Loading...
RES 26-008RESOLUTION NO. 26-008 A RESOLUTION revising and extending the Transportation Improvement Program for an additional six (6) years. WHEREAS, pursuant to the requirements ofRCW 35.77.010, the City of Camas did, by Resolution No. 25-009 adopt a Transportation Improvement Program for the ensuing six ( 6) years; and WHEREAS, said law requires the City revise and extend said Transportation Improvement Program annually; and WHEREAS, pursuant to said law, the City Council of the City of Camas, being the legislative body of said City, did hold a public hearing on said revised Plan at 7 :00 p.m. at the Camas Municipal Center in Camas, Washington, on the 151 day of June, 2026; and NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAMAS AS FOLLOWS: I The Transportation Improvement Program heretofore adopted and revised by the City Engineer for the City of Camas, as submitted to the City Council for the City of Camas, be and the same is hereby adopted and extended for an additional six (6) year period from the date thereof. II The City Clerk shall file a copy of said revised Transportation Improvement Program for the ensuing six (6) years, together with a copy of this Resolution, with the Secretary of Transportation of the State of Washington. Resolution No. 26-008 Page2 PASSED by the Council and APPROVED by the Mayor this l 51h day of June, 2026. ATTEST: _ _,_LJ"""'-1 _::·~::::.=-i,_____,,_-=-----""'=-s __ _ Clerk City Attorney FROM: 2027 TO: 2032 Hearing Date: 6/1/2026 Adoption Date: 6/15/2026 Amend Date: Resolution No: 26-008 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 RW 1/1/2028 STBG 1000 381 1381 SR-500 (Everett St)CN 1/1/2030 21200 21200 21200 NE 35th Ave to NE 43rd Ave from: to: Widen with multi-use paths, illumination, roundabouts Totals 1000 0 21581 21200 0 1381 0 21200 CN 3/1/2027 3400 3400 3000 400 NW Lake Road @ NW Sierra St. from: to: Intersection improvements Totals 0 0 3400 3400 3000 400 0 ALL 1/1/2029 26400 26400 1000 25400 SR-500 (Everett St) NE Lake Rd to NE 35th Ave from: to: Widen with multimodal, illumination, bridge replacement, roundabout Totals 0 0 26400 26400 0 0 1000 25400 CN 6/1/2028 25000 25000 20000 5000 25000 North Shore Blvd. 400 Feet West of N Benton Drive to SR-500/Everett Rd from: to: New construction Includes Complete Streets, Bridge Totals 0 0 25000 25000 0 20000 5000 25000 ALL 6/1/2028 22700 22700 14000 8700 North Shore Blvd 23700 Block to 400feet west of N. Benton Dr. from: to: New Construction Includes Complete Streets, Roundabouts Totals 0 0 22700 22700 0 14000 8700 0 ALL 6/1/2029 3870 3870 1000 2870 NW Lake Road NW Lacamas Lane to Lacamas Lake Lodge from: to: Widening, sidewalk Totals 0 0 3870 3870 0 0 1000 2870 CE Yes P 0.45 24 P 00 0.13 1.60 Six Year Transportation Improvement Program Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC C. Project Title F. Project Description D. Road Name or Number Federally Funded Projects Only Envir. Type R/W RequiredState Funds Local Funds Total Funds 1st Expenditure Schedule (Local Agency) 4th thru 6th2nd 3rd Project Identification A. Pin/Project No. Washington State Department of Transportation Agency: City of Camas Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co. 03 Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy)Federal Fund Code Federal FundsStatus 0.40 0.50 03 P 01 P16 4 16 1 03 P E. Begin & End Termini G. Structure ID 01 P 216 16 3 Improvement Type(s)B. STIP ID 3 16 6 16 5 Page 1 of 8 FROM: 2027 TO: 2032 Hearing Date: 6/1/2026 Adoption Date: 6/15/2026 Amend Date: Resolution No: 26-008 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC C. Project Title F. Project Description D. Road Name or Number Federally Funded Projects Only Envir. Type R/W RequiredState Funds Local Funds Total Funds 1st Expenditure Schedule (Local Agency) 4th thru 6th2nd 3rd Project Identification A. Pin/Project No. Agency: City of Camas Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co. Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy)Federal Fund Code Federal FundsStatusE. Begin & End Termini G. Structure ID Improvement Type(s)B. STIP ID 3 ALL 1/1/2027 720 720 120 120 120 360 ADA Access Upgrades from: Citywide to: (Ongoing) Totals 0 0 720 720 120 120 120 360 PE 1/1/2032 1000 1000 1000 SR-500 (Everett St) NE 43rd Ave to N City Limits from: to: Widen with bike lanes, sidewalks two-way turn lane, illumination, roundabouts Totals 0 0 1000 1000 0 0 0 1000 ALL 1/1/2030 13000 13000 Crown Road from: SE 23rd St. to NE 3rd Ave. Multimodal, turn lanes and intersection improvements Totals 0 0 0 13000 0 0 0 13000 ALL 1/1/2030 WSDOT 80000 80000 80000 SR-14 West Camas Slough Bridge from: to: Widen to 4 lanes NOTE: PE phase began 1/2006 Totals 0 80000 0 80000 0 0 0 80000 ALL 1/1/2030 29300 29300 NE Goodwin Road/28th Street NW Camas Meadows Dr. to NE 232nd Ave. from: to: Widen to 5 lanes with bike lanes, sidewalk west of Ingle Widen to 3 lanes with bike lanes, sidewalk east of Ingle Totals 0 0 0 29300 0 0 0 29300 ALL 6/1/2030 2200 2200 North Shore Blvd. NE 232nd Ave. to 23700 Block from: to: New construction Includes Critical Areas and Alignment Investigation Totals 0 0 0 2200 0 0 0 2200 PE 1/1/2029 250 250 NW/NE 6th Avenue Corridor Improvements NW Norwood to NE Adams from: to: Access and multimodal upgrades Totals 0 0 0 250 0 0 0 250 04 0.00 0.55 1.72 0.50 1.70 0.83 CE Yes 16 8 16 28 03 P 1.3 P P 15 1500 12 14 7 9 12 10 P 17 11 04 14 13 03 P P P Page 2 of 8 FROM: 2027 TO: 2032 Hearing Date: 6/1/2026 Adoption Date: 6/15/2026 Amend Date: Resolution No: 26-008 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC C. Project Title F. Project Description D. Road Name or Number Federally Funded Projects Only Envir. Type R/W RequiredState Funds Local Funds Total Funds 1st Expenditure Schedule (Local Agency) 4th thru 6th2nd 3rd Project Identification A. Pin/Project No. Agency: City of Camas Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co. Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy)Federal Fund Code Federal FundsStatusE. Begin & End Termini G. Structure ID Improvement Type(s)B. STIP ID 3 04 P .50 PE 1/1/2030 5 5 NW Brady Road NW McIntosh Road to West City Limits from: to: Road, Bike & Pedestrian Improvements Totals 0 0 0 5 0 0 0 5 15 P 1.2 PE 1/1/2031 5 5 NW McIntosh Road NW Brady Rd. to NW 11th Ave. from: to: Widening, bike lanes, sidewalk Totals 0 0 0 5 0 0 0 5 ALL 1/1/2031 6480 6480 NE 43rd Avenue from: SR-500 to: East City Limits Widen to 3 lanes with bike lanes, sidewalk Totals 0 0 0 6480 0 0 0 6480 ALL 1/1/2030 1735 1735 Downtown Infrastructure NE 3rd to NE 7th, NE Adams to NE Garfield from: to: SWPO Pavement and sidewalk Rehab, ADA upgrades Totals 0 0 0 1735 0 0 0 1735 PE 1/1/2032 5 5 North Dwyer Creek Master Plan Street "B" NW Friberg St./Strunk to NW Larkspur St. from: to: New construction Totals 0 0 0 5 0 0 0 5 03 P 0.40 PE 1/1/2031 5 5 NW Payne Street NW Lake Rd. to NW Camas Meadows Dr. from: to: Widening, bike lanes, sidewalk Totals 0 0 0 5 0 0 0 5 04 P 0.23 ALL 1/1/2030 650 650 NW 23rd Avenue NW Astor to NW Sierra from: to: Widening, sidewalk Totals 0 0 0 650 0 0 0 650 P06 0 03 P 0.36 15 17 20 17 0.90 17 15 16 00 17 00 18 19 1416 19 P Page 3 of 8 FROM: 2027 TO: 2032 Hearing Date: 6/1/2026 Adoption Date: 6/15/2026 Amend Date: Resolution No: 26-008 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC C. Project Title F. Project Description D. Road Name or Number Federally Funded Projects Only Envir. Type R/W RequiredState Funds Local Funds Total Funds 1st Expenditure Schedule (Local Agency) 4th thru 6th2nd 3rd Project Identification A. Pin/Project No. Agency: City of Camas Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co. Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy)Federal Fund Code Federal FundsStatusE. Begin & End Termini G. Structure ID Improvement Type(s)B. STIP ID 3 15 P 0.64 PE 1/1/2027 5 5 North Dwyer Creek Master Plan Street "A" NW Lake Rd. to NW Camas Meadows Dr. from: to: New construction Totals 0 0 0 5 5 0 0 0 28 P 0.15 CN 1/1/2030 250 250 NW Leadbetter Drive NW Lake Rd. to NW Fremont St. from: to: Sidewalk / path Totals 0 0 0 250 0 0 0 250 ALL 6/1/2030 600 600 NE 28th Street & NE 232nd Avenue from: to: Intersection improvements Totals 0 0 0 600 0 0 0 600 03 P 0.62 PE 1/1/2030 5 5 NW Astor Street/NW 11th Avenue NW 16th Ave. to McIntosh Rd. from: to: Widening, bike lanes, sidewalk Totals 0 0 0 5 0 0 0 5 03 P 0.51 PE 1/1/2029 5 5 NW 18th Avenue, et al NW Astor to NW 16th, include NW Hood from: to: Widen curb, sidewalk Totals 0 0 0 5 0 0 0 5 01 P 0.18 PE 1/1/2030 5 5 NW 20th Ave Extension NW Sage St to NW 18th Ave from: to: New Construction with multimodal Totals 0 0 0 5 0 0 0 5 PE 1/1/2029 5 5 NW 18th Avenue NW Tidland St. to NW Brady Rd. from: to: Sidewalk / path Totals 0 0 0 5 0 0 0 5 27 01 P 0.26 25 04 19 26 2317 16 0.00 16 00 21 17 22 17 24 P Page 4 of 8 FROM: 2027 TO: 2032 Hearing Date: 6/1/2026 Adoption Date: 6/15/2026 Amend Date: Resolution No: 26-008 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC C. Project Title F. Project Description D. Road Name or Number Federally Funded Projects Only Envir. Type R/W RequiredState Funds Local Funds Total Funds 1st Expenditure Schedule (Local Agency) 4th thru 6th2nd 3rd Project Identification A. Pin/Project No. Agency: City of Camas Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co. Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy)Federal Fund Code Federal FundsStatusE. Begin & End Termini G. Structure ID Improvement Type(s)B. STIP ID 3 03 P 0.50 PE 1/1/2030 5 5 NW 18th Avenue NW 20th Extension to West City Limits from: to: Widening, bike lanes Totals 0 0 0 5 0 0 0 5 03 P 0.31 PE 1/1/2031 5 5 NW 43rd/NW Astor - NW Sierra to NW 38th Impr. from: to: Widening, bike lanes, sidewalk Totals 0 0 0 5 0 0 0 5 15 P 0.97 PE 1/1/2031 5 5 NE 232nd Avenue NE 28th to NE North Shore Blvd. from: to: Widen to 3 lanes with bike lanes, sidewalk Totals 0 0 0 5 0 0 0 5 PE 1/1/2031 5 5 NE Woodburn Drive SE 283rd Ave. to SE 15th St. from: to: New construction Includes 23rd St. realignment Totals 0 0 0 5 0 0 0 5 15 P 0.59 PE 1/1/2031 5 5 SE 15th Street/Nourse Road from: Camas High School to: NE 283rd Ave. Widen to 3 lanes with bike lanes, sidewalk Totals 0 0 0 5 0 0 0 5 15 P 0.67 PE 1/1/2031 5 5 NE 18th Street NE 192nd Ave. to NE Goodwin Rd. from: to: New construction (potential alternate alignment) Totals 0 0 0 5 0 0 0 5 15 P 0.50 PE 1/1/2031 5 5 NE 28th Street NE 232nd Ave. to NE 242nd Ave. from: to: Widen to 3 lanes with bike lanes Totals 0 0 0 5 0 0 0 5 33 07 01 P .70 17 30 16 29 00 31 28 32 34 00 17 16 Page 5 of 8 FROM: 2027 TO: 2032 Hearing Date: 6/1/2026 Adoption Date: 6/15/2026 Amend Date: Resolution No: 26-008 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC C. Project Title F. Project Description D. Road Name or Number Federally Funded Projects Only Envir. Type R/W RequiredState Funds Local Funds Total Funds 1st Expenditure Schedule (Local Agency) 4th thru 6th2nd 3rd Project Identification A. Pin/Project No. Agency: City of Camas Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co. Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy)Federal Fund Code Federal FundsStatusE. Begin & End Termini G. Structure ID Improvement Type(s)B. STIP ID 3 15 P 0.20 PE 1/1/2031 5 5 NW Camas Meadows Drive NE 13th St. to NE 18th St. from: to: New construction (potential alternate alignment) Totals 0 0 0 5 0 0 0 5 PE 1/1/2031 5 5 NE 242nd Avenue NE 28th St. to NE North Shore Blvd. from: to: Widen to 3 lanes with bike lanes, sidewalk Totals 0 0 0 5 0 0 0 5 01 P 0.25 PE 6/1/2031 5 5 NW Maryland Street NW 19th to NW 24th from: to: New construction Totals 0 0 0 5 0 0 0 5 15 P 00 PE 6/1/2031 5 5 NW Pacific Rim @ Parker Street from: to: Traffic signal Totals 0 0 0 5 0 0 0 5 03 P 1.30 PE 6/1/2031 5 5 NE Ingle Road-NE Goodwin to N City Limits Goodwin to N City Limits from: to: widen to 3 lanes with bike lanes, sidewalk Totals 0 0 0 5 0 0 0 5 01 P 0.80 PE 1/1/2031 5 5 SE 8th St / 271st Ave from: SR-500 to: 15th St Totals 0 0 0 5 0 0 0 5 ALL 1/1/2027 5450 5450 5000 450 SR500 (Everett St) @ NE Everett Dr from: to: Roundabout Totals 0 0 5450 5450 5000 450 0 0 01 P4116 36 38 00 15 P 0.70 40 35 16 37 00 19 16 17 39 09 Page 6 of 8 FROM: 2027 TO: 2032 Hearing Date: 6/1/2026 Adoption Date: 6/15/2026 Amend Date: Resolution No: 26-008 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC C. Project Title F. Project Description D. Road Name or Number Federally Funded Projects Only Envir. Type R/W RequiredState Funds Local Funds Total Funds 1st Expenditure Schedule (Local Agency) 4th thru 6th2nd 3rd Project Identification A. Pin/Project No. Agency: City of Camas Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co. Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy)Federal Fund Code Federal FundsStatusE. Begin & End Termini G. Structure ID Improvement Type(s)B. STIP ID 3 01 P 00 ALL 1/1/2028 3175 3175 2700 475 North Shore Blvd @ 24800 BLK from: to: Roundabout Totals 0 0 3175 3175 0 2700 475 0 01 P 00 ALL 1/1/2028 3175 3175 3000 175 North Shore Blvd @ NE 252nd Ave from: to: Roundabout Totals 0 0 3175 3175 0 3000 175 0 15 P 00 PE 1/1/2031 5 5 NE 28th Street @ 242nd Avenue from: to: Intersection improvements Totals 0 0 0 5 0 0 0 5 PE 1/1/2031 5 5 SR-500 @ NE 14th Ave. from: to: Controlled Access Totals 0 0 0 5 0 0 0 5 47 P 00 CN 6/1/2027 9000 9000 1500 1500 1500 4500 Pavement Treatments (maintenance & preservation) from: Overlays, surface treatmentsto: Totals 0 0 9000 9000 1500 1500 1500 4500 04 P 00 ALL 1/1/2027 1500 250 250 250 750 Reconstructs from: Citywide to: Totals 0 0 0 1500 250 250 250 750 28 P 00 ALL 1/1/2027 300 300 50 50 50 150 Sidewalk Projects from: Sidewalk installations Citywide, including curb rampsto: Totals 0 0 300 300 50 50 50 150 4800 16 45 16 44 16 42 00 47 00 46 16 43 04 P 00 Page 7 of 8 FROM: 2027 TO: 2032 Hearing Date: 6/1/2026 Adoption Date: 6/15/2026 Amend Date: Resolution No: 26-008 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTC C. Project Title F. Project Description D. Road Name or Number Federally Funded Projects Only Envir. Type R/W RequiredState Funds Local Funds Total Funds 1st Expenditure Schedule (Local Agency) 4th thru 6th2nd 3rd Project Identification A. Pin/Project No. Agency: City of Camas Functional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co. Project Costs in Thousands of Dollars Fund Source Information State Fund Code Project PhasePhase Start (yyyy)Federal Fund Code Federal FundsStatusE. Begin & End Termini G. Structure ID Improvement Type(s)B. STIP ID 3 28 P 00 ALL 1/1/2028 250 50 50 150 Shared Path Improvements Citywide Includes NW Norwood Dr Totals 0 0 0 250 0 50 50 150 CN 4/1/2027 HSIP 930 930 930 20 20 60 Safety Projects Future safety projects Includes traffic revisions, NW Lake Rd Safety Improvements Totals 930 0 0 930 930 20 20 60 00 49 00 50 21 S 00 Page 8 of 8 Notes •This 6-Year TIP has been developed to meet the requirements of RCW 35.77.010, to assure a coordinated transportation program for the State of Washington. •Projects identified are NOT fully funded; however, the City can apply for different types of State/Federal Funding for those projects on the TIP. •The City Council’s intent is to use this as a prioritized framework to guide transportation decisions in coordination with the more detailed and technical Transportation System Plan. City of Camas 2027 – 2032 Six Year Street Priorities SR 500 (Everett St)1 Lake Rd. & NW Sierra St. Roundabout2 SR 500 (Everett St)3 North Shore Blvd.4 North Shore Blvd.5 NW Lake Rd6 ADA Access Upgrades Citywide7 SR 500 (Everett St/Rd)8 SE Crown Rd9 SR 14 – West Camas Slough Bridge10 NE Goodwin Rd/28th St11 NorthShore Blvd.12 NW/NE 6th Ave Corridor Imp13 NW Brady Rd 14 NW McIntosh Rd15 NE 43rd Ave16 Downtown Infrastructure17 Street "B" (North Dwyer Creek Area)18 NW Payne St.19 NW 23rd Ave20 Street "A" (North Dwyer Creek Area)21 NW LeadbetterDr Path22 NE 28th St & NE 232nd Ave Intersection Imp.23 NW Astor St.24 NW 16th Ave/Hood/18th Ave25 NW 20thAve. Extension26 NW 18th Ave Pedestrian Path27 NW 18th Ave/Payne Rd28 NW Astor St. /43rd Ave29 NE 232nd Ave30 NE Woodburn Dr.31 SE 15th St./Norse Rd32 NE 18th St (192nd to Goodwin)33 NE 28th St (232nd to 242nd)34 NW Camas Meadows Dr (West)35 NE 242nd Ave36 NW Maryland St37 NW Pacific Rim / Parker St. Signal38 NE Ingle Rd to N City Limits39 SE 8th St / 271stAve40 SR500 & Everett Dr Roundabout41 North Shore Blvd & 24800 Blk Roundabout42 North Shore Blvd & 252nd Roundabout43 See List for Additional PrioritiesSix Year Street Plan Map 2026-2031 (File 2027-2032 ( STIP ) 37 30 10 24 31 32 15 20 14 29 28 33 19 18 34 1 16 22 23 36 13 21 11 38 9 25 8 39 17 2 7 3 12 43 40 27 26 35 4 5 5 6 42 41 Appendices Six Year Form Coding Instructions Heading Agency Enter name of the sponsoring agency. County No. Enter the assigned number (see LAG Appendix 21.44). City No. Enter the assigned number (see LAG Appendix 21.45). MPO/RTPO Enter the name of the associated MPO (if located within urbanized area) or RTPO (if located in a rural area). Hearing Date Enter the date of the public hearing. Adoption Date Enter the date this program was adopted by council or commission. Resolution No. Enter Legislative Authority resolution number (if applicable.) Amendment Date Enter the date this program was amended by council or commission. Column Number 1. Functional Classification. Enter the appropriate 2-digit code denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be one approved by FHWA.) Description 00- No Classification Rural (< 5000 pop.) Urban (> 5000 pop.) 01 - Interstate 11 - Interstate 02 - Principal Arterials 12 - Freeways & Expressways 06 - Minor Arterials 14 - Other Principal Arterials 07 - Major Collector 16 - Minor Arterial 08 - Minor Collector 17 - Collector 09 - Local Access 19 - Local Access 1. Priority Numbers. Enter local agency number identifying agency project priority (optional). 2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route Number; (e) Beginning and Ending Termini (milepost or street names); and (f) Describe the Work to be Completed. 4. Improvement Type Codes. Enter the appropriate federal code number. SEE APPENDIX A 5. Funding Status. Enter the funding status for the entire project or phase that describes the current status. S - Project is ‘selected’ by the appropriate selection body and funding has been secured by the lead agency. P - Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code “00” if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that need to be relocated or are impacted by the construction project. C - Cable TV G - Gas O - Other P - Power S - Sewer (other than agency-owned) T - Telephone W – Water 8. Project Phase. Select the appropriate phase code of the project. PE - Preliminary Engineering, including Design (or Planning) RW - Right of Way or land acquisition CN - Construction only (or transit planning or equipment purchase) ALL - All Phases: from Preliminary Engineering through Construction 9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. SEE APPENDIX C 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. SEE APPENDIX C 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto-calculation in the “STIP Too” program.) 16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (For Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this project. (This is “required” for Federally funded projects, but may be filled in for state or locally funded projects.) EIS - Environmental Impact Statement EA - Environmental Assessment CE - Categorical Exclusion 21. R/W Certification. Click Y if Right of Way acquisition is or will be required. If yes, enter R/W Certification Date, if known. (This is “required” for Federally funded projects APPENDIX A IMPROVEMENT TYPE CODES 01 New Construction Roadway 03 Reconstruction, Added Capacity 04 Reconstruction, No Added Capacity 05 4R Maintenance Resurfacing 06 4R Maintenance - Restoration & Rehabilitation 07 4R Maintenance - Relocation 08 Bridge, New Construction 10 Bridge Replacement, Added Capacity 11 Bridge Replacement, No Added Capacity 13 Bridge Rehabilitation, Added Capacity 14 Bridge Rehabilitation, No Added Capacity 15 Preliminary Engineering 16 Right of Way 17 Construction Engineering 18 Planning 19 Research 20 Environmental Only 21 Safety 22 Rail/Highway Crossing 23 Transit 24 Traffic Management/Engineering - HOV 25 Vehicle Weight Enforcement Program 26 Ferry Boats 27 Administration 28 Facilities for Pedestrians and Bicycles 29 Acquisition of Scenic Easements and Scenic or Historic Sites 30 Scenic or Historic Highway Programs 31 Landscaping and Other Scenic Beautification 32 Historic Preservation 33 Rehab & Operation of Historic Transp. Buildings, Structures, Facilities 34 Preservation of Abandoned Railway Corridors 35 Control and Removal of Outdoor Advertising 36 Archaeological Planning & Research 37 Mitigation of Water Pollution due to Highway Runoff 38 Safety and Education for Pedestrians/Bicyclists 39 Establishment of Transportation Museums 40 Special Bridge 41 Youth Conservation Service 42 Training 43 Utilities 44 Other 45 Debt Service 47 Systematic Preventive Maintenance APPENDIX B Void