federal FundsStatus
0.40
0.50
03 P
01 P16 4
16 1 03 P
E. Begin & End Termini
G. Structure ID
01 P
216
16 3 Improvement Type(s)B. STIP ID
3
16 6
16 5
Page 1 of 8
FROM: 2027 TO: 2032
Hearing Date: 6/1/2026 Adoption Date: 6/15/2026
Amend Date: Resolution No: 26-008
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd 3rd
Project Identification
A. Pin/Project No.
Agency: City of Camas
Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)Federal Fund
Code Federal FundsStatusE. Begin & End Termini
G. Structure ID Improvement Type(s)B. STIP ID
3
ALL 1/1/2027 720 720 120 120 120 360
ADA Access Upgrades
from: Citywide to:
(Ongoing)
Totals 0 0 720 720 120 120 120 360
PE 1/1/2032 1000 1000 1000
SR-500 (Everett St)
NE 43rd Ave to N City Limits
from: to:
Widen with bike lanes, sidewalks
two-way turn lane, illumination, roundabouts
Totals 0 0 1000 1000 0 0 0 1000
ALL 1/1/2030 13000 13000
Crown Road
from: SE 23rd St. to NE 3rd Ave.
Multimodal, turn lanes and intersection improvements
Totals 0 0 0 13000 0 0 0 13000
ALL 1/1/2030 WSDOT 80000 80000 80000
SR-14 West Camas Slough Bridge
from: to:
Widen to 4 lanes
NOTE: PE phase began 1/2006
Totals 0 80000 0 80000 0 0 0 80000
ALL 1/1/2030 29300 29300
NE Goodwin Road/28th Street
NW Camas Meadows Dr. to NE 232nd Ave.
from: to:
Widen to 5 lanes with bike lanes, sidewalk west of Ingle
Widen to 3 lanes with bike lanes, sidewalk east of Ingle
Totals 0 0 0 29300 0 0 0 29300
ALL 6/1/2030 2200 2200
North Shore Blvd.
NE 232nd Ave. to 23700 Block
from: to:
New construction
Includes Critical Areas and Alignment Investigation
Totals 0 0 0 2200 0 0 0 2200
PE 1/1/2029 250 250
NW/NE 6th Avenue Corridor Improvements
NW Norwood to NE Adams
from: to:
Access and multimodal upgrades
Totals 0 0 0 250 0 0 0 250
04
0.00
0.55
1.72
0.50
1.70
0.83
CE Yes
16 8
16
28
03
P 1.3
P
P
15
1500 12
14 7
9
12 10
P
17 11
04
14 13
03 P
P
P
Page 2 of 8
FROM: 2027 TO: 2032
Hearing Date: 6/1/2026 Adoption Date: 6/15/2026
Amend Date: Resolution No: 26-008
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd 3rd
Project Identification
A. Pin/Project No.
Agency: City of Camas
Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)Federal Fund
Code Federal FundsStatusE. Begin & End Termini
G. Structure ID Improvement Type(s)B. STIP ID
3
04 P .50 PE 1/1/2030 5 5
NW Brady Road
NW McIntosh Road to West City Limits
from: to:
Road, Bike & Pedestrian Improvements
Totals 0 0 0 5 0 0 0 5
15 P 1.2 PE 1/1/2031 5 5
NW McIntosh Road
NW Brady Rd. to NW 11th Ave.
from: to:
Widening, bike lanes, sidewalk
Totals 0 0 0 5 0 0 0 5
ALL 1/1/2031 6480 6480
NE 43rd Avenue
from: SR-500 to: East City Limits
Widen to 3 lanes with bike lanes, sidewalk
Totals 0 0 0 6480 0 0 0 6480
ALL 1/1/2030 1735 1735
Downtown Infrastructure
NE 3rd to NE 7th, NE Adams to NE Garfield
from: to: SWPO
Pavement and sidewalk Rehab, ADA upgrades
Totals 0 0 0 1735 0 0 0 1735
PE 1/1/2032 5 5
North Dwyer Creek Master Plan Street "B"
NW Friberg St./Strunk to NW Larkspur St.
from: to:
New construction
Totals 0 0 0 5 0 0 0 5
03 P 0.40 PE 1/1/2031 5 5
NW Payne Street
NW Lake Rd. to NW Camas Meadows Dr.
from: to:
Widening, bike lanes, sidewalk
Totals 0 0 0 5 0 0 0 5
04 P 0.23 ALL 1/1/2030 650 650
NW 23rd Avenue
NW Astor to NW Sierra
from: to:
Widening, sidewalk
Totals 0 0 0 650 0 0 0 650
P06 0
03 P 0.36
15
17 20
17
0.90
17 15
16
00 17
00 18
19
1416
19
P
Page 3 of 8
FROM: 2027 TO: 2032
Hearing Date: 6/1/2026 Adoption Date: 6/15/2026
Amend Date: Resolution No: 26-008
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd 3rd
Project Identification
A. Pin/Project No.
Agency: City of Camas
Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)Federal Fund
Code Federal FundsStatusE. Begin & End Termini
G. Structure ID Improvement Type(s)B. STIP ID
3
15 P 0.64 PE 1/1/2027 5 5
North Dwyer Creek Master Plan Street "A"
NW Lake Rd. to NW Camas Meadows Dr.
from: to:
New construction
Totals 0 0 0 5 5 0 0 0
28 P 0.15 CN 1/1/2030 250 250
NW Leadbetter Drive
NW Lake Rd. to NW Fremont St.
from: to:
Sidewalk / path
Totals 0 0 0 250 0 0 0 250
ALL 6/1/2030 600 600
NE 28th Street & NE 232nd Avenue
from: to:
Intersection improvements
Totals 0 0 0 600 0 0 0 600
03 P 0.62 PE 1/1/2030 5 5
NW Astor Street/NW 11th Avenue
NW 16th Ave. to McIntosh Rd.
from: to:
Widening, bike lanes, sidewalk
Totals 0 0 0 5 0 0 0 5
03 P 0.51 PE 1/1/2029 5 5
NW 18th Avenue, et al
NW Astor to NW 16th, include NW Hood
from: to:
Widen curb, sidewalk
Totals 0 0 0 5 0 0 0 5
01 P 0.18 PE 1/1/2030 5 5
NW 20th Ave Extension
NW Sage St to NW 18th Ave
from: to:
New Construction with multimodal
Totals 0 0 0 5 0 0 0 5
PE 1/1/2029 5 5
NW 18th Avenue
NW Tidland St. to NW Brady Rd.
from: to:
Sidewalk / path
Totals 0 0 0 5 0 0 0 5
27 01 P 0.26
25
04
19 26
2317
16
0.00
16
00 21
17 22
17 24
P
Page 4 of 8
FROM: 2027 TO: 2032
Hearing Date: 6/1/2026 Adoption Date: 6/15/2026
Amend Date: Resolution No: 26-008
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd 3rd
Project Identification
A. Pin/Project No.
Agency: City of Camas
Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)Federal Fund
Code Federal FundsStatusE. Begin & End Termini
G. Structure ID Improvement Type(s)B. STIP ID
3
03 P 0.50 PE 1/1/2030 5 5
NW 18th Avenue
NW 20th Extension to West City Limits
from: to:
Widening, bike lanes
Totals 0 0 0 5 0 0 0 5
03 P 0.31 PE 1/1/2031 5 5
NW 43rd/NW Astor - NW Sierra to NW 38th Impr.
from: to:
Widening, bike lanes, sidewalk
Totals 0 0 0 5 0 0 0 5
15 P 0.97 PE 1/1/2031 5 5
NE 232nd Avenue
NE 28th to NE North Shore Blvd.
from: to:
Widen to 3 lanes with bike lanes, sidewalk
Totals 0 0 0 5 0 0 0 5
PE 1/1/2031 5 5
NE Woodburn Drive
SE 283rd Ave. to SE 15th St.
from: to:
New construction
Includes 23rd St. realignment
Totals 0 0 0 5 0 0 0 5
15 P 0.59 PE 1/1/2031 5 5
SE 15th Street/Nourse Road
from: Camas High School to: NE 283rd Ave.
Widen to 3 lanes with bike lanes, sidewalk
Totals 0 0 0 5 0 0 0 5
15 P 0.67 PE 1/1/2031 5 5
NE 18th Street
NE 192nd Ave. to NE Goodwin Rd.
from: to:
New construction
(potential alternate alignment)
Totals 0 0 0 5 0 0 0 5
15 P 0.50 PE 1/1/2031 5 5
NE 28th Street
NE 232nd Ave. to NE 242nd Ave.
from: to:
Widen to 3 lanes with bike lanes
Totals 0 0 0 5 0 0 0 5
33
07
01 P .70
17 30
16 29
00 31
28
32
34
00
17
16
Page 5 of 8
FROM: 2027 TO: 2032
Hearing Date: 6/1/2026 Adoption Date: 6/15/2026
Amend Date: Resolution No: 26-008
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd 3rd
Project Identification
A. Pin/Project No.
Agency: City of Camas
Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)Federal Fund
Code Federal FundsStatusE. Begin & End Termini
G. Structure ID Improvement Type(s)B. STIP ID
3
15 P 0.20 PE 1/1/2031 5 5
NW Camas Meadows Drive
NE 13th St. to NE 18th St.
from: to:
New construction
(potential alternate alignment)
Totals 0 0 0 5 0 0 0 5
PE 1/1/2031 5 5
NE 242nd Avenue
NE 28th St. to NE North Shore Blvd.
from: to:
Widen to 3 lanes with bike lanes, sidewalk
Totals 0 0 0 5 0 0 0 5
01 P 0.25 PE 6/1/2031 5 5
NW Maryland Street
NW 19th to NW 24th
from: to:
New construction
Totals 0 0 0 5 0 0 0 5
15 P 00 PE 6/1/2031 5 5
NW Pacific Rim @ Parker Street
from: to:
Traffic signal
Totals 0 0 0 5 0 0 0 5
03 P 1.30 PE 6/1/2031 5 5
NE Ingle Road-NE Goodwin to N City Limits
Goodwin to N City Limits
from: to:
widen to 3 lanes with bike lanes, sidewalk
Totals 0 0 0 5 0 0 0 5
01 P 0.80 PE 1/1/2031 5 5
SE 8th St / 271st Ave
from: SR-500 to: 15th St
Totals 0 0 0 5 0 0 0 5
ALL 1/1/2027 5450 5450 5000 450
SR500 (Everett St) @ NE Everett Dr
from: to:
Roundabout
Totals 0 0 5450 5450 5000 450 0 0
01 P4116
36
38
00
15 P 0.70
40
35
16
37
00
19
16
17 39
09
Page 6 of 8
FROM: 2027 TO: 2032
Hearing Date: 6/1/2026 Adoption Date: 6/15/2026
Amend Date: Resolution No: 26-008
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd 3rd
Project Identification
A. Pin/Project No.
Agency: City of Camas
Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)Federal Fund
Code Federal FundsStatusE. Begin & End Termini
G. Structure ID Improvement Type(s)B. STIP ID
3
01 P 00 ALL 1/1/2028 3175 3175 2700 475
North Shore Blvd @ 24800 BLK
from: to:
Roundabout
Totals 0 0 3175 3175 0 2700 475 0
01 P 00 ALL 1/1/2028 3175 3175 3000 175
North Shore Blvd @ NE 252nd Ave
from: to:
Roundabout
Totals 0 0 3175 3175 0 3000 175 0
15 P 00 PE 1/1/2031 5 5
NE 28th Street @ 242nd Avenue
from: to:
Intersection improvements
Totals 0 0 0 5 0 0 0 5
PE 1/1/2031 5 5
SR-500
@ NE 14th Ave.
from: to:
Controlled Access
Totals 0 0 0 5 0 0 0 5
47 P 00 CN 6/1/2027 9000 9000 1500 1500 1500 4500
Pavement Treatments (maintenance & preservation)
from:
Overlays, surface treatmentsto:
Totals 0 0 9000 9000 1500 1500 1500 4500
04 P 00 ALL 1/1/2027 1500 250 250 250 750
Reconstructs
from: Citywide
to:
Totals 0 0 0 1500 250 250 250 750
28 P 00 ALL 1/1/2027 300 300 50 50 50 150
Sidewalk Projects
from:
Sidewalk installations Citywide, including curb rampsto:
Totals 0 0 300 300 50 50 50 150
4800
16 45
16 44
16 42
00 47
00 46
16 43
04 P 00
Page 7 of 8
FROM: 2027 TO: 2032
Hearing Date: 6/1/2026 Adoption Date: 6/15/2026
Amend Date: Resolution No: 26-008
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC
C. Project Title
F. Project Description
D. Road Name or Number
Federally Funded
Projects Only
Envir.
Type
R/W
RequiredState Funds Local Funds Total Funds 1st
Expenditure Schedule (Local Agency)
4th thru 6th2nd 3rd
Project Identification
A. Pin/Project No.
Agency: City of Camas
Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.
Project Costs in Thousands of Dollars
Fund Source Information
State Fund Code
Project PhasePhase Start
(yyyy)Federal Fund
Code Federal FundsStatusE. Begin & End Termini
G. Structure ID Improvement Type(s)B. STIP ID
3
28 P 00 ALL 1/1/2028 250 50 50 150
Shared Path Improvements
Citywide
Includes NW Norwood Dr
Totals 0 0 0 250 0 50 50 150
CN 4/1/2027 HSIP 930 930 930 20 20 60
Safety Projects
Future safety projects
Includes traffic revisions,
NW Lake Rd Safety Improvements
Totals 930 0 0 930 930 20 20 60
00 49
00 50 21 S 00
Page 8 of 8
Notes
•This 6-Year TIP has been developed to meet the requirements of RCW 35.77.010, to assure a coordinated transportation program for the State of Washington.
•Projects identified are NOT fully funded; however, the City can apply for
different types of State/Federal Funding for those projects on the TIP.
•The City Council’s intent is to use this as a prioritized framework to guide transportation decisions in coordination with the more detailed and
technical Transportation System Plan.
City of Camas
2027 – 2032
Six Year Street Priorities
SR 500 (Everett St)1
Lake Rd. & NW Sierra St. Roundabout2
SR 500 (Everett St)3
North Shore Blvd.4
North Shore Blvd.5
NW Lake Rd6
ADA Access Upgrades Citywide7
SR 500 (Everett St/Rd)8
SE Crown Rd9
SR 14 – West Camas Slough Bridge10
NE Goodwin Rd/28th St11
NorthShore Blvd.12
NW/NE 6th Ave Corridor Imp13
NW Brady Rd 14
NW McIntosh Rd15
NE 43rd Ave16
Downtown Infrastructure17
Street "B" (North Dwyer Creek Area)18
NW Payne St.19
NW 23rd Ave20
Street "A" (North Dwyer Creek Area)21
NW LeadbetterDr Path22
NE 28th St & NE 232nd Ave Intersection Imp.23
NW Astor St.24
NW 16th Ave/Hood/18th Ave25
NW 20thAve. Extension26
NW 18th Ave Pedestrian Path27
NW 18th Ave/Payne Rd28
NW Astor St. /43rd Ave29
NE 232nd Ave30
NE Woodburn Dr.31
SE 15th St./Norse Rd32
NE 18th St (192nd to Goodwin)33
NE 28th St (232nd to 242nd)34
NW Camas Meadows Dr (West)35
NE 242nd Ave36
NW Maryland St37
NW Pacific Rim / Parker St. Signal38
NE Ingle Rd to N City Limits39
SE 8th St / 271stAve40
SR500 & Everett Dr Roundabout41
North Shore Blvd & 24800 Blk Roundabout42
North Shore Blvd & 252nd Roundabout43
See List for Additional PrioritiesSix Year Street Plan Map 2026-2031 (File 2027-2032 ( STIP )
37
30
10
24
31
32
15
20
14
29
28
33
19
18
34
1
16
22
23
36
13
21
11
38
9
25
8
39
17
2
7
3
12 43
40
27
26
35
4
5
5
6
42
41
Appendices
Six Year Form Coding Instructions
Heading
Agency Enter name of the sponsoring agency.
County No. Enter the assigned number (see LAG Appendix 21.44).
City No. Enter the assigned number (see LAG Appendix 21.45).
MPO/RTPO Enter the name of the associated MPO (if located within urbanized area) or
RTPO (if located in a rural area).
Hearing Date Enter the date of the public hearing.
Adoption Date Enter the date this program was adopted by council or commission.
Resolution No. Enter Legislative Authority resolution number (if applicable.)
Amendment Date Enter the date this program was amended by council or commission.
Column Number
1. Functional Classification. Enter the appropriate 2-digit code denoting the Federal
Functional Classification. (Note: The Federal Functional Classification must be one
approved by FHWA.)
Description
00- No Classification
Rural (< 5000 pop.) Urban (> 5000 pop.)
01 - Interstate 11 - Interstate
02 - Principal Arterials 12 - Freeways & Expressways
06 - Minor Arterials 14 - Other Principal Arterials
07 - Major Collector 16 - Minor Arterial
08 - Minor Collector 17 - Collector
09 - Local Access 19 - Local Access
1. Priority Numbers. Enter local agency number identifying agency project priority
(optional).
2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b)
Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route
Number;
(e) Beginning and Ending Termini (milepost or street names); and (f) Describe the Work
to be Completed.
4. Improvement Type Codes. Enter the appropriate federal code number.
SEE APPENDIX A
5. Funding Status. Enter the funding status for the entire project or phase that
describes the current status.
S - Project is ‘selected’ by the appropriate selection body and funding has been
secured by the lead agency.
P - Project is subject to selection by an agency other than the lead and is
listed for planning purposes. (Funding has not been determined.)
6. Total Length. Enter project length to the nearest hundredth (or code “00” if not
applicable).
7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that need to
be relocated or are impacted by the construction project.
C - Cable TV G - Gas
O - Other P - Power
S - Sewer (other than agency-owned) T - Telephone
W – Water
8. Project Phase. Select the appropriate phase code of the project.
PE - Preliminary Engineering, including Design (or Planning)
RW - Right of Way or land acquisition
CN - Construction only (or transit planning or equipment purchase)
ALL - All Phases: from Preliminary Engineering through Construction
9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the
selected phase of the project is actually expected to start.
10. Federal Fund Code. Enter the Federal Fund code from the table.
SEE APPENDIX C
11. Federal Funds. Enter the total federal cost (in thousands) of the phase
regardless of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed state funds
to be used on this project.
SEE APPENDIX C
13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase
regardless of when the funds will be spent.
14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase
regardless of when the funds will be spent.
15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto-calculation in the
“STIP Too” program.)
16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the
estimated expenditures (in thousands) of dollars by year. (For Local Agency use.)
20. Environmental Data Type. Enter the type of environmental assessment that will be
required for this project. (This is “required” for Federally funded projects, but may be
filled in for state or locally funded projects.)
EIS - Environmental Impact Statement
EA - Environmental Assessment
CE - Categorical Exclusion
21. R/W Certification. Click Y if Right of Way acquisition is or will be required. If yes,
enter R/W
Certification Date, if known. (This is “required” for Federally funded projects
APPENDIX A
IMPROVEMENT TYPE CODES
01 New Construction Roadway
03 Reconstruction, Added Capacity
04 Reconstruction, No Added Capacity
05 4R Maintenance Resurfacing
06 4R Maintenance - Restoration & Rehabilitation
07 4R Maintenance - Relocation
08 Bridge, New Construction
10 Bridge Replacement, Added Capacity
11 Bridge Replacement, No Added Capacity
13 Bridge Rehabilitation, Added Capacity
14 Bridge Rehabilitation, No Added Capacity
15 Preliminary Engineering
16 Right of Way
17 Construction Engineering
18 Planning
19 Research
20 Environmental Only
21 Safety
22 Rail/Highway Crossing
23 Transit
24 Traffic Management/Engineering - HOV
25 Vehicle Weight Enforcement Program
26 Ferry Boats
27 Administration
28 Facilities for Pedestrians and Bicycles
29 Acquisition of Scenic Easements and Scenic or Historic Sites
30 Scenic or Historic Highway Programs
31 Landscaping and Other Scenic Beautification
32 Historic Preservation
33 Rehab & Operation of Historic Transp. Buildings, Structures, Facilities
34 Preservation of Abandoned Railway Corridors
35 Control and Removal of Outdoor Advertising
36 Archaeological Planning & Research
37 Mitigation of Water Pollution due to Highway Runoff
38 Safety and Education for Pedestrians/Bicyclists
39 Establishment of Transportation Museums
40 Special Bridge
41 Youth Conservation Service
42 Training
43 Utilities
44 Other
45 Debt Service
47 Systematic Preventive Maintenance
APPENDIX B
Void