RES 24-010RESOLUTION NO. 24-010
A RESOLUTION revising and extending the Transportation
Improvement Program for an additional six (6) years .
WHEREAS, pursuant to the requirements ofRCW 35.77.010 , the City of Camas did, by
Resolution No . 23-005 adopt a Transportation Improvement Program for the ensuing six (6) years ;
and
WHEREAS, said law requires the City revise and extend said Transportation Improvement
Program annually; and
WHEREAS , pursuant to said law, the City Council of the City of Camas, being the
legislative body of said City, did hold a public hearing on said revised Plan at 7:00 p.m . at the Camas
Municipal Center in Camas, Washington, on the yd day of June, 2024; and
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAMAS
AS FOLLOWS:
I
The Transportation Improvement Program heretofore adopted and revised by the City
Engineer for the City of Camas, as submitted to the City Council for the City of Camas, be and the
same is hereby adopted and extended for an additional six ( 6) year period from the date thereof.
II
The City Clerk shall file a copy of said revised Transportation Improvement Program for the
ensuing six ( 6) years, together with a copy of this Resolution, with the Secretary of Transportation of
the State of Washington .
Resolution No. 24-010
Page2
PASSED by the Council and APPROVED by the Mayor t . ~day of June, 2024.
I
APPROVED as to form: ctd!JL_
City Attorney
Appendices
Six Year Form Coding Instructions
Heading
Agency Enter name of the sponsoring agency.
County No. Enter the assigned number (see LAG Appendix 21.44).
City No. Enter the assigned number (see LAG Appendix 21.45).
MPO/RTPO Enter the name of the associated MPO (if located within urbanized area) or
RTPO (if located in a rural area).
Hearing Date Enter the date of the public hearing.
Adoption Date Enter the date this program was adopted by council or commission.
Resolution No. Enter Legislative Authority resolution number (if applicable.)
Amendment Date Enter the date this program was amended by council or commission.
Column Number
1. Functional Classification. Enter the appropriate 2-digit code denoting the Federal
Functional Classification. (Note: The Federal Functional Classification must be one
approved by FHWA.)
Description
00- No Classification
Rural (< 5000 pop.) Urban (> 5000 pop.)
01 - Interstate 11 - Interstate
02 - Principal Arterials 12 - Freeways & Expressways
06 - Minor Arterials 14 - Other Principal Arterials
07 - Major Collector 16 - Minor Arterial
08 - Minor Collector 17 - Collector
09 - Local Access 19 - Local Access
1. Priority Numbers. Enter local agency number identifying agency project priority
(optional).
2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b)
Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route
Number;
(e) Beginning and Ending Termini (milepost or street names); and (f) Describe the Work
to be Completed.
4. Improvement Type Codes. Enter the appropriate federal code number.
SEE APPENDIX A
5. Funding Status. Enter the funding status for the entire project or phase that
describes the current status.
S - Project is ‘selected’ by the appropriate selection body and funding has been
secured by the lead agency.
P - Project is subject to selection by an agency other than the lead and is
listed for planning purposes. (Funding has not been determined.)
6. Total Length. Enter project length to the nearest hundredth (or code “00” if not
applicable).
7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that need to
be relocated or are impacted by the construction project.
C - Cable TV G - Gas
O - Other P - Power
S - Sewer (other than agency-owned) T - Telephone
W – Water
8. Project Phase. Select the appropriate phase code of the project.
PE - Preliminary Engineering, including Design (or Planning)
RW - Right of Way or land acquisition
CN - Construction only (or transit planning or equipment purchase)
ALL - All Phases: from Preliminary Engineering through Construction
9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the
selected phase of the project is actually expected to start.
10. Federal Fund Code. Enter the Federal Fund code from the table.
SEE APPENDIX C
11. Federal Funds. Enter the total federal cost (in thousands) of the phase
regardless of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed state funds
to be used on this project.
SEE APPENDIX C
13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase
regardless of when the funds will be spent.
14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase
regardless of when the funds will be spent.
15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto-calculation in the
“STIP Too” program.)
16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the
estimated expenditures (in thousands) of dollars by year. (For Local Agency use.)
20. Environmental Data Type. Enter the type of environmental assessment that will be
required for this project. (This is “required” for Federally funded projects, but may be
filled in for state or locally funded projects.)
EIS - Environmental Impact Statement
EA - Environmental Assessment
CE - Categorical Exclusion
21. R/W Certification. Click Y if Right of Way acquisition is or will be required. If yes,
enter R/W
Certification Date, if known. (This is “required” for Federally funded projects
APPENDIX A
IMPROVEMENT TYPE CODES
01 New Construction Roadway
03 Reconstruction, Added Capacity
04 Reconstruction, No Added Capacity
05 4R Maintenance Resurfacing
06 4R Maintenance - Restoration & Rehabilitation
07 4R Maintenance - Relocation
08 Bridge, New Construction
10 Bridge Replacement, Added Capacity
11 Bridge Replacement, No Added Capacity
13 Bridge Rehabilitation, Added Capacity
14 Bridge Rehabilitation, No Added Capacity
15 Preliminary Engineering
16 Right of Way
17 Construction Engineering
18 Planning
19 Research
20 Environmental Only
21 Safety
22 Rail/Highway Crossing
23 Transit
24 Traffic Management/Engineering - HOV
25 Vehicle Weight Enforcement Program
26 Ferry Boats
27 Administration
28 Facilities for Pedestrians and Bicycles
29 Acquisition of Scenic Easements and Scenic or Historic Sites
30 Scenic or Historic Highway Programs
31 Landscaping and Other Scenic Beautification
32 Historic Preservation
33 Rehab & Operation of Historic Transp. Buildings, Structures, Facilities
34 Preservation of Abandoned Railway Corridors
35 Control and Removal of Outdoor Advertising
36 Archaeological Planning & Research
37 Mitigation of Water Pollution due to Highway Runoff
38 Safety and Education for Pedestrians/Bicyclists
39 Establishment of Transportation Museums
40 Special Bridge
41 Youth Conservation Service
42 Training
43 Utilities
44 Other
45 Debt Service
47 Systematic Preventive Maintenance
APPENDIX B
Void
FROM: 2025 TO: 2030Hearing Date: 6/3/2024 Adoption Date: 6/17/2024Amend Date: Resolution No: 24-0101 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21PE 9/1/2024 STBG 475 1125 1600 600 800 200 32700SR-500 (Everett St)RW 1/1/2027 2300 2300 1500 800NE 35th Ave to NE 43rd Ave CN 1/1/2029 10600 10600 10600from: to:Widen with multi-use paths, illumination,roundaboutsTotals 0 475 0 14025 14500 600 800 1700 44100ALL 1/1/2024 4100 4100 1000 2700 400NW Lake Road@ NW Sierra St.from: to:Intersection improvementsTotals 0 0 0 4100 4100 1000 2700 400ALL 1/1/2027 18000 18000 1000 17000SR-500 (Everett St)NE Lake Rd to NE 35th Avefrom: to:Widen with multimodal, illumination,bridge replacement, roundaboutTotals 0 0 0 18000 18000 0 0 1000 17000ALL 6/1/2026 3740 3740 240 1000 2500NW Lake RoadNW Lacamas Lane to Lacamas Lake Lodgefrom: to:Widening, sidewalkTotals 0 0 0 3740 3740 0 240 1000 2500ALL 1/1/2025 720 720 120 120 120 360ADA Access Upgradesfrom: Citywide to:(Ongoing)Totals 0 0 0 720 720 120 120 120 36016 3 03 P 0.1328 P 0.000.50 CE Yes03 P 0.4524 P 00Project Identification A. Pin/Project No. Washington State Department of TransportationAgency: City of CamasFunctional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.Six Year Transportation Improvement ProgramTotal LengthUtility CodesCity No.: 0145 MPO/RTPO: RTCC. Project TitleF. Project DescriptionD. Road Name or NumberFederally Funded Projects OnlyEnvir. TypeR/W RequiredState Funds Local Funds Total Funds1stExpenditure Schedule (Local Agency)4th thru 6thImprovement Type(s)B. STIP ID32nd 3rdProject Costs in Thousands of DollarsFund Source InformationState Fund CodeProject PhasePhase Start (yyyy)Federal Fund CodeFederal FundsStatus21614 516 416 1 03 PE. Begin & End TerminiG. Structure IDReport Date: 6/11/2024 Page 1 of 11
FROM: 2025 TO: 2030Hearing Date: 6/3/2024 Adoption Date: 6/17/2024Amend Date: Resolution No: 24-0101 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Project Identification A. Pin/Project No. Agency: City of CamasFunctional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTCC. Project TitleF. Project DescriptionD. Road Name or NumberFederally Funded Projects OnlyEnvir. TypeR/W RequiredState Funds Local Funds Total Funds1stExpenditure Schedule (Local Agency)4th thru 6thImprovement Type(s)B. STIP ID32nd 3rdProject Costs in Thousands of DollarsFund Source InformationState Fund CodeProject PhasePhase Start (yyyy)Federal Fund CodeFederal FundsStatusE. Begin & End TerminiG. Structure IDALL 1/1/2030 1000 1000 1000SR-500 (Everett St)NE 43rd Ave to N City Limitsfrom: to:Widen with bike lanes, sidewalkstwo-way turn lane, illumination, roundaboutsTotals 0 0 0 1000 1000 0 0 0 1000ALL 1/1/2028 12150 12150Crown Roadfrom: SE 23rd St. to NE 3rd Ave.Multimodal, turn lanes and intersection improvementsTotals 0 0 0 0 12150 0 0 0 12150ALL 1/1/2028 WSDOT 45000 45000 45000SR-14 West Camas Slough Bridgefrom: to:Widen to 4 lanesNOTE: PE phase began 1/2006Totals 0 0 45000 0 45000 0 0 0 45000ALL 1/1/2028 28190 28190NE Goodwin Road/28th StreetNW Camas Meadows Dr. to NE 232nd Ave.from: to:Widen to 5 lanes with bike lanes, sidewalk west of IngleWiden to 3 lanes with bike lanes, sidewalk east of IngleTotals 0 0 0 0 28190 0 0 0 28190ALL 6/1/2027 18910 2000 16710Northshore Blvd.NE 242nd Ave. to SR-500/Everett Rd.from: to:New constructionIncludes Critical Areas and Alignment InvestigationTotals 0 0 0 0 18910 0 0 2000 1671016 6 03 P03 P 0.551.72P1501 P 2.0004 P 1.30.83CE Yes712 816 101617 9Report Date: 6/11/2024 Page 2 of 11
FROM: 2025 TO: 2030Hearing Date: 6/3/2024 Adoption Date: 6/17/2024Amend Date: Resolution No: 24-0101 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Project Identification A. Pin/Project No. Agency: City of CamasFunctional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTCC. Project TitleF. Project DescriptionD. Road Name or NumberFederally Funded Projects OnlyEnvir. TypeR/W RequiredState Funds Local Funds Total Funds1stExpenditure Schedule (Local Agency)4th thru 6thImprovement Type(s)B. STIP ID32nd 3rdProject Costs in Thousands of DollarsFund Source InformationState Fund CodeProject PhasePhase Start (yyyy)Federal Fund CodeFederal FundsStatusE. Begin & End TerminiG. Structure IDALL 6/1/2028 6130 6130Northshore Blvd.NE 232nd Ave. to NE 242nd Ave.from: to:New constructionIncludes Critical Areas and Alignment InvestigationTotals 0 0 0 0 6130 0 0 0 6130ALL 1/1/2028 250 250NW/NE 6th Avenue Corridor ImprovementsNW Norwood to NE Garfieldfrom: to:Access and multimodal upgradesTotals 0 0 0 0 250 0 0 0 250ALL 1/1/2028 2050 2050Bybee Road RealignmentSE 15th St. to NW 38th Ave.from: to:New constructionTotals 0 0 0 0 2050 0 0 2050ALL 1/1/2030 6230 6230NE 43rd Avenuefrom: SR-500 to: East City LimitsWiden to 3 lanes with bike lanes, sidewalkTotals 0 0 0 0 6230 0 0 0 6230ALL 1/1/2028 1670 1670Downtown InfrastructureNE 3rd to NE 7th, NE Adams to NE Garfieldfrom: to: SWPOPavement and sidewalk Rehab, ADA upgradesTotals 0 0 0 0 1670 0 0 0 16700.36P0306 P 015 P 0.501.70P0401 P 0.051314 121700 1117 1400 15Report Date: 6/11/2024 Page 3 of 11
FROM: 2025 TO: 2030Hearing Date: 6/3/2024 Adoption Date: 6/17/2024Amend Date: Resolution No: 24-0101 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Project Identification A. Pin/Project No. Agency: City of CamasFunctional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTCC. Project TitleF. Project DescriptionD. Road Name or NumberFederally Funded Projects OnlyEnvir. TypeR/W RequiredState Funds Local Funds Total Funds1stExpenditure Schedule (Local Agency)4th thru 6thImprovement Type(s)B. STIP ID32nd 3rdProject Costs in Thousands of DollarsFund Source InformationState Fund CodeProject PhasePhase Start (yyyy)Federal Fund CodeFederal FundsStatusE. Begin & End TerminiG. Structure IDPE 1/1/2029 5 5North Dwyer Creek Master Plan Street "B"NW Friberg St./Strunk to NW Larkspur St.from: to:New constructionTotals 0 0 0 0 5 0 0 0 5PE 1/1/2030 5 5NW Payne StreetNW Lake Rd. to NW Camas Meadows Dr.from: to:Widening, bike lanes, sidewalkTotals 0 0 0 0 5 0 0 0 5ALL 1/1/2028 580 580NW 23rd AvenueNW Astor to NW Sierrafrom: to:Widening, sidewalkTotals 0 0 0 0 580 0 0 0 580PE 1/1/2025 5 5North Dwyer Creek Master Plan Street "A"NW Lake Rd. to NW Camas Meadows Dr.from: to:New constructionTotals 0 0 0 0 5 5 0 0 0CN 1/1/2028 210 210NW Leadbetter DriveNW Lake Rd. to NW Fremont St.from: to:Sidewalk / pathTotals 0 0 0 0 210 0 0 0 21028 P 0.1503 P 0.400.23P0415 P 0.640.90P1500 1617 1800 1919 172017Report Date: 6/11/2024 Page 4 of 11
FROM: 2025 TO: 2030Hearing Date: 6/3/2024 Adoption Date: 6/17/2024Amend Date: Resolution No: 24-0101 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Project Identification A. Pin/Project No. Agency: City of CamasFunctional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTCC. Project TitleF. Project DescriptionD. Road Name or NumberFederally Funded Projects OnlyEnvir. TypeR/W RequiredState Funds Local Funds Total Funds1stExpenditure Schedule (Local Agency)4th thru 6thImprovement Type(s)B. STIP ID32nd 3rdProject Costs in Thousands of DollarsFund Source InformationState Fund CodeProject PhasePhase Start (yyyy)Federal Fund CodeFederal FundsStatusE. Begin & End TerminiG. Structure IDALL 6/1/2028 190 190NE 28th Street & NE 232nd Avenuefrom: to:Intersection improvementsTotals 0 0 0 0 190 0 0 0 190PE 1/1/2028 5 5NW Brady RoadNW McIntosh to West City Limitsfrom: to:Bike & Pedestrian ImprovementsTotals 0 0 0 0 5 0 0 0 5PE 1/1/2029 5 5NW Astor Street/NW 11th AvenueNW 16th Ave. to McIntosh Rd.from: to:Widening, bike lanes, sidewalkTotals 0 0 0 0 5 0 0 0 5PE 1/1/2028 5 5NW 18th Avenue, et alNW Astor to NW 16th, include NW Hoodfrom: to:Widen curb, sidewalkTotals 0 0 0 0 5 0 0 0 5PE 1/1/2029 5 5NW 20th Ave ExtensionNW Sage St to NW 18th Avefrom: to:New Construction with multimodalTotals 0 0 0 0 5 0 0 0 519 25 0103 P 0.6203 P 0.51P 0.1804 P 0.0004 P .5017211716 2216 2423Report Date: 6/11/2024 Page 5 of 11
FROM: 2025 TO: 2030Hearing Date: 6/3/2024 Adoption Date: 6/17/2024Amend Date: Resolution No: 24-0101 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Project Identification A. Pin/Project No. Agency: City of CamasFunctional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTCC. Project TitleF. Project DescriptionD. Road Name or NumberFederally Funded Projects OnlyEnvir. TypeR/W RequiredState Funds Local Funds Total Funds1stExpenditure Schedule (Local Agency)4th thru 6thImprovement Type(s)B. STIP ID32nd 3rdProject Costs in Thousands of DollarsFund Source InformationState Fund CodeProject PhasePhase Start (yyyy)Federal Fund CodeFederal FundsStatusE. Begin & End TerminiG. Structure IDPE 1/1/2028 5 5NW 18th AvenueNW Tidland St. to NW Brady Rd.from: to:Sidewalk / pathTotals 0 0 0 0 5 0 0 0 5PE 1/1/2027 5 5NW 18th AvenueNW 20th Extension to West City Limitsfrom: to:Widening, bike lanesTotals 0 0 0 0 5 0 0 0 5PE 1/1/2030 5 5NW 43rd/NW Astor - NW Sierra to NW 38th Impr.from: to:Widening, bike lanes, sidewalkTotals 0 0 0 0 5 0 0 0 5PE 1/1/2030 5 5NE 232nd AvenueNE 28th to NE North Shore Blvd.from: to:Widen to 3 lanes with bike lanes, sidewalkTotals 0 0 0 0 5 0 0 0 5PE 1/1/2030 5 5NW McIntosh RoadNW Brady Rd. to NW 11th Ave.from: to:Widening, bike lanes, sidewalkTotals 0 0 0 0 5 0 0 0 515 P 1.203 P 0.5003 P 0.500.97P1501 P 0.261616 2816262717 2917 30Report Date: 6/11/2024 Page 6 of 11
FROM: 2025 TO: 2030Hearing Date: 6/3/2024 Adoption Date: 6/17/2024Amend Date: Resolution No: 24-0101 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Project Identification A. Pin/Project No. Agency: City of CamasFunctional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTCC. Project TitleF. Project DescriptionD. Road Name or NumberFederally Funded Projects OnlyEnvir. TypeR/W RequiredState Funds Local Funds Total Funds1stExpenditure Schedule (Local Agency)4th thru 6thImprovement Type(s)B. STIP ID32nd 3rdProject Costs in Thousands of DollarsFund Source InformationState Fund CodeProject PhasePhase Start (yyyy)Federal Fund CodeFederal FundsStatusE. Begin & End TerminiG. Structure IDPE 1/1/2030 5 5NE Woodburn DriveSE 283rd Ave. to SE 15th St.from: to:New constructionIncludes 23rd St. realignmentTotals 0 0 0 0 5 0 0 0 5PE 1/1/2030 5 5SE 15th Street/Nourse Roadfrom: Camas High School to: NE 283rd Ave.Widen to 3 lanes with bike lanes, sidewalkTotals 0 0 0 0 5 0 0 0 5PE 1/1/2030 5 5NE 18th StreetNE 192nd Ave. to NE Goodwin Rd.from: to:New construction(potential alternate alignment)Totals 0 0 0 0 5 0 0 0 5PE 1/1/2030 5 5NE 28th StreetNE 232nd Ave. to NE 242nd Ave.from: to:Widen to 3 lanes with bike lanesTotals 0 0 0 0 5 0 0 0 5PE 1/1/2030 5 5NW Camas Meadows DriveNE 13th St. to NE 18th St.from: to:New construction(potential alternate alignment)Totals 0 0 0 0 5 0 0 0 515 P 0.6715 P 0.5015 P 0.2001 P .7015 P 0.59070031333200351617 34Report Date: 6/11/2024 Page 7 of 11
FROM: 2025 TO: 2030Hearing Date: 6/3/2024 Adoption Date: 6/17/2024Amend Date: Resolution No: 24-0101 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Project Identification A. Pin/Project No. Agency: City of CamasFunctional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTCC. Project TitleF. Project DescriptionD. Road Name or NumberFederally Funded Projects OnlyEnvir. TypeR/W RequiredState Funds Local Funds Total Funds1stExpenditure Schedule (Local Agency)4th thru 6thImprovement Type(s)B. STIP ID32nd 3rdProject Costs in Thousands of DollarsFund Source InformationState Fund CodeProject PhasePhase Start (yyyy)Federal Fund CodeFederal FundsStatusE. Begin & End TerminiG. Structure IDPE 1/1/2030 5 5NE 242nd AvenueNE 28th St. to NE North Shore Blvd.from: to:Widen to 3 lanes with bike lanes, sidewalkTotals 0 0 0 0 5 0 0 0 5PE 6/1/2030 5 5NW Maryland StreetNW 19th to NW 24thfrom: to:New constructionTotals 0 0 0 0 5 0 0 0 5PE 6/1/2030 5 5NW Pacific Rim @ Parker Streetfrom: to:Traffic signalTotals 0 0 0 0 5 0 0 0 5PE 6/1/2030 5 5NE Ingle Road-NE Goodwin to N City LimitsGoodwin to N City Limitsfrom: to:widen to 3 lanes with bike lanes, sidewalkTotals 0 0 0 0 5 0 0 0 5PE 1/1/2030 5 5SE 8th St / 271st Avefrom: SR-500 to: 15th StTotals 0 0 0 0 5 0 0 0 509 40 01 P 0.8000P1503 P 1.3015 P 0.7001 P 0.2517 3916 3819363700Report Date: 6/11/2024 Page 8 of 11
FROM: 2025 TO: 2030Hearing Date: 6/3/2024 Adoption Date: 6/17/2024Amend Date: Resolution No: 24-0101 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Project Identification A. Pin/Project No. Agency: City of CamasFunctional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTCC. Project TitleF. Project DescriptionD. Road Name or NumberFederally Funded Projects OnlyEnvir. TypeR/W RequiredState Funds Local Funds Total Funds1stExpenditure Schedule (Local Agency)4th thru 6thImprovement Type(s)B. STIP ID32nd 3rdProject Costs in Thousands of DollarsFund Source InformationState Fund CodeProject PhasePhase Start (yyyy)Federal Fund CodeFederal FundsStatusE. Begin & End TerminiG. Structure IDPE 1/1/2030 5 5Northshore Road Cfrom: Northshore Blvd to: SE 252nd AveTotals 0 0 0 0 5 0 0 0 5PE 1/1/2030 5 5Northshore Road Efrom: Northshore Blvd to: Road CTotals 0 0 0 0 5 0 0 0 5PE 1/1/2030 5 5Northshore Road Afrom: Northshore Blvd to: Road CTotals 0 0 0 0 5 0 0 0 5PE 6/1/2030 5 5NE Ingle Road ExtensionGoodwin to 232nd Avefrom: to:New constructionTotals 0 0 0 0 5 0 0 0 5PE 1/1/2030 5 5NE 28th Street @ 242nd Avenuefrom: to:Intersection improvementsTotals 0 0 0 0 5 0 0 0 509 43 01 P 0.2009 41 01 P 1.3009 42 01 P 0.2515 P 1.0015 P 0000 444516Report Date: 6/11/2024 Page 9 of 11
FROM: 2025 TO: 2030Hearing Date: 6/3/2024 Adoption Date: 6/17/2024Amend Date: Resolution No: 24-0101 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Project Identification A. Pin/Project No. Agency: City of CamasFunctional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTCC. Project TitleF. Project DescriptionD. Road Name or NumberFederally Funded Projects OnlyEnvir. TypeR/W RequiredState Funds Local Funds Total Funds1stExpenditure Schedule (Local Agency)4th thru 6thImprovement Type(s)B. STIP ID32nd 3rdProject Costs in Thousands of DollarsFund Source InformationState Fund CodeProject PhasePhase Start (yyyy)Federal Fund CodeFederal FundsStatusE. Begin & End TerminiG. Structure IDPE 1/1/2030 5 5SR-500@ NE 14th Ave.from: to:Controlled AccessTotals 0 0 0 0 5 0 0 0 5PE 1/1/2030 5 5NE 232nd Avenue @ Ingle Extensionfrom: to:RoundaboutTotals 0 0 0 0 5 0 0 0 5CN 6/1/2025 6000 6000 1000 1000 1000 3000Pavement Treatments (maintenance & preservation)from:Overlays, surface treatmentsto:Totals 0 0 0 6000 6000 1000 1000 1000 3000ALL 1/1/205 1500 250 250 250 750Reconstructsfrom: Citywideto:Totals 0 0 0 0 1500 250 250 250 750ALL 1/1/2025 150 25 25 25 75Sidewalk Projectsfrom:Sidewalk installations Citywide, including curb rampsto:Totals 0 0 0 0 150 25 25 25 7504 P 0028 P 0004 P 0015 P 0047 P 0000 5000 4800 4749004616Report Date: 6/11/2024 Page 10 of 11
FROM: 2025 TO: 2030Hearing Date: 6/3/2024 Adoption Date: 6/17/2024Amend Date: Resolution No: 24-0101 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21Project Identification A. Pin/Project No. Agency: City of CamasFunctional ClassPriority NumberCo. No.: 06 Co. Name: Clark Co.Total LengthUtility CodesCity No.: 0145 MPO/RTPO: RTCC. Project TitleF. Project DescriptionD. Road Name or NumberFederally Funded Projects OnlyEnvir. TypeR/W RequiredState Funds Local Funds Total Funds1stExpenditure Schedule (Local Agency)4th thru 6thImprovement Type(s)B. STIP ID32nd 3rdProject Costs in Thousands of DollarsFund Source InformationState Fund CodeProject PhasePhase Start (yyyy)Federal Fund CodeFederal FundsStatusE. Begin & End TerminiG. Structure IDALL 1/1/2027 200 50 150Shared Path ImprovementsCitywidefrom:to:Totals 0 0 0 0 200 0 0 50 150RW 1/1/2025 HSIP 20 20 20 20Safety ProjectsCN 7/1/2025 HSIP 260 260 200 60 260from:Future safety projects to:Includes traffic revisions,City Wide Horizontal Curves Safety ImprovementsTotals 0 280 0 0 280 220 60 0 28021 S 0028 P 0000 520 51Report Date: 6/11/2024 Page 11 of 11
Notes
•This 6-Year TIP has been developed to meet the requirements of RCW
35.77.010, to assure a coordinated transportation program for the State of
Washington.
•Projects identified are NOT fully funded; however, the City can apply for
different types of State/Federal Funding for those projects on the TIP.
•The City Council’s intent is to use this as a prioritized framework to guide
transportation decisions in coordination with the more detailed and
technical Transportation System Plan.
City of Camas
2025 – 2030
Six Year Street Priorities
SR 500 (Everett St)1
Lake Rd. & NW Sierra St. Signal2
SR 500 (Everett St)3
NW Lake Rd 4
ADA Access Upgrades Citywide5
SR 500 (Everett St/Rd)6
SE Crown Rd7
SR 14 – West Camas Slough Bridge
8
NE Goodwin Rd/28th St9
Northshore East/West Arterial10
Northshore Blvd.11
NW/NE 6th Ave Corridor Imp12
BybeeRd13
NE 43rd Ave14
Downtown Infrastructure15
Street "B" (North Dwyer Creek Area)16
NW Payne St.17
NW 23rd Ave18
Street "A" (North Dwyer Creek Area)19
NW LeadbetterDr Path20
NE 28th St & NE 232nd Ave Intersection Imp.21
NW Brady Rd Ped & Bike Improvements22
NW Astor St.23
NW 16th Ave/Hood/18th Ave24
NW 20th Ave. Extension25
NW 18th Ave Pedestrian Path26
NW 18th Ave/Payne Rd27
NW Astor St. /43rd Ave28
NE 232nd Ave29
NW McIntosh Rd30
NE Woodburn Dr.31
SE 15th St./Norse Rd32
NE 18th St (192nd to Goodwin)33
NE 28th St (232nd to 242nd)34
NW Camas Meadows Dr (West)35
NE 242nd Ave36
NW Maryland St37
NW Pacific Rim / Parker St. Signal38
NE Ingle Rd to N City Limits39
SE 8th St / 271st Ave40
Northshore Road C41
Northshore Road E42
Northshore Road A43
Six Year Street Plan Map 2025-2030 (File 2025-2030 ( STIP )
37
29
8
23
31
32
30
18
22
28
27
33
17
16
34
1
14
20
13
21
36
12
19
9
38
7
24
6
39
15
2
5
4 3
11
41 42
43 10
40
26
25
35